Oliver Teasdale
Rigger at Harris Pye Engineering Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Harris Pye
-
United Arab Emirates
-
Oil and Gas
-
1 - 100 Employee
-
Rigger
-
Jul 2017 - Present
-
-
Rigger
-
Jul 2017 - Jul 2017
-
-
-
MECHTECH ENGINEERS
-
India
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Rigger
-
Aug 2016 - Present
-
-
-
A&P Group Limited
-
United Kingdom
-
Shipbuilding
-
100 - 200 Employee
-
Rigger
-
Jul 2016 - Present
-
-
-
-
Rigger
-
Jul 2016 - Present
-
-
-
-
Rigger
-
Aug 2015 - Present
-
-
-
Allseas
-
Oil and Gas
-
700 & Above Employee
-
Rigger
-
Aug 2014 - Present
Currently working in Holland Onboard of the Pioneering spirit as a Rigger level 3 and Banksman/slinger attaching heavy spools and steel structures and high pressured hoses which will be used to pick up and manoeuvre/transport offshore large platforms and Riggs. Some of the work scope consists of positioning two fifty five tonne cylinders at the end of each support beam and then position four large manifolds underneath each cylinder. Positioning large hydraulic pipes which are placed in and around the cylinders and all the way along the beam.
-
-
-
Engenda Group
-
United Kingdom
-
Industrial Machinery Manufacturing
-
200 - 300 Employee
-
Rigger
-
May 2016 - Jun 2016
-
-
-
Unit birwelco engineering worldwide
-
Essar stanlow oil and gas refinery
-
Rigger
-
Feb 2016 - Feb 2016
-
-
-
-
Rigger
-
Jul 2015 - Jul 2015
-
-
-
ALE
-
United Kingdom
-
Mechanical Or Industrial Engineering
-
300 - 400 Employee
-
Rigger
-
Apr 2014 - Jun 2014
Self- employment Rigger Borwin Beta…Platform…subcontract to….ALE Heavy Lifting Removal of high pressured hydraulic jacks. Removal of heavy duty strands from sea bed. Removal of 8te strand jacks. Rigging up lifting frames. Slinging power packs units into position and movement of parts from ships to platform. Self- employment Rigger Borwin Beta…Platform…subcontract to….ALE Heavy Lifting Removal of high pressured hydraulic jacks. Removal of heavy duty strands from sea bed. Removal of 8te strand jacks. Rigging up lifting frames. Slinging power packs units into position and movement of parts from ships to platform.
-
-