Experience
-
Summit Structures Ltd
-
United Kingdom
-
Project Manager
-
May 2021 - Present
-
-
-
Mackin Limited
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
Senior Engineer
-
Jul 2020 - Jan 2023
-
-
-
J. Murphy & Sons Limited
-
United Kingdom
-
Civil Engineering
-
700 & Above Employee
-
Senior Engineer
-
Apr 2020 - Jul 2020
Setting out for all External Works, Drainage, RC Structures and Services. Carrying out As-built surveys and completing all QA documentation. Acting as the main point of call for technical advice. Setting out for all External Works, Drainage, RC Structures and Services. Carrying out As-built surveys and completing all QA documentation. Acting as the main point of call for technical advice.
-
-
-
Carey Group plc
-
United Kingdom
-
Medical Practices
-
Site Engineer
-
Apr 2015 - Apr 2020
National Satellite Testing Facility, Didcot (Oct 2019 - April 2020) – Substructure package Setting out for holding down bolts, RC structure, steel frame, drainage, services and external works. Issuing of all site permits. All site Quality Control including ITPs. Writing method statements and lift plans. Ordering all materials including reinforcement. Carrying out all pre pour checks. As-built surveys. Acting as the main point of call for technical advice. Graven Hill, Bicester (Nov 2017 - Oct 2019) – Infrastructure and housing package, including 278 Works Setting out for road construction, drainage, foundations, services and external works. Ordering of materials and writing lift plans for excavators / cranes. As-built surveys, Quality Control. Liaising with Local Authority and arranging handovers. Barking Riverside, London (June 2017 - Nov 2017) – Roads and drainage package Setting out for road construction, pumping station and services. As-built surveys, Quality Control, method statements and lift plans. Dreamland, Margate (Feb 2017 - June 2017) – Hard landscaping package Setting out for hard landscaping. Managing a group of six Engineers. Providing all setting out information to engineers. As-built surveys, RFIs and liaising with designers. Yellow Car Park, Wembley (June 2016 - Feb 2017) – Drainage and resurfacing package Setting out for drainage and surfacing. RFIs, As-built surveys, Quality Control, method statements and lift plans. One The Elephant, London (April 2015 - June 2016 – Hard landscape package Setting out for all hard landscaping and drainage. As-built surveys, RFIs, ordering materials and liaising with client. Show less
-
-
-
J. Coffey
-
United States
-
Individual and Family Services
-
Site Manager
-
Nov 2013 - Nov 2014
-
-
-
McGee Group
-
United Kingdom
-
Leasing Non-residential Real Estate
-
Site Engineer
-
Aug 2011 - Apr 2013
-
-
-
-
Site Engineer
-
Jan 2010 - Jul 2011
-
-
-
-
Site Engineer
-
Mar 2005 - Jan 2010
-
-
Education
-
Oaklands College
HNC, Civil Engineering -
St James Catholic High School