Oscar Schmidt

Civil Engineer - Site Manager at Serveng Civilsan
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Castro, BR
Languages
  • Português Native or bilingual proficiency
  • Inglês Full professional proficiency
  • Espanhol Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Valdeci Cabrera

Teve o prazer em trabalhar com o Oscar na Serveng, ótima pessoa e profissional do mais alto nível.

Antonio Rodrigues Pereira

Excelente profissional de engenharia e ótimo relacionamento interpessoal. Dedicação incansável aos projetos que executa, possui de uma imensa qualificação profissional, o que contribui para a sua excelência nos resultados e a satisfação dos clientes.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Brazil
    • Construction
    • 400 - 500 Employee
    • Civil Engineer - Site Manager
      • Jul 2017 - Present

      PR-151/Rodonorte highway. Responsible for the construction of two brigdes, highway drainage and earthworks.

    • Civil Engineer - Project Manager
      • Oct 2015 - Jun 2017

      EPC Ventos Fortes Execution of the earthworks and foundations for 54 wind turbines, total of 113,5 MW to be installed. Each tower with 120 m high and made out of concrete, at the SERVENG Wind Farm. 1) Over 18.000,00 cubic metes of concrete fck 35 MPa and 1.850 ton of steel; 2) Over 756 concrete piles; 3) Steel frames made especially for this project, seting a higher productivity;

    • Civil Engineer - Site Manager
      • Dec 2014 - Oct 2015

      Port of Itajaí/SC Implementing of Reform and Realignment of pier 3 and 4 of the Port of Itajaí/SC: 1) Driving of 15,221.58 m of tubular steel pile; 2) Driving of 14,280.00 m of interlock steel frame; 3) Execution of 4265.17 cubic meters of underwater concrete fck 40 MPa; 4) Transport and assembly of 1843.00 cubic meters of pre molded concrete fck 40 MPa; 5) Release of 4336.00 cubic meters of concrete Fck 40 MPa cast in situ; 6) Installation of… Show more Port of Itajaí/SC Implementing of Reform and Realignment of pier 3 and 4 of the Port of Itajaí/SC: 1) Driving of 15,221.58 m of tubular steel pile; 2) Driving of 14,280.00 m of interlock steel frame; 3) Execution of 4265.17 cubic meters of underwater concrete fck 40 MPa; 4) Transport and assembly of 1843.00 cubic meters of pre molded concrete fck 40 MPa; 5) Release of 4336.00 cubic meters of concrete Fck 40 MPa cast in situ; 6) Installation of 12 fenders and bollards.

    • Civil engineer- Site Manager
      • Sep 2013 - Dec 2014

      Port of São Sebastião/SP Execution of the Reform and Stabilization of the structure of the Port of São Sebastião Pier and construction Dolphin mooring with interconnection structure. Main activities: 1) Execution 12422.00 m under water Jet Grouting (8,000.00 m of framed Jet Grouting) for enroncamento containment; 2) Execution 19635.00 m micropile of Ø 410 mm (13,037.00 m in soil and 6598.00 m in rock); 3) Execution of 8179.55 cubic meters of… Show more Port of São Sebastião/SP Execution of the Reform and Stabilization of the structure of the Port of São Sebastião Pier and construction Dolphin mooring with interconnection structure. Main activities: 1) Execution 12422.00 m under water Jet Grouting (8,000.00 m of framed Jet Grouting) for enroncamento containment; 2) Execution 19635.00 m micropile of Ø 410 mm (13,037.00 m in soil and 6598.00 m in rock); 3) Execution of 8179.55 cubic meters of concrete; 4) Construction of Dolphin mooring with 240 m tubular driving metal pile with Ø 914 mm and interconnection platform assembly; 5) Strengthening loading capacity of 40 Ø 2.00 m concrete piles for the 202 and 203 Pier´s of São Sebastião Port; 6) fenders and bollards installation.

    • Civil engineer
      • Jun 2013 - Sep 2013

      BRT Fortaleza/CE Implementation of Special Art Works in the implementation of the BRT of Fortaleza - Ceará, and Castelão stadium accesses interconnections for the 2014 World Cup . Among the main projects and activities, stands out: 1) Enlargement 1 bridge and execution of two bridges and one tunnel; 2) Execution of 18,000.00 m micropile; 3) Execution 10,000.00 m² diaphragm wall; 4) Execution of 2,500.00 cubic meters of concrete;

    • Civil engineer
      • Jan 2013 - Jun 2013

      Implementation of civil works of Plangás accesses at the OU-Reduc / Petrobras in Duque de Caxias / RJ. Main activities developed: 1) Execution and installation of 25 metal platforms on pipelines OU-Reduc; 2) Recovery of 1000.00 square meters of industrial flooring units OU-Reduc; 3) Recovery and enforcement of drainage units of the OU-Reduc;

    • Civil engineer
      • Aug 2012 - Dec 2012

      Implementation of São Luís / MA tramway. Main activities: 1) Planning of activities, allocation of equipment and material resources, subcontractors control, design teams and support in implementing procedures 2) Landglide works; 3) Dormant e and rail assembly; 4) Execution of the VLT platform;

    • Engenheiro Civil
      • Apr 2011 - Aug 2012

      Construction and deployment of U-1571 - CONTAMINATED WATER TREATMENT UNIT - WALNUT FILTER at OU-REDUC / PETROBRAS, whose purpose is to treat 1200m³ / h of water coming from the API separator, through polishing with chlorine and sent for reuse as industrial water in the process or dispose of the Iguaçu River, in view of the condition of service for renovation for the environmental license of the refinery, and the scope of work involves the provision of goods and provision of services related to… Show more Construction and deployment of U-1571 - CONTAMINATED WATER TREATMENT UNIT - WALNUT FILTER at OU-REDUC / PETROBRAS, whose purpose is to treat 1200m³ / h of water coming from the API separator, through polishing with chlorine and sent for reuse as industrial water in the process or dispose of the Iguaçu River, in view of the condition of service for renovation for the environmental license of the refinery, and the scope of work involves the provision of goods and provision of services related to basic design, detailed engineering, construction, electromechanical assembly, interconnections, conditioning and testing support for pre-operation and operation assisted, covering the following main services: 1) 836 driving piles, Ø 260 mm of prestressed concrete; 2) 2,500.00 cubic meters of concrete; 3) 1850 m² of interlocked pavement; • Planning of activities, allocation of equipment and material resources, subcontractors control, design teams and support in implementing procedures; • Monitoring of pre-established by the planning sector goals; • Piles execution; • Execution of civil works in accordance with the quality standards and SMS established by PETROBRAS; • RDO Issue - Daily Field Report for the planning sector; • Follow-up metal frame assembly services and pipe´s assembly; • Support the implementation of quality tests certifying the services performed.

    • Construction
    • 1 - 100 Employee
    • Civil engineer
      • Jan 2010 - Jan 2011

      - Expertise in the work production sector deployment of GASTAU Project (pipeline Caraguatatuba - Taubaté) PETROBRAS, involving four deep shaft's (OSVAP I, OSVAP II, III and OSVAP Ventilation Shaft) 540 m deep with use of North American and German technology, including the participation of experts from those countries in the process, allowing the transport of the gas extracted from the Mexilhão field in the Santos Basin, and will subsequently be implemented ducts for alcohol and oil… Show more - Expertise in the work production sector deployment of GASTAU Project (pipeline Caraguatatuba - Taubaté) PETROBRAS, involving four deep shaft's (OSVAP I, OSVAP II, III and OSVAP Ventilation Shaft) 540 m deep with use of North American and German technology, including the participation of experts from those countries in the process, allowing the transport of the gas extracted from the Mexilhão field in the Santos Basin, and will subsequently be implemented ducts for alcohol and oil transportation. This project covers the following key steps: • Survey roles of 540 m depth, for geotechnical studies of the geological rock; • Execution of Pre-Grouting holes for consolidation of the geological rock´s, by drilling using bottom hammer (HDHT) and cement injection; • Execution Ø pilot holes 12 ¼ "with German technology guidance, using direct circulation and bentonite slurry as a drilling fluid; • Implementation of the enlargement of pilot holes for Ø 68 "by drilling with reverse circulation using North American technology; • Pipe Descent 28 "for gas passage , with future pipelines of 20" and 30 "; • Cementing the annular space; • Execution of two pipes 9 5/8 "in diameter and 545 m deep, inserted into wells 12 ¼" diameter, aiming to anticipate the passage of gas, on a provisional basis, and during drilling and Cementing, Halliburton technology was used used in oil wells. Show less - Expertise in the work production sector deployment of GASTAU Project (pipeline Caraguatatuba - Taubaté) PETROBRAS, involving four deep shaft's (OSVAP I, OSVAP II, III and OSVAP Ventilation Shaft) 540 m deep with use of North American and German technology, including the participation of experts from those countries in the process, allowing the transport of the gas extracted from the Mexilhão field in the Santos Basin, and will subsequently be implemented ducts for alcohol and oil… Show more - Expertise in the work production sector deployment of GASTAU Project (pipeline Caraguatatuba - Taubaté) PETROBRAS, involving four deep shaft's (OSVAP I, OSVAP II, III and OSVAP Ventilation Shaft) 540 m deep with use of North American and German technology, including the participation of experts from those countries in the process, allowing the transport of the gas extracted from the Mexilhão field in the Santos Basin, and will subsequently be implemented ducts for alcohol and oil transportation. This project covers the following key steps: • Survey roles of 540 m depth, for geotechnical studies of the geological rock; • Execution of Pre-Grouting holes for consolidation of the geological rock´s, by drilling using bottom hammer (HDHT) and cement injection; • Execution Ø pilot holes 12 ¼ "with German technology guidance, using direct circulation and bentonite slurry as a drilling fluid; • Implementation of the enlargement of pilot holes for Ø 68 "by drilling with reverse circulation using North American technology; • Pipe Descent 28 "for gas passage , with future pipelines of 20" and 30 "; • Cementing the annular space; • Execution of two pipes 9 5/8 "in diameter and 545 m deep, inserted into wells 12 ¼" diameter, aiming to anticipate the passage of gas, on a provisional basis, and during drilling and Cementing, Halliburton technology was used used in oil wells. Show less

    • Engenheiro Civil
      • 2011 - 2011

Education

  • Universidade Federal do Rio Grande do Sul / UFRGS
    Bacharelado em Engenharia, Engenharia Civil
  • Fundação Getulio Vargas / FGV
    Cursando Pós Graduação e Gestão de Projetos
    2013 - 2014
  • Universidade Federal do Rio Grande do Sul
    Bacharelado em Engenharia, Engenharia Civil
  • Universidade Federal do Rio Grande do Sul
    Bacharelado em Engenharia, Engenharia Civil
  • Universidade Federal do Rio Grande do Sul
    Engenharia Civil

Community

You need to have a working account to view this content. Click here to join now