Ofer Peng

NPI Engineer at Selcom
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Suzhou, Jiangsu, China, CN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Italy
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • NPI Engineer
      • Dec 2011 - Present

      1.RFQ for new project: evaluation for process, equipment, labor, and manufacturability. 2.According to customer request formulate interior master plan. 3. According the master plan prepare tooling or fixture and all SOP(SMT, PTH, Coating, ASSY) for new product. 4. Tracking the NPI state and find root cause for NPI issue. We need solve all the issue before next build. 5. Submit NPI report to customer and propose reasonable solution for customer design issue. 6. Transfer customer files to related department and simultaneously, find tracking system for historical events. 7. Mark the status of new product, and convert to mass production phase. 8. According customer ECN implement and tracking into interior. Show less

    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • NPI Engineer
      • Nov 2008 - Dec 2011

      1. Set up NPI process internally and externally with customer.. 2. ECN & ECO Control. (According customer request definition inner ECO) 3. Customer documentation study and draft manufacture process with customer approval. 4. Engineering preparation for new product.(label & package & floor part) 5. Create standard BOM into inner system maintenance, such as: BOM setup, ECO change. 6. Engineering preparation for new product Structure PTS and SFDC scan system for new production. 7. Evaluate incoming fixture from the supplier (Wave Pallet, Forming fixture, ASSY fixture.) 8. Generate FMEA before the production of new product and maintain until EOL. 9. Generate DFM/DFX report for customer reference. 10. SMT Setting Reflow & W/S profile parameter 11. SMT and DIP Involved in quality issues. Reduce NG rate of production line. 12. Be up on SMT machine, reflow and DIP working principle. 13. Define the Process flow chart of NPI project. 14. Optimize and balance production line. Show less

    • United States
    • IT Services and IT Consulting
    • SMT Enginner
      • Mar 2006 - Nov 2008

Education

  • Nan Fei Gong Xue Yuan
    College, Mechanical Design/Manufacturing/Automation
    2002 - 2005
  • Nan Fei Gong Xue Yuan

Community

You need to have a working account to view this content. Click here to join now