Robert Gaitanaru

I worked with Osama for a 3 year in West Qurna 2 Project. He is good team mate , job oriented and example in front of the team. His sound knowledge regarding his job is admirable.Everyone appreciates and enjoys his work. I recommended him to all and I wish him a good career.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certified Reliability Engineer (CRE)
    ASQ - World Headquarters
    Sep, 2019
    - Oct, 2024
  • Root cause Analysis Team Leader
    RCA instiute
    Apr, 2019
    - Oct, 2024
  • Primavera
    Arab Academy for Science, Technology & Maritime Transport
    Aug, 2003
    - Oct, 2024
  • VIBRATION ANALYST CAT III
    Vibration Institute
    Jan, 2017
    - Oct, 2024
  • CMRP
    SMRP
    Aug, 2018
    - Oct, 2024
  • Vibration CAT II
    Mobius Institute
    Nov, 2008
    - Oct, 2024
  • PMP Attendance
    Amideast (American Center - Alexandria)

Experience

    • Saudi Arabia
    • Utilities
    • 1 - 100 Employee
    • Reliability, Team Leader CBM
      • Jul 2017 - Present

      Managing business reliability for plant rotating equipment inside Power Plant under Rabigh Power Company. Major focusing areas are maintenance and facility performance. Developing an overall reliability program to improve the business reliability covering all services and implementation working with other plant departments. This program includes all items related to the maintenance program, work quality, spare parts, etc. Duties & Responsibilities: Manage all performance engineering and condition monitoring programs and activities Prepare and submit relevant reports. Tasks for Reliability Enhancement Program. Conduct and issue report for scheduled performance tests. RCA Team Leader. Perform Hazop Study. Perform Lub oil analysis.

    • Senior Condition Monitoring Engineer.
      • Sep 2014 - Jun 2017

      Implementation of condition monitoring system. Perform Machinery Diagnose Condition to achieve reliability of rotating equipment using vibration analysis, endoscope…. Inspection includes all onshore rotating equipment (Nuovo Pignone Mark 6 Gas Turbine, fuel gas compressor and pumps) in all site plants. Main responsibilities: -Implementation of machine condition report and standard usage. -Responsible for the day to day plant Condition Monitoring activities throughout the plant as per the program and report accordingly. -The Offline data collected by using analyzers portable data collector. -Rotating equipment general troubleshooting. -Carried out acceptance tests and commissioning for new/repaired rotating equipment in accordance with international standards. -Analyze machine condition data using BENTLY NEVADA online system. -Regular review of lube oil analysis results. -Preparation and execution of rotating and static equipment vibration surveys to rectify the root cause of excessive vibration. -Prompt reporting on detected failures and malfunctions both developed and developing. -Preparing and issue of quarterly condition monitoring reports. -Participation to failure root causes analysis (FRCA) studies. -Engineering supervision of execution of rotor alignment, inspection, repair and replacement of couplings, bearings and other components of rotating equipment where a poorly performed maintenance could cause the equipment excessive vibration. -Rotating equipment field balancing and workshop rotor balancing with a balancing machine. -Close cooperation with plant instrumentation team and Bentley Nevada service engineers to ensure correct performance of machinery monitoring systems. -Coaching and support for other personnel in area of condition monitoring. -Guiding technicians in carrying out vibration analysis & other data collected to diagnose / troubleshoot rotating machinery problems and recommend remedial measures.

    • Condition Monitoring Engineer. Vibration Specialist
      • Feb 2012 - Jul 2014

      Manager of Condition Monitoring Project. KJO Site (www.KJO.com.sa) * Maintain of Condition Monitoring Contract Scope, Time and Cost. Perform Condition Monitoring and Machinery Diagnose to achieve reliability of rotating equipment as a part of “Reliability Center Maintenance Department”. Inspection includes all onshore/offshore rotating equipment (Gas Turbine, gas compressor and pumps). Inspection includes all site plants (Desalter, Power Plant, Gas Plant, Water Treatment Facility, and Water Desalination Plant) The main responsibilities: -Managing Work as Team Leader. -Supervision of schedule plan for preventive maintenance program of rotating. -Supervision maintenance activities implemented as requested. -Review P&ID related to all equipment as needed. -Ensure compliance with all procedures, instruction and control issue related to safety, quality and environment consideration. -Issue a Condition Monitoring Report. -Carried out acceptance tests and commissioning for new/repaired rotating equipment in accordance with international standards. -Apply international standard (API, ISO, BP, and Aramco). -Analyze machine condition data using BENTLY NEVADA online system. Values add and Personal Achievements: -Preparing a complete criticality engineering study assisting engineering department to implement vibration online project. -Basic knowledge of Meridium software “Asset Performance Management”. -Follow up corrective Work Orders. -Performing vibration measurement techniques and tests (Bump test, Run up and Coast down test, ODS, Cross Channel measurement, Phase Analysis, long time wave form, Orbit). -Good User DLI – DCX vibration device. -Good knowledge of working with CSI analyzers 2130. -Performing LASER alignment jobs using. (SKF laser kit).

    • Egypt
    • Libraries
    • 700 & Above Employee
    • A\Head of Failure Analysis section
      • Jul 2006 - Jan 2010

      Old Job: -- Initiate and Establish project of FMEA. -- Implementation the flow chart of predictive maintenance department strategy. -- Study, analysis and verification rotating machine problems using " Vibration analyzer, thermal image, laser shaft alignment and belt tension" devices. -- Keep record for each failure or accident. -- Prepare "Root cause analysis" reports of main problems. Old Job: -- Initiate and Establish project of FMEA. -- Implementation the flow chart of predictive maintenance department strategy. -- Study, analysis and verification rotating machine problems using " Vibration analyzer, thermal image, laser shaft alignment and belt tension" devices. -- Keep record for each failure or accident. -- Prepare "Root cause analysis" reports of main problems.

    • Construction Engineering
      • Jun 2005 - Feb 2006

      Responsible for HVAC system construction in Fourseasons hotel, Apartments, retail, cinemas, offices and related parking accommodation. Total area is 400,000m² at a projected construction cost of $ 250M. http://www.fourseasons.com/alexandria/ Responsible for HVAC system construction in Fourseasons hotel, Apartments, retail, cinemas, offices and related parking accommodation. Total area is 400,000m² at a projected construction cost of $ 250M. http://www.fourseasons.com/alexandria/

    • Auditing Engineer
      • Jan 2005 - Jan 2006

      *Inspection all the Mechanical equipment of Bibliotheca Alexandrina and prepare technical reports declare condition of static/rotating equipment. *Initiate of snag list required form Chif Eng. *Inspection all the Mechanical equipment of Bibliotheca Alexandrina and prepare technical reports declare condition of static/rotating equipment. *Initiate of snag list required form Chif Eng.

    • Technical office A\Manager
      • Sep 2001 - Dec 2003

      * Prepare workshop drawing. * Follow up troubleshooting occurs in workshop. * Using AutoPOL (Autodesk Product) to up-rolling non-uniform shapes. * Prepare workshop drawing. * Follow up troubleshooting occurs in workshop. * Using AutoPOL (Autodesk Product) to up-rolling non-uniform shapes.

    • Mechanical Engineer
      • Sep 2001 - Jan 2003

      Greater Cairo Westwater Treatment Project "El-Gabal El-Asfar", Degremont Company My responsible is to generate Isometric Layout drawing for project Pipe works and Tanks. Greater Cairo Westwater Treatment Project "El-Gabal El-Asfar", Degremont Company My responsible is to generate Isometric Layout drawing for project Pipe works and Tanks.

Education

  • Alexandria University
    Diploma, Heating, Ventilation, Air Conditioning and Refrigeration Engineering Technology
    2001 - 2003
  • Alexandria University
    Bachelor of Science (BSc), Mechanical Engineering