Noor Nazri Talib

Stimulation Specialist at DNO Iraq AS
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Iraq
    • Oil and Gas
    • 100 - 200 Employee
    • Stimulation Specialist
      • Sep 2022 - Present

    • United Arab Emirates
    • Oil and Gas
    • 700 & Above Employee
    • Petroleum Engineering Specialist (Production Stimulation - Completion)
      • Oct 2017 - Aug 2022

      o Technical Authority – Subject Matter Expert for stimulation, completion, well intervention and water shut-off:  Focal point for all the technical related subjects between service companies and ADNOC Onshore. o Established/strategy/technical evaluator and administrator for stimulation related contract - Rig less stimulation contract, hydraulic fracturing contract & Fishbone completion stimulation contract. o Bab Gas (thin reservoir) hydraulic fracturing project - Data acquisition & Main Fracturing execution o ADNOC Unconventional project pioneer - well design, fracturing design, fracturing contract. o Champion/responsible for ADNOC Onshore standard operating procedure/manual for stimulation. o Champion/responsible for ADNOC Onshore water shut-off standard operating procedures. o Long horizontal well completion - MRC well, limited entry liner (design & stimulation) o Responsible for new technology (stimulation, completion, well intervention) selection, trial, implementation and evaluation.  Fishbone stimulation completion-technology introduction, candidate selection, design & planning o ADNOC Onshore tight reservoir task force leader (stimulation/completion) o Conducted ADNOC Onshore stimulation courses. Show less

    • Petroleum Engineering Specialist (Production-Completion Specialist)
      • Sep 2015 - Aug 2022

      • Petroleum Engineering Specialist (Technical Authority – Subject Matter Expert) for stimulation, production enhancement, completion and well intervention: o Petroleum Engineering subject matter expert for all ADCO operations/assets (gas & oil). o Completion design for Bab gas (sour/deep) exploration wells: completion design, stimulation, intervention and well testing. o Leading the stimulation task force: reviewing previous ADCO stimulation treatments, technology trials and future recommendations. o Developed ADCO standard operating procedure/manual for stimulation. o Technical reviewer for stimulation, completion and well intervention tenders. o Responsible for new technology (stimulation, completion, well intervention) selection, trial, implementation and evaluation. o Setting company/ADCO strategy for long horizontal well completion. o Water shut off – candidate selection, technology selection, execution & evaluation. o Technical evaluation for stimulation & well intervention contract. Show less

    • India
    • Oil and Gas
    • 700 & Above Employee
    • Field Delivery Manager, Gas Business Unit
      • Sep 2014 - Jul 2015

      •Gas Business Unit Field Development Manager (Petroleum Engineering – Completion, Well Services/Intervention & Hydraulic Fracturing).oResponsible for the delivery of completion, well services/intervention and hydraulic fracturing / stimulation segment - development of deep gas field in Rajasthan, India.oPetroleum engineering department focal point with joint venture partner (Govt. of India) for business plan, budget approval and day to day project progress.oMentoring and coaching 9 engineers (direct reports): well services engineers, completion engineers and stimulation engineers. Show less

    • Advisor - Hydraulic Fracturing
      • Jun 2014 - Sep 2014

      oIn charge of technical aspect and design of the hydraulic fracturing treatment for Cairn India Limited.

    • Denmark
    • Oil and Gas
    • 700 & Above Employee
    • Team leader Stimulation / Well Technologist
      • Jan 2012 - Jun 2014

      •Team leader Stimulation / Well Technologist, in charge of ultra-long horizontal well production optimization, stimulation and non-cemented liner design for Maersk Oil operation in Qatar (offshore).oDesign acid treatment/recipe for the pre-drilled open hole liner completion.oDesign the open hole pre-drilled liner configuration. CAJ hole distribution Torque & Drag (T&D) – liner running programme.oLiner equipment and accessories focal point.oWater shut off (conformance treatment).oContract holder for stimulation vessel, liner hanger, inflow control device and tubing convey perforation. Show less

    • Senior Well Stimulation Engineer / Petroleum Engineer
      • Jul 2007 - Dec 2011

      •Senior Stimulation and production engineer, in charge of proppant fracturing and acid stimulation for the Maersk Oil and Gas operation in Denmark. -Involve in the early part of the well completion strategy and planning/prognosis with the multi-disciplinary teams – reservoir engineer, geologist and drilling engineer.-Horizontal well proppant fracturing with an average of 1 -illion pounds of sand per zone. Average of 10 zones per well.-Designing the acid stimulation – CAJ (Controlled Acid Jetting) Liner & PSI (Perforate Isolate & Stimulate) completion for long horizontal acid stimulation. Average of 10000 ft horizontal section.-Design and execution of platform based coiled tubing conveyed acid restimulation on multi-zone (8-10 zones) horizontal well.•Supervising the stimulation treatment and acted as company representative on board of stimulation vessel “Skandi Fjord”.•Coordinating and planning stimulation treatment with the services company.•Involve in the stimulation tendering processes. •Selection of the restimulation candidates - design and execution of the restimulation. •Multi-zones (10-14 zones) coiled tubing matrix stimulation – design, planning and execution.•Rock mechanics evaluation and correlation for the Maersk Oil and Gas, North Sea operation.•Feasibility study and technical evaluation of cutting reinjection project for the Maersk Oil and Gas in North Sea.•Design and execution of the microfrac on the exploration wells for the Maersk Oil & Gas North Sea operation. Also involved in the microfrac through the wireline downhole tool (RCI).•Involve in the selection of the new stimulation techniques for Maersk Oil & Gas.•Introduce the new proppant fracturing technique for the Maersk Oil & Gas Denmark. Show less

    • United States
    • Technology, Information and Internet
    • 700 & Above Employee
    • Field Service Manager - Fracturing & Stimulation
      • Oct 2005 - May 2007

      Schlumberger Well Services, Udhailiyah, Saudi Arabia.•Field Service Manager, managing USD 25 millions per year business for fracturing, stimulation and pumping services for Saudi Arabia, Pakistan and Kuwait. Crew size of 46 peoples and asset of USD 10 millions.•Developed and secured Power Water Injector Stimulation business for Saudi Arabia Market – USD 5 millions / year.•Introduced horizontal fracturing technology (StageFRAC) in Saudi Arabia – Qatif 342.•Increased Schlumberger market share in filtration and pumping services on the rig.•Reviewing and approving technical proposals and job designs for fracturing and stimulation activities. Show less

    • Fracturing & Stimulation Engineer
      • Sep 2004 - Oct 2005

      Schlumberger Well Services, Oman.•Technical engineer and field engineer for proppant fracturing in Saih Rawl, Oman. Responsible for designing, execution and evaluation of proppant fracturing operation. Completed 120 proppant fracturing jobs in 1 year.•Responsible for calibration test (DataFRAC) on site.•Improved the service quality and operational efficiency of the fracturing business – average of 1 proppant fracturing job per day.•Completed the largest proppant-fracturing job in Middle East and Asia.•Saih-Rawl field proppant fracturing study, involve Schlumberger software called DECIDE (6 dimensions self organizing map & neural network). Involved 180 evaluations of pre and post fracturing production data and proppant fracturing modeling. Show less

    • Fracturing & Stimulation Engineer
      • Sep 2004 - Oct 2004

      Schlumberger Well Services, Brunei.•Technical engineer for matrix acidizing project for Brunei Shell Berhad. The first stimulation campaign ever awarded to Schlumberger Brunei and executed from Schlumberger Drilling Services Multipurpose Service Vessel - BIMA. •Responsible for the start-up of the campaign – logistic, candidate selection, technical design and execution.

    • Fracturing & Stimulation Engineer
      • Aug 2004 - Sep 2004

      Schlumberger Well Services Miri, Malaysia.•Technical engineer for matrix acidizing project with Schlumberger Integrated Project Management (IPM) for Bokor field. Design matrix stimulation job with nitrified visco-elastic surfactant as diverter (OilSEEKER – a Schlumberger product).

    • Fracturing & Stimulation Engineer
      • Apr 2002 - Jul 2004

      Schlumberger Well Services Kemaman, Malaysia.•Engineer In-Charge for coiled tubing operation, Kemaman, Malaysia. Start-up of the first Coiled Tubing contract ever awarded to Schlumberger Well Services Malaysia for Petronas Carigali and Exxon Mobil.•Managing coiled tubing cell consists of 4 coiled tubing units and 52 employees.•Improving the Schlumberger Well Services, Kemaman warehouse and inventory system.April 2002 to Feb 2004 – Schlumberger Well Services Kemaman, Malaysia.•Stimulation and fracturing technical engineer/field engineer for Schlumberger Well Services Brunei, Malaysia and Philippines. •Technical Engineer/field engineer for Angsi Field oIn charge for the candidate selection, technical design and field execution for Angsi field (joint venture between Petronas Carigali and Exxon-Mobil) hydraulic fracturing campaign. oThe world largest proppant fracturing campaign from the fixed platform. Total of 20 wells (79 proppant fracturing stages) with 14 millions lbs of proppant pumped in 1.5 years. oSuccessful implementation of the new low gel loading fracturing fluid – (PrimeFRAC-a Schlumberger product) for high temperature well. oInitiate the new fracturing market for L-sand fracturing (technical design, fracturing fluid formulation and execution).•Technical Engineer/field engineer for Resak field hydraulic fracturing oFirst fracturing job from drilling barge (T-3) oCandidate selection, technical design, logistic and operational.•Technical engineer for Schlumberger Well Services Kemaman, Malaysia. Introduced visco-elastic surfactant diverter (OilSEEKER-Schlumberger product) technology for Dulang field (PETRONAS Carigali, Malaysia) and creating market share of USD1.0 Million. Show less

    • Fracturing & Stimulation Engineer
      • Jun 2001 - Apr 2002

      June 2002 to May 2002 – Schlumberger Well Services Duri, Indonesia.•Field Engineer (cementing, proppant fracturing, sand Control & matrix acidizing).

    • Malaysia
    • Consumer Services
    • 100 - 200 Employee
    • Petroleum Engineer
      • Jun 1999 - Dec 2001

      December 1999 to June 2001– PETRONAS Research & Scientific Services (PRSS). •Reservoir Engineer oEnhance Oil Recovery study for all PETRONAS Fields in Malaysia – a joint study with PRI, Alberta, Canada. oReservoir Simulation for EOR/IOR candidates using ECLIPSE 300 December 1999 to June 2001– PETRONAS Research & Scientific Services (PRSS). •Reservoir Engineer oEnhance Oil Recovery study for all PETRONAS Fields in Malaysia – a joint study with PRI, Alberta, Canada. oReservoir Simulation for EOR/IOR candidates using ECLIPSE 300

Education

  • Colorado School of Mines
    BSc., Petroleum Engineering
    1996 - 1999

Community

You need to have a working account to view this content. Click here to join now