Nneji Okechukwu Victor

Senior Surveyor/ Setting Out Engineer at Parsons International
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Doha, Qatar, QA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Project Management Skills for Leaders
    LinkedIn
    Jan, 2023
    - Oct, 2024

Experience

    • Belgium
    • Civil Engineering
    • 300 - 400 Employee
    • Senior Surveyor/ Setting Out Engineer
      • Nov 2020 - Present

      Supervising for contractors works activities (Open trenches, Shoring pile, Gully and Micro tunneling works up to the reinstatements of asphalt. Attending to Inspection Requests (IR's) submitted by the contractor and take appropriate action in a timely manner •Reporting any works carried out by contractor found not be in accordance with approved drawing and specifications and report to Immediate Superiors for appropriate action. •Monitoring quality of works and assess the safety at site including health and environmental issues, ensuring compliance with contractual standards, QCS and safety and health risk assessments. •Maintaining records for daily activities on site including progress photos and ensure they are readily available for inspection as and when required. •Preparing surveillance report(s) for deficiencies of work found at site and nonconformance reports (NCR) if required in view of the development of events. •Checking and ensuring effective coordination between discipline related works and all other disciplines. •Providing technical input and experiences to resolve any discipline related issues on site that may arise. Show less

    • Senior Surveyor
      • Feb 2019 - Oct 2020

      Project: AL MAZROUA QUARRY & QBC Ground-penetrating radar (GPR) Productively established second order horizontal and vertical control points for setting out, topographic, and cross sectioning purposes. Properly executed topographic survey and cross sectioning intended for design purposes, road widening, and earthwork volume calculations. Coordinated with the site civil engineer and construction manager from time to time to ensure the accuracy of the work is achieved. Liaised with consultants for volume calculation/pre-checking of setout points and elevation of quantities in case of any discrepancies. Successfully executed the preliminary setting-out for excavation completed final setting-out and ensured that the layout is within permissible tolerance during construction stage. Prepared the survey report protocol in correctness of their location coordinates alignment and verticality with reference to the IFC drawings and specifications. Managed the use of GPR to detect subsurface objects, including rock, soil, ice, fresh water, pavements and structures. Utilize the GPR to map the structures from a borehole in underground mining, locating underground utilities and Standard electromagnetic induction utility locating tools require utilities to be conductive. Performed the use of directional borehole radar systems to produce three-dimensional images from measurements in a single borehole. Employed the ground-penetrating radars to study bedrock, soils, groundwater, and some utility in prospecting for gold nuggets and for diamonds in alluvial gravel beds, by finding natural traps in buried stream beds that have the potential for accumulating heavier particles. Nondestructive testing (NDT) of structures and pavements, locating buried structures and utility lines, and studying soils and bedrock. Show less

    • Germany
    • Construction
    • 1 - 100 Employee
    • Senior Surveyor
      • Apr 2017 - Feb 2019

      Project: Qatar-Doha Metro phase 1, Green Line, Red Line and Blue Line Monitoring TBM during the tunnel excavation and carried out networking. Establishment 4m points for laying of slabs and checking precision of the alignment. Setting out points for caring out the infill concrete slabs. Calculated the data for setting-out of main roads, slip roads, loop roads and access roads, at two-meter (2 m) and ten-meter (10 m) change.Brainstormed with engineers, foremen, and operators during sub-base and road base preparation. Determined the elevation to be used in setting-out and erecting precast wall panels, copping beams, and loop road curbs. Managed the laying of wearing course and road markings with the subcontractors. Had set out underground utilities and services. Assisted the site’s civil engineer in casting borehole foundation, footings, columns, girders and slabs. Show less

    • Austria
    • Construction
    • 700 & Above Employee
    • Land Surveyor
      • Feb 2016 - Apr 2017

      PROJECT: Qatar Railways Company Main Office Project, Phase 1: West bay Successfully performed preliminary setting out of structural limit for excavation. Operated the final setting-out of concrete structure for rebar and shuttering works. Successfully marked pipe positions on the ground for excavation purposes. Prepares drawing from AutoCAD according to the specifications or latest drawings being approved. Established elevation for gravel filling, sand bedding, and pipe lying. Regularly checked the horizontal and vertical points to ensure accuracy. Determined methods and procedures for establishing and re-establishing survey control. Kept accurate notes, records and sketches to describe and certify work performed. Coordinated findings with work of engineering and architectural Personnel, clients and others concerned with project. Maintained effective relations with LWS personnel, contractors, and others. Show less

    • Construction
    • 1 - 100 Employee
    • Land Surveyor Coordinator
      • Dec 2015 - Feb 2016

      Establishment of boundary surveys belonging to a particular client to locate the actual place where his or her property is actually located. Mapping of topography of land for engineering design. Establishment of home site elevations for flood insurance. Conducted Land Survey planning for jobs bordering on boundary determination, Title description, topographic modeling. Report all the accomplishment and the progress to Dimensional Control Engineering and Production Team Manager. Perform Dimensional survey upon fit-up and subsequent after welding for primary structures of deck. Assist the client’s inspectors for any queries related to Dimensional matters. Work together with subcontractor for any issue. Carry out and monitor the dimensional inspection, documentation and report preparation using AutoCAD. Responsible for setting up and operating precision equipment for accurate readings for mapping property lines and right-of-ways. Planned and conducted ground surveys designed to establish baselines, elevations, and other. Utilized GPS equipment for locating and mapping wetlands, buildings and other civil structures. Performed detailed field surveys and oversaw the activities of field survey crews in performing the survey. Maintained accurate notes, records and sketches to describe and certify work performed. Researched previous survey evidence, maps, physical evidence and other records. Attended project meetings, providing input, evaluating and managing the required field survey work. Show less

    • India
    • Construction
    • 700 & Above Employee
    • Land Surveyor
      • Oct 2013 - Nov 2015

      Prepare and maintain sketches, maps, reports and certifies the liabilities of work performed. Verifying the accuracy of survey data, both measurements and calculations conducted at the site. Coordinate findings with the engineers, clients and those concerned on the projects to achieve a common goal. Setting out boundaries and columns with offsets and alignments. Given all the levels starting from the excavations to the final height required (Volume of Embankment or Excavations). Prepares extract coordinates from drawing with AutoCAD according to the specifications or latest drawings being approved. Coordinate the boundaries and inner beams check to assume a reliable accuracy. Establishes fixed points for use in making of plans or maps, using the latest instruments. Boundary Survey and setting out of main entrance and perimeter fence for sub-station packages. Setting out of drainage channels and positioning of man-holes, cable line and water line. Setting out alignment and fixing top levels for several kilometers of road within and outside Mesaieed Road. Performed boundary determinations for Estate land properties and land title survey. Conducted filed procedures on the ground to locate and stakeout electric transmission lines, roads, underground drains using Total Station equipment on developing properties Show less

    • Greece
    • Construction
    • 700 & Above Employee
    • Land Surveyor
      • Sep 2012 - Aug 2013

      Setting out of Colum points and determination of differences in elevation according to plan using Total Station TC803 and Leveling Instrument NA30. Topographic and As-built surveying of the site. Detailing the longitudes and latitudes of important features and boundaries in survey areas. Adjusting surveying instrument to maintain their liable accuracy. Develop criteria for survey methods and procedures. Record all measurements and calculations etc. neatly and accurately in field books as the work progress. Review and comment appropriately to short drawings received from the Contractor, when directed by the Engineer. Coordinated procedures for control establishment and setting-out techniques for building construction/ layout jobs. Provided technical support to any other surveyors involved with each project. Collected land survey data using GPS system. Prepared survey drawings and descriptions as directed. Provided survey and mapping services to meet client requirements. Show less

    • United Kingdom
    • Machinery Manufacturing
    • 1 - 100 Employee
    • Assistant Surveyor
      • Feb 2009 - Aug 2012

      Project: Benin-Onitsha Integrated Power Project and IHE-UKWU 43.6km Road Networks. Reporting to the chief Surveyor. Setting out Seismic lines (Receiver and Source line) at regular intervals. Boundary Survey and setting out of main entrance and perimeter fence for lake view phase ll. (Essential Homes Estate Project). Setting out of drainage channels and positioning of man-holes within Lake View phase ll. South point and Golden leaf Estates. Setting out alignment and fixing top levels for several kilometers of road within and outside Lake View phase ll. Performed boundary determinations for Estate land properties and land title survey. Conducted filed procedures on the ground to locate and stakeout electric transmission lines, roads, underground drains using Total Station equipment on developing properties. Preparation and issue of daily reports. Calculated the data for setting-out of main roads, slip roads, loop roads and access roads, at two-meter (2 m) and ten-meter (10 m) change. Successfully marked pipe positions on the ground for excavation purposes. Ensure work activities are performed in accordance with established company standards, policies, procedures and work instructions Show less

Education

  • Enugu State University of Science and Technology
    Bachelor of Science (B.Sc.), Surveying and Goeinformatics
    2004 - 2009

Community

You need to have a working account to view this content. Click here to join now