Noel Segui
Founder at Solar Mason- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
-
Spanish Native or bilingual proficiency
Topline Score
Bio
Credentials
-
Enphase Solar PV Installation
Enphase EnergyJun, 2022- Nov, 2024 -
Advanced Solar Cells & Panels
HANWHA Q CELLS USA INCMay, 2022- Nov, 2024 -
IronRidge Installation
IronRidgeMay, 2022- Nov, 2024 -
Operating Engineer
Pennsylvania Department of Transportation (PennDOT)Apr, 2016- Nov, 2024 -
24 HR HAZWOPER
ExelisFeb, 2013- Nov, 2024 -
40-Hour Training O.S.H.A.
SCE Environmental GroupJan, 2009- Nov, 2024 -
CPR/AED
SOS Security LLCAug, 2011- Nov, 2024
Experience
-
Solar Mason
-
United States
-
Solar Electric Power Generation
-
1 - 100 Employee
-
Founder
-
Mar 2018 - Present
-Developed a marketing and sales strategy focused on educating clients not selling them -Established a website and set up company emails accounts -Managed our Search Engine Optimization setting to drive organic traffic to our website -Developed a proprietary no cost growth strategy to drive traffic and keep phones ringing -Utilized specialized programs to create media content for social media distribution -Established and maintained our Social Media accounts and presence through automations -Developed a smart home integrations campaign using readily available Amazon products -Created an Alliance Partnership with Garvin Metal Roofs for mutual growth -Wrote various types of contracts based on the American Institute of Architect -Secured lifetime software deals for digital signatures, management tools, and more -Secured a Sunpower Dealer & Installation Contract with-in 6 months of establishment -Built a Quoting platform using excel and industry specific knowledge to budget -Utilized the same tool to create 30yr financial projections (ROI) for the clients -Further developed the tool to automatically generate purchase orders for suppliers -Utilized a bid platform to get suppliers to compete -Performed site visits and surveys to determine infrastructure upgrade requirements -Created the engineering drawings to submit for 3rd party approval and permitting -Recorded drone footage and pictures of before and after for project documentation -Oversaw end to end processes from client acquisition to permission to operate -Vetted the equipment prior to utilization and communicate with their lead engineers -Coordinated schedules, suppliers, delivery of materials and client portal updates -Managed manpower on the ground and delegated work prioritization -Ensured all conductors were terminated properly and equipment was installed correctly -Responsible for change orders, utility, AHJ, communications -Maintained record of work performed according to NEC Specifications Show less
-
-
-
Sustainable Energy Management Systems LLC.
-
United States
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
Co-Founder
-
Oct 2014 - Present
SEMS is Manufacturing Photovoltaic Tracking Systems for the purpose of increasing energy output by 40%-50% on average. A current scalable Manufacturing Capacity of 22MW per year per shift. Providing Trackers for both the Northern Hemisphere as well as the Equatorial Region with Advanced Tracking Ranges. With help from Ben Franklin Technology Partners, we secured over 100k in funding in order to make these racking systems a reality SEMS is Manufacturing Photovoltaic Tracking Systems for the purpose of increasing energy output by 40%-50% on average. A current scalable Manufacturing Capacity of 22MW per year per shift. Providing Trackers for both the Northern Hemisphere as well as the Equatorial Region with Advanced Tracking Ranges. With help from Ben Franklin Technology Partners, we secured over 100k in funding in order to make these racking systems a reality
-
-
-
Caliber Solutions
-
United States
-
Construction
-
1 - 100 Employee
-
Operating Engineer
-
2019 - 2020
-Inspected all the equipment and serviced them to prevent equipment failure -Established the secondary fabrication area, temporary power and organized the conexes -Inspected all generators for proper grounding, GFCI usage, wheel chocks & contaminants -Evaluated jobsite for potential hazards in order to mitigate the risk of injury -Responsible for the identifying excavation, widths, depths and lengths for duct banks -Bent, cut, threaded, painted and lubricating conduit prior to installation -Calculated the appropriate amount of concrete required with take-offs for obstructions -Used a protractor, stringline & level to ensure an aesthetically pleasing installation -Assured underground utilities were properly installed, backfilled, taped & compacted -Preformed line locates when a wire pull was unsuccessful to clear obstructions -Installed temporary and permanent structural supports for conduit and switches -Pulled and inspected wire for nicks, cuts, scraps and overage integrity before and after -Executed morning JSA meetings on a daily basis to ensure tasks were completed safely -Identified ways to increase productivity while reducing waste in time and materials -Organized entire laydown area to maintain order and ease of access to materials -Maintained daily logs & photo documentation of work progress for QA/QC & as-builts Show less
-
-
-
Jones Contractors, Inc.
-
United States
-
Construction
-
1 - 100 Employee
-
Operating Engineer
-
2019 - 2019
-Excavated 69 miles of earth to accommodate a 12.75 in steel pipeline -Operated excavators, trenchers, back hoes, dozers, loaders and side booms -Installed waterbars and ECDs in support of E&S control measures -Evaluated jobsite for potential hazards in order to mitigate the risk of injury -Responsible for the identifying excavation, widths, depths and lengths -Assured underground utilities were properly installed, backfilled, taped & compacted. -Installed and removed matt bridges through highly sensitive wetland areas -Participated in tie ins,hto taps, hydro testing, pigging, coating clearing, grading & seeding -Communicated with engineers, project managers & inspectors on QA/QC -Performed stream crossing operations, diversions and bridge work -Communicated with land owners and preserved vital relationships Show less
-
-
-
H&K Group, Inc.
-
United States
-
Construction
-
200 - 300 Employee
-
Operating Engineer
-
2018 - 2018
-Used GPS to determine and shoot grade for both the road and utility construction -Operated excavators, back hoes, dozers, loaders, skid steer, truck trailer combos -Installed water mains, sewer mains and drainage alongside live utilities using trimble gps -Removed concrete and street lights to make way for new construction of sidewalks -Poured sand, installed steel reinforcement, made forms for concrete pour -Performed load testing and soil testing prior to application of pavement -Installed concrete dividers for traffic control measures in dense environments -Removed fencing and other structures for the purpose of proper site grading -Installed fencing and other structures after removed -Installed utilities for Saint Luke's Children's Hospital in Bethlehem Pennsylvania Show less
-
-
-
Linde Corporation
-
United States
-
Construction
-
1 - 100 Employee
-
Operating Engineer
-
2017 - 2017
-Built an energy transfer station work alongside directional drilling teams -Operated excavators, trenchers, back hoes, dozers, loaders and side booms -Installed waterbars and other ECDs in support of E&S control measures -Evaluated jobsite for potential hazards in order to mitigate the risk of injury -Responsible for the identifying excavation, widths, depths and lengths -Assured underground utilities were properly installed, backfilled, taped & compacted. -Installed and removed matt bridges through highly sensitive wetland areas -Participated in tie ins,hto taps, hydro testing, pigging, coating clearing, grading & seeding -Communicated with engineers, project managers & inspectors on QA/QC -Performed stream crossing operations, diversions and bridge work -Communicated with land owners and preserved vital relationships Show less
-
-
-
Kriger Construction Inc
-
United States
-
Construction
-
1 - 100 Employee
-
Operating Engineer
-
2016 - 2016
-Used GPS to determine and shoot grade for both the road and utility installation -Operated excavators, back hoes, dozers, loaders, skid steer, truck trailer combos -Installed water mains, sewer mains and drainage alongside live utilities -Installed roundabouts and bridges in Nanticoke RT 11 in Pennsylvania -Poured sand, installed steel reinforcement, made forms for concrete pour -Performed load testing and soil testing prior to application of pavement -Installed concrete dividers for traffic control measures in dense environments -Removed fencing and other structures for the purpose of proper site grading -Installed fencing and other structures after removed -Received the DOT 1000hr Operating Engineer Certification -Built the initial website for the Kriger Pipeline Division www.krigerpipeline.com Show less
-
-
-
Army National Guard
-
United States
-
Armed Forces
-
700 & Above Employee
-
Infantry Team Leader
-
2008 - 2016
-Mobilized to evacuate, aid and rescue victims of floods and other natural disasters in the state of Pennsylvania -Deployed 2012-2013 in support of Operation Enduring Freedom - Kuwait -Infantry Fire Team Leader responsible for 5 soldiers within a combat zone -Specialized in the Operation of a 25mm cannon with a TOW missile attachment and many other weapon systems and explosives. -Honorably Discharged June 14th 2016 -Mobilized to evacuate, aid and rescue victims of floods and other natural disasters in the state of Pennsylvania -Deployed 2012-2013 in support of Operation Enduring Freedom - Kuwait -Infantry Fire Team Leader responsible for 5 soldiers within a combat zone -Specialized in the Operation of a 25mm cannon with a TOW missile attachment and many other weapon systems and explosives. -Honorably Discharged June 14th 2016
-
-
-
Osmose
-
United States
-
Utilities
-
700 & Above Employee
-
Foreman | Inspector
-
2015 - 2015
-Responsible for hiring, training and supervising a field crew of 4-10 people -Performed visual inspections as well as internal structural inspections -Identified integrity of existing structures and determined necessary preventative measures -Accustomed to extensive, mathematical calculations on a daily basis. -Directly competent personnel to implement preventive measures -Recommended in some cases that power lines be decommissioned do to corrosion -Recommended in some cases that reinforcement was required going forward -Recommended in some case that additional anchors were required going forward -All actions taken were based on following the strict guidelines and SOPs established -Ensure company quality workmanship standards are met -Collect field data and maintain daily and weekly reports using -Record GPS data on all structures in the field for an up to date utility map Show less
-
-
-
Precision Pipeline Solutions
-
United States
-
Utilities
-
100 - 200 Employee
-
Operating Engineer | Foreman
-
2014 - 2014
-Inspected mainline gas valves and performed preventative maintenance & repairs as needed -Ran hydro excavations & operations for 811 calls & emergency utility locating and repairs -Operated Excavation Equipment around live utilities using safe digging practices -Used specialized computer programs for locating lines and updating new information -Installed new services for both mainlines and services across multiple counties -Performed road cuts as needed with proper patch work upon completion on state highways -Ran directional hydraulic torpedoes for underground installation of gas lines -Pressure tested gas lines to 100 psi prior to commissioning the new line -Deciphered, designed and drew up maps to scale for engineering purposes & as-builts -Received Natural Gas Association OQ Certification testing 100% on all 3 exams Show less
-
-
-
Wyatt Pipeline Contruction
-
Ponca City, Oklahoma
-
Operating Engineer
-
2012 - 2012
-Performed PMCS on all equipment used in our scope -Worked alongside LANEY directional drilling companies -Diverted water flow of streams utilizing dams and flume pipes -Operated equipment in wetland areas by use of mats for E&S control -Installed curlex across miles of terrain in the mountains -Established frac-out contaminants along creek beds -Set up pumping station to divert all frac to the pad for Rain for Rent to collect -Installed silt sock and silt fences across miles of terrain -Performed hydroseeding across many miles of terrain Show less
-
-
-
SCE Environmental Group
-
United States
-
Environmental Services
-
1 - 100 Employee
-
Operating Engineer
-
2011 - 2011
-Organized removal and disposal of hazardous waste from clients property safely -Established quarantine zones and decontamination units for field operations -Operated heavy equipment for large scale demolition & remediation projects -Established fracout containment units across pipeline operations in Montrose, PA RT29 -Installeds ECDs to prevent waterway contamination from drilling mud -Mixed mud on the pad with saw dust in order to dispose properly using 320 CAT -Attained the OSHA 40 HAZWOPER Show less
-
-
-
SOS Security LLC
-
United States
-
Security and Investigations
-
700 & Above Employee
-
Field Supervisor
-
2010 - 2010
Implementing security measures taken to ensure the safety of VIPs or other individuals who may be exposed to elevated personal risk because of their employment, celebrity status, wealth, associations or geographical location. Protective measures may include home security systems, bodyguards, armored vehicles and vehicle scramble plans, mail screening, private jet travel, background checks for other employees, and other precautions. Implementing security measures taken to ensure the safety of VIPs or other individuals who may be exposed to elevated personal risk because of their employment, celebrity status, wealth, associations or geographical location. Protective measures may include home security systems, bodyguards, armored vehicles and vehicle scramble plans, mail screening, private jet travel, background checks for other employees, and other precautions.
-
-
-
Simplex Homes
-
United States
-
Construction
-
1 - 100 Employee
-
Home Construction
-
2009 - 2009
-Installed windows, doors, cabinets, appliances, tiles, sinks, bathtubs, showers and lighting -Framing, decking, flooring, hanging drywall, spackling, painting, trimming, roofing, siding -Plumbing, electrical and insulation -Installed windows, doors, cabinets, appliances, tiles, sinks, bathtubs, showers and lighting -Framing, decking, flooring, hanging drywall, spackling, painting, trimming, roofing, siding -Plumbing, electrical and insulation
-
-
Education
-
University of Scranton
ROTC, Military Science and Operational Studies