Oliver Teasdale

Rigger at Harris Pye Engineering Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Rigger
      • Jul 2017 - Present

    • Rigger
      • Jul 2017 - Jul 2017

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Rigger
      • Aug 2016 - Present

    • United Kingdom
    • Shipbuilding
    • 100 - 200 Employee
    • Rigger
      • Jul 2016 - Present

    • Rigger
      • Jul 2016 - Present

    • Rigger
      • Aug 2015 - Present

    • Oil and Gas
    • 700 & Above Employee
    • Rigger
      • Aug 2014 - Present

      Currently working in Holland Onboard of the Pioneering spirit as a Rigger level 3 and Banksman/slinger attaching heavy spools and steel structures and high pressured hoses which will be used to pick up and manoeuvre/transport offshore large platforms and Riggs. Some of the work scope consists of positioning two fifty five tonne cylinders at the end of each support beam and then position four large manifolds underneath each cylinder. Positioning large hydraulic pipes which are placed in and around the cylinders and all the way along the beam.

    • United Kingdom
    • Industrial Machinery Manufacturing
    • 200 - 300 Employee
    • Rigger
      • May 2016 - Jun 2016

  • Unit birwelco engineering worldwide
    • Essar stanlow oil and gas refinery
    • Rigger
      • Feb 2016 - Feb 2016

    • Rigger
      • Jul 2015 - Jul 2015

    • United Kingdom
    • Mechanical Or Industrial Engineering
    • 300 - 400 Employee
    • Rigger
      • Apr 2014 - Jun 2014

      Self- employment Rigger Borwin Beta…Platform…subcontract to….ALE Heavy Lifting Removal of high pressured hydraulic jacks. Removal of heavy duty strands from sea bed.​​ Removal of 8te strand jacks. Rigging up lifting frames. Slinging power packs units into position and movement of parts from ships to platform. Self- employment Rigger Borwin Beta…Platform…subcontract to….ALE Heavy Lifting Removal of high pressured hydraulic jacks. Removal of heavy duty strands from sea bed.​​ Removal of 8te strand jacks. Rigging up lifting frames. Slinging power packs units into position and movement of parts from ships to platform.

Community

You need to have a working account to view this content. Click here to join now