Nurul Syakinah Abd Rahim

Site Engineer at Shanghai Tunnel Engineering Co., Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Singapore, SG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • China
    • Civil Engineering
    • 300 - 400 Employee
    • Site Engineer
      • Aug 2021 - Present

      Jurong Regional Line Jurong Regional Line

    • Singapore
    • Construction
    • 1 - 100 Employee
    • Project Engineer
      • Apr 2019 - Jul 2021

    • United Kingdom
    • Construction
    • 700 & Above Employee
      • Oct 2018 - Dec 2018

      • Review of tender document, scope of work, drawing, BOQ specification, client’s requirement in preparation for cost estimation.• Follow up with the client to seek clarification for additional/changes of inquiries.• Prepare written estimates for clients based on labor, materials, equipment and machineries.• Preparing Final Bid Price Estimation based on pre determine pricing document.

      • Jan 2018 - Dec 2018

      MARCH’18- OCTOBER ‘18Client: Micron Semiconductor Asia Pte LtdProject: MICRON FAB 10A Building (WOODLAND)• Planning and supervise daily production on actual activities to achieve optimum performance rate within contract period. • Prepare method statement of construction for consultant approval.• Coordinate and supervise the civil works process.• Managing project with average budgets of SGD 21 million.• Support and verify of effectiveness and adequacy of the project quality system.• Completing the project on time and within 10% cost saving as per Management target • Communication coordinator between Client and project teams for job planning and instruction delivery. Show less

      • Jan 2018 - Mar 2018

      KELLER (M) SDN BHD, TRX MALAYSIA (MRT)JAN’18- MARCH’18Client: TRX City Sdn BhdProject: Tun Razak Exchange Seksyen 62 and Seksyen 67 • Calculate theoretical and actual quantities of materials based on production rate of bored piling activities. • Supervise site teams work to reach optimum production with good workmanship.• Prepare method statement of construction for consultant approval.

    • Malaysia
    • Civil Engineering
    • 1 - 100 Employee
    • Site Engineer
      • Jul 2015 - Jan 2018

      AUGUST’17- JANUARY’18 Client: Lebuhraya Pan Borneo Sdn Bhd Project: Construction of Nyabau Flyover (Bintulu) • Planning and supervising daily production on actual activities to achieve optimum performance rate within contract period. • Determine existing pipeline/cable beneath the ground surface before carrying out drilling activities. • Monitoring workmanship quality on site to control material wastage. • Communicate with site supervisor about delay and any issues that must be communicated to clients. • Report to Project Coordinator the progress of works on daily basis. • Preparing monthly progress report and monthly claims for Main Contractor. July’15- JULY’17 Client: Boulevard Sdn Bhd Project: Proposed Erection of 19th Storey Building (Kuching) • Checking construction drawing and applicable standard prior to execution of any construction work. • Verification of works done (e.g. measuring quantity), inspection and liaise with the Main Contractor. • Directed and monitored progress during project execution to ensure project deliverables Preparing monthly progress report and monthly claims for Main Contractor. Show less

Education

  • Universiti Teknologi MARA
    Bachelor's degree, Civil Engineering
    2010 - 2015

Community

You need to have a working account to view this content. Click here to join now