NOR ERMA AFZAN MUHAMAD SALEH

Engineer at MW Advantech Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Shah Alam, Selangor, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Malaysia
    • Automotive
    • 1 - 100 Employee
    • Engineer
      • Sep 2022 - Present

      • Responsible in technical part of EV charging include functionality and workability of each charger. • Support software engineer in troubleshooting the charger to detect the error using Tera term. • List out the BOM of EV charger for manufacturing and for sourcing a local supplier then negotiate the cost. • Responsible for manufacturing, production efficiency, internal & external quality efficiency strategy & implementation. • Corporate with R&D team in developing new process & process sequence for new product. • Do a costing of EV charger to finalize the price of EV charger. • Prepare the documentation of production line (PQCT, Process Sequence, Flow Chat, Takt time & etc.) • Documented related Files for ISO application (ISO 9001) , SIRIM and MOF. • To conduct trial runs & integrating new manufacturing process based on actual results. • In charge in calculation costing for EV charger and installation of charger. • To study and came out with standard quality verification for incoming, in production line and outgoing process. • To lead total capacity study for EV Charger production line. Show less

  • ICS AUTOTECH SDN BHD
    • Shah Alam, Selangor, Malaysia
    • Electrical Design Engineer
      • Jan 2017 - Sep 2022

      • Write a standard operation procedure & design throughout documentation work & schematic diagram of the projects & generate report of overall projects for both mechanical & electrical part. • Prepare a documentation for JKKP & obtain the approval. • Design an Electrical system by using AutoCAD and write the PLC program for machine, scissor lifting & conveyor. • Prepare schedule or work program & ensuring that project adheres to time & budget expectation. • Able to display strong communication leadership & problem-solving skill throughout project tenure & completion. • Sourcing and negotiate with supplier for electrical part list. Show less

    • Sales Engineer
      • Aug 2016 - Dec 2016

      • Register and add the MOF license (kod bidang) for company to obtain a tender from government. • Evaluate a tender based on qualification of company’s MOF. • Responsible for preparation & checking of tender documents to make sure meet all tender requirement & tender submission. • Prepare proposals in response to requests for quotation in a timely, complete & accurate manner. • Searching a supplier based on tender’s BQ requirement and negotiate the price, time & delivery. • Prepare the quotation based on tender’s BQ requirement. • Liaise with main contractor, consultant & client to identify their requirements on every project. • Preparing and developing technical presentations to explain company's products or services to customers. • Prepare SIRIM documentation for instrument manufactured by company until obtain the approval. Show less

    • Malaysia
    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • Trainee
      • Jul 2015 - Sep 2015

      • Assist drafter how to draw a RTU system using AutoCAD & after drawing approval, submit to sub-contractors for installation. • Assist technician in doing a factory acceptance test (FAT) of RTU after assembling to verify that the components or facilities are made according to the relevant standards and specifications. • Prepared FAT and SAT documentation based on supervisor’s instruction. • Conduct Site Acceptance Test together with technician of RTU to verify that a system meets the requirements of the customer. Show less

Education

  • Universiti Teknologi MARA
    Bachelor of Engineering (B.Eng.), Bachelor of Engineering (hons) Electronic Engineer (Instrumentation)
    2012 - 2016

Community

You need to have a working account to view this content. Click here to join now