Mechanical Pre-commissioning Engineer at BECHTEL INTERNATIONAL, INC.
 Supervise and Support the mechanical Pre-Commissioning activities for the Casthouse Area of the... read more
  • shield Verified
Contact Information
Location
Metro Manila, PH

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Noel Cruz

You must have claimed profile
You need to have a working account to view this content. Click here to join now
Doroteo Agno

He has a substantial experience in Commissioning in LNG projects

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Noel Cruz

You must have claimed profile
No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Startup Specialist
    Bechtel Corporation
    Feb, 2015
    - Present
  • Instrumentation and Control Servicing NCII
    TESDA - Technical Education Skills Development Authority
    Jun, 2017
    - Present

Experience

    • Norway
    • Mining
    • 1 - 100 Employee
    • Mechanical Pre-commissioning Engineer
      • 2018 - 2019

       Supervise and Support the mechanical Pre-Commissioning activities for the Casthouse Area of the Smelter. Organizing daily activities with testing contractors, walk down inspections, closeout of punch items, to ensure safe and successful completion of the works. Supervise and support Contractors on the mechanical testing activities at Casthouse Area to ensure successful and final handover of the areas to Client team for Commissioning & Operations Support and supervise all integration and interfacing testing with other areas and services & utilities to ensure full integration of the Casthouse Area into the Plant. Support the full implementation of the Pre-Commissioning Turnover & Handover Plan, follow turnover schedule and ensure handover to Owner is achieved as the plan. Coordinate daily activities with the Casthouse Area testing contractors. Review & approve all test reports submitted by Contractor. Prepare Jon Plan to ensure that the control measures are in place. Ensure the implementation of Lock-Out/Tag-Out & Work Authorization process and STARRT for all activities on site.

    • CSU Shift Supervisor - ISBL
      • 2014 - 2016

      • Plans, develops, coordinates and direct start up activities within a discipline for the assigned project. Provides start up supervision or assistance at the jobsite of certain projects assigned.• Supervises, coordinates, and reviews the work of assigned engineers, estimates staffing needs and schedules, and assign work to meet completion dates,• Coordinates with client representatives to obtain approval on work as it is accomplished.• Ensure that work being performed is within scope of service, quality standard and safety procedures are being followed including adherence to permit to work requirements. • Coordinates with construction and engineering to set construction system completion priorities and to ensure schedule turnover dates are met.• Reviewing and authorizes/ approved Lock Out/ Tag Out (LOTO) and permit to work (PTW) within the CSU boundaries of the assigned areas

    • Italy
    • Engineering Services
    • 700 & Above Employee
    • Commissioning Startup Supervisor
      • 2012 - 2014

      • Assist Commissioning Manager and/or Superintendent. Review schedules and planning. Liaise with main contractors and Client. Supervise assembly of commissioning dossiers. Supervise preparation phase activities of Commissioning discipline engineers.• Ensure quality standards and safety procedures are being followed by commissioning staff, including adherence to permit to work requirements.• Prepare progress documentation. Control commissioning activities, including contingency plans, to ensure conformance with scheduled completions. • Coordinate and control performance of operational tests according to each procedure. • Organize and guide subcontractor personnel in field during execution of pre-commissioning and commissioning activities. • Coordinate with subcontractors for inspections and tests of executed works. • Take active part in pre-commissioning, commissioning and mechanical completion of plant/unit/areas as per Commissioning plan, schedule and programme. Provide feedback to other discipline supervisors, commissioning and construction managers, for any matters affecting or related to contractor’s quality, workmanship or performance.• Advise Management of any threats to schedule for completion of installation activities. Monitor safety and housekeeping.• Ensure that all work is carried out in accordance with the site Permit to Work system and all personnel observe and adhere to all Health and Safety requirements.

    • Commissioning Supervisor
      • 2010 - 2011

      • Ensure the commissioning work meets the Project objectives by conducting all necessary supervision of commissioning development, preparation and execution of work; monitoring Mechanical Completion and Pre-commissioning activities associated with Process and Utility systems scope.• Organize and manage the operations of assigned team by controlling their job and implementation of Plant Safety procedure in case of Emergency. • Assure that all activities piping related such as flushing, blowing, drying and inerting, reinstatement of piping components and local instruments, high pressure leak test (N2/Helium). Also activities relevant to rotating/static equipments such as motor run in, machinery run in and column/vessel internals installations and final box up inspection are duly performed and carried out in accordance with stated procedures and instruction of Commissioning Leader.• Keep records of all activities performed and produce the certificates, duly signed by involved parties and hand over to the certification engineer. • Conformity checks as per PEFS/P & ID and Punch Clearing activities prior to RFSU as per project and client standards and requirements.• Coordinate with electrical, mechanical & Instrument personnel for project execution and with control operator for the daily operation of the plant.• Ensure that all work is carried out in accordance with the site Permit to Work system and all personnel observe and adhere to all Health and Safety requirements.

    • Qatar
    • Oil and Gas
    • 200 - 300 Employee
    • PMC/Commissioning Supervisor
      • 2008 - 2010

      • Ensure the commissioning work meets the Project objectives by conducting all necessary supervision of commissioning development, preparation and execution of work; monitoring Mechanical Completion and Pre-commissioning activities associated with Process and Utility systems scope.• Organize and manage the operations of assigned team by controlling their job and implementation of Plant Safety procedure in case of Emergency. • Assure that all activities piping related such as flushing, blowing, drying and inerting, reinstatement of piping components and local instruments, high pressure leak test (N2/Helium). Also activities relevant to rotating/static equipments such as motor run in, machinery run in and column/vessel internals installations and final box up inspection are duly performed and carried out in accordance with stated procedures and instruction of Commissioning Leader.• Keep records of all activities performed and produce the certificates, duly signed by involved parties and hand over to the certification engineer. • Conformity checks as per PEFS/P & ID and Punch Clearing activities prior to RFSU as per project and client standards and requirements.• Coordinate with electrical, mechanical & Instrument personnel for project execution and with control operator for the daily operation of the plant.• Ensure that all work is carried out in accordance with the site Permit to Work system and all personnel observe and adhere to all Health and Safety requirements.

    • Package Commissioning Engineer
      • 2008 - 2008

      • Prepares the pre-commissioning, commissioning procedures and execution as per package and within the area of responsibility.• Assist Start-up Engineer during the commissioning phase ensuring proper and safe operation of the machineries by evaluating the running parameters.• Monitor the construction process of the facilities, keeping informed on the availability of plant for commissioning as per package.• Overseeing and monitoring contractor company manpower workforces on daily activities.• Organize and Perform pre-commissioning, commissioning activities of process, utility and mechanical systems.• Co-ordinate with electrical, mechanical & Instrument personnel for project execution and with control operator for the daily operation of the plant.• Ensure that all work is carried out in accordance with the site Permit to Work system and all personnel observe and adhere to all Health and Safety requirements

    • Pre-commissioning Supervisor
      • 2007 - 2008

      • Check contractors daily labor allocations per job face / work areas to ensure priority working in accordance with contract schedules• Monitor the construction process of the facilities, keeping informed on the availability of plant for commissioning as per package.• Ensure proper monitoring and control of punch list scope according with the project and client requirements.• Engaged in all field activities for the plant modifications, construction, shutdown, pre commissioning, commissioning and start up activities which includes degassing/steaming out/ purging of existing line prior tie – INS, Water flushing, Air Blowing and leak testing, reinstatement and conformity check as per P & ID and Isometric Drawing. Start up and mechanical run test of rotary equipments like (motors, pumps, blowers, steam turbines, compressors, and fin fan coolers). Loop and functional test of instrumentation and Control valves stroke checking.• Service test of various utility like Instrument & Plant Air system, Nitrogen system, Steam/Condensate, Firewater and cooling water system.• Co-ordinate with electrical, mechanical & Instrument personnel for project execution and with control operator for the daily operation of the plant.• Ensure that all work is carried out in accordance with the site Permit to Work system and all personnel observe and adhere to all Health and Safety requirements.

    • Instrument Technician
      • 2005 - 2006

      • Engaged in all field activities for the plant modifications, shutdown, pre commissioning, commissioning of field Instrumentation, functional test and control valves stroke check in accordance with specified project requirements.• Performed calibration and fix set points of various instruments such as Gauges, Pressure Transmitter, Differential Pressure Transmitter, Level Transmitter and Temperature Transmitter (Manufactured by Rosemount).• Performed termination and loop checking of instrument signals/control cables inside panels, junction boxes and instruments. • Performed installation of impulse or pneumatic tubing and any instrument hook-up jobs.

    • Instrument Technician
      • 2001 - 2004

      • Performed calibration of transmitters, gauges, loop checking, and termination of instrument control cables inside panels / junction boxes and instruments.• Involved in pre – commissioning & commissioning activities, performing inspections and functional testing of instrumentation and control valve stroke check in accordance with project requirements.• Organized and implement procedures to verify correct functionality of the system / design and vendor supply scope to minimize errors and conflicts within the systems.• Performed installation of calibrated field instruments and other electrical/ instrumentation materials based on each actual and drawing conditions.• Involved with mechanical overhaul, repairs, maintenance trouble shooting of prime movers, auxiliary equipments of Power Plant Generating Units.• Operates Mechanical – Instrument equipment used in reconditioning of components parts of equipments / machines. • Conduct start up and mechanical test run of newly installed and reconditioned/ overhauled equipments such as generators, purifiers, pumps, motors and other related equipments in Power Generation Plant.• Read and utilize drawings such as P & ID’s, loop and hook – up drawings, cable routing, instrument location plans and other construction drawings.

    • China
    • Construction
    • 1 - 100 Employee
    • Instrument Fitter
      • 1999 - 2000

      • Perform Installation of all types of calibrated field instruments such as Temperature, Pressure, Level, Flow and Pressure Differential Transmitters, Gauges, Switches, Temperature Elements (Thermocouples), Recorders, analyzers, and various types of actuators e.g. Hydraulic, Pneumatic and motorized control valves.• Perform Installation of instrument signals, air line and impulse line tubing, control boards, instrument reservoirs, junction boxes, cables trays, conduit pipes, supports and all other electrical/instrumentation materials.

    • United States
    • Environmental Services
    • 400 - 500 Employee
    • Quantity Surveyor
      • 1998 - 1998

      • Conduct field inspection for Quality and Quantity Control Measures.• Preparation of monthly progress billing for payment certificate as per actual installation and contract condition.• Perform Quantity/ Material Take off for Pre and Post Tendering.• Preparation of Daily, Weekly, Monthly accomplishment reports, Project Progress Status and Production Report analysis, Foreman’s Productivity and Manpower monitoring • Conduct field inspection for Quality and Quantity Control Measures.• Preparation of monthly progress billing for payment certificate as per actual installation and contract condition.• Perform Quantity/ Material Take off for Pre and Post Tendering.• Preparation of Daily, Weekly, Monthly accomplishment reports, Project Progress Status and Production Report analysis, Foreman’s Productivity and Manpower monitoring

    • United States
    • Environmental Services
    • 400 - 500 Employee
    • Instrument Fitter
      • 1996 - 1996

      • Perform Installation of all types of calibrated field instruments such as Temperature, Pressure, Level, Flow and Pressure Differential Transmitters, Gauges, Switches, Temperature Elements (Thermocouples), Recorders, analyzers, and various types of actuators e.g. Hydraulic, Pneumatic and motorized control valves.• Perform Installation of instrument signals, air and impulse line tubing, control boards, instrument reservoirs, junction boxes, cables trays, conduit pipes, supports and all other electrical/instrumentation materials.