Oleg Saidov

at Howard S. Wright, a Balfour Beatty company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Portland, Oregon, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Construction
    • 200 - 300 Employee
      • Feb 2018 - Present

      * The Portland Building Reconstruction Project $140M Collaborative design-build delivery. The scope of renovations included complete envelop replacement, seismic upgrades, MEP systems replacement, and a full interior remodel. https://balfourbeattyus.com/our-work/project-portfolio/the-portland-building-reconstruction* $35M Ground up 5-Story Office Building in Camas, WA. https://www.columbian.com/news/2020/oct/14/fisher-investments-announces-completion-of-five-story-office-building/* $140M Design-built 15-Story Luxury Hotel Tower with high end Pool/ SPA Building, Ste Utilities, Site improvements.Auger Cast Piles, PT Superstructure, Curtain Wall System, Stainless Steel Suspended Pool and SPA Systems,.. Show less

      • Feb 2006 - Present

      Project Engineer for the following projects: * Clackamas Town Center - $ 65M Retail, Site Work, Parking Garage, TI. * Portland State University Shattuck Hall Renovation - $15M Seismic and Systems Upgrade to 100 year old historical building. * Portland State University Lincoln Hall - $25M Seismic and Systems Upgrade to 100 year old historical building. * East County Courts with Data Center (Gresham, OR) - $15M Courthouse with offices and County Data Center. Maneged BIM model for this project. * Edith Green Wendell Wyatt Federal Building Modernization - $140M State of the Art, LEED Platinum Building. Regular PE duties, LEED Documentation, Digital Docs Control. * Pacific Northwest College of Arts - $30M MEP and Structural upgrade to historical building in downtown Portland, Oregon. Budget/ Cost Management, Document Control, Subcontractors Coordination, CxA and MEP coordination, Digital Docs, LEED Platinum documentation, etc.* Lloyd 700 - Bike Hub - $1.6M Conversion of the Tower Building Basement into State of the Art Bicycle Hub facility with storage space for 550 bikes, Valet Parking, Washing and Repair Stations, Fancy Locker Rooms, and more. Role: All PE + APM/ PM work.* NW 11th and Hoyt (The Dianne Apartments) - $32M Ground up 14-story Concrete Tower with PT Decks located in the Pearl District (Downtown Portland). 102 higher end apartments and studios, mechanical car stacker parking system. Auger Cast Piles and mat foundation. Precast Concrete and Brick veneer skin with high end vinyl windows and aluminum storefront system. Roof terraces and amenity spaces. Role: All PE + APM/ PM work. Show less

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Engineer
      • Jul 2005 - Feb 2006

      PE for $11M mixed-use project in NE Portland. Project includes 67,000 sf. 3-story steel framed building with a 24-Hour Fitness tenant improvement and 4-story precast concrete parking garage. Responsibilities included submittals review, procurement, RFI processes, meeting minutes preparation. Working with subcontractors and project team to resolve field issues. PE for $11M mixed-use project in NE Portland. Project includes 67,000 sf. 3-story steel framed building with a 24-Hour Fitness tenant improvement and 4-story precast concrete parking garage. Responsibilities included submittals review, procurement, RFI processes, meeting minutes preparation. Working with subcontractors and project team to resolve field issues.

    • Construction
    • 1 - 100 Employee
    • Project Engineer
      • Mar 2004 - Jul 2005

      PE for following projects: • Sutter Roseville Medical Center Parking Structure: $10 million project. Three level garage/ 540 stalls. Precast concrete w/ PT decks featuring new helipad on the forth story. • Placer County Land Development Building: $20 million two-story office building approx. 97,400 sf. Steel framed structure w/masonry and curtain wall skin, metal roof and storefront glazing system. • Cache Creek Casino Resort: $250 million project includes 265,000 sf. Casino building with restaurants, multipurpose room, entertainment lounge and admin. spaces, 4-star 200-key luxury hotel, 2,000-car parking garage, health SPA building w/conference rooms, outdoor pool, landscaping and site work. Responsibilities included: • Assisting Sr. Project Engineers/Managers in subcontractors buyout, reviewing and transmitting submittals, processing RFI’s, compiling O.S. Memos and ASI’s • Creating, updating, and maintaining CAD drawings • Updating/Maintaining sets of drawings and specifications • Maintaining/Updating project filing system • Assisting Superintendents providing engineering support, CPM scheduling • Participating in job close-out procedures and in preparation of Purchase Orders and Change Orders • Document/ Walk through punch list work Show less

Education

  • Cosumnes River College
    Construction Management, Building Inspection Technology
    2002 - 2004
  • Lipetsk State Technical University (LSTU)
    Master of Science (MS), Civil Engineering and and Commercial Construction Design & Management
    1992 - 1997

Community

You need to have a working account to view this content. Click here to join now