Nishanth Gabriel

Mechanical Engineer at Waagner-Biro Bridge Systems AG
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
QA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • MMUP/UPDA
    Ministry of Municipality and Environment, Qatar
    Oct, 2018
    - Nov, 2024
  • CIBSE Graduate Engineer
    CIBSE

Experience

    • Austria
    • Construction
    • 1 - 100 Employee
    • Mechanical Engineer
      • Sep 2020 - Present

    • Qatar
    • Civil Engineering
    • 1 - 100 Employee
    • Mechanical Engineer
      • Sep 2018 - Mar 2020

      • Analyzed scope of work for MEP contractor and delivered justification for any change in a work order • Analyze the Survey reports, drawings, specification and design to plan site activities. • Evaluate and allocation of Manpower, Material and Equipment according to the requirements with adherence to approved HSE and quality procedures. • Raise and handle SRM (Site requisition Material), Delivery notes to site store, Head office accordingly. • Took the role acting QA/QC when required and inspected the materials delivered at site with compliance to the project specification. • Continuous follow-up with the sub-contractors for related certificates and documents of the delivered materials for raising MIR (Material Inspection Request). • Organized and prepared Material submittal, Material Inspection, Method Statements and providing Compliance/Solution Including follow up with the supplier for related documents and compliance to the consultant/client comments. • Participated in project progress and mechanical services related to technical meetings as directed by the project manager • Performing Site surveillance, observing and reporting the MEP work progress(Installation, T & C) to the project manager • Organized start-up of all mechanical equipment’s by the supplier/OEM including consultant witnessing. • Liaised with the sub-contractor in Installation, testing and commissioning activities of HVAC, Plumbing and Fire Fighting and provided solutions/suggestions as per the requirements/ RFI. • Familiar with ASHRAE, QCDD AND NFPA Standards. • Created Inspection request (IR) for each phase of the mechanical construction activities including Testing and commissioning of all mechanical equipment’s. • Verified and cleared Invoices for site works submitted by the sub-contractors • Complete management of maintenance team and scheduling of weekly, monthly,quarterly and annual preventive, corrective maintenance of all HVAC and Utilities equipment’s as per OEM recommendations.

  • IPT Design LLC.
    • Doha, Qatar
    • Mechanical Inspector
      • Nov 2017 - Sep 2018

      • Complete Review of documents submitted by the main contractor including site verification for issuance Mechanical Completion Certificate (MCC). • Examined RFC (Ready for Commissioning) and RFSU (Ready for Start-up) Dossiers submitted by the contractor • Witnessed the start-up of all mechanical equipment performed by the Supplier/OEM • Attended and kept a track on the inspection request raised by the main contractor involving the testing and commissioning activities of HVAC Firefighting, and Plumbing with the corresponding Inspection Test plan (ITP) including motorized smoke and fire damper testing and Special systems (ANSUL systems, FM200 Fire Suppression systems) • Organized and issued punch list for each inspection attended • Communicated with the contractors, interpreted design and specifications • Led site observation surveys, preparing field reports on the status of the project, and updated job completion concerning the compliance of project plans, and specifications. • Participated in the meeting conducted by design consultant, site supervision consultant, and main contractor & provided suggestion in case of discrepancy. • Verified all pre-commissioning and commissioning activities implementations are in adherence to the approved health, safety, and environmental and quality procedures. • Observed the master punch list tracker, ensured comments are being complied and witnessed before handover. • Evaluated and signoff of final test packs for all mechanical and special systems submitted by the main contractor. • Sustained the documentation to the full proof of our activities including supporting documents & correspondence.

    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Commissioning Engineer
      • Jun 2015 - Jun 2017

      • Reviewed the approved HVAC construction plan (HVAC drawings, Specification, Schematic, Submittals) • Reassured the availability of adequate resources (manpower and material) for the execution of assigned job with adherence to HSE procedures. • Worked with Civil/Electrical and Mechanical Team & supervised all installations in the preliminary stage and provided snag list for all the issues which affect the commissioning. • Attending coordination meetings with contractors, clients. • Co-ordinate with sub-contractors for safe working practices and work progress. • Developing and implementing of Commissioning plans with efficient work progress. • Executed testing and commissioning of all HVAC equipment’s including DALT & MSFD & Fire Damper test. • Verified, tested, commissioned all air systems of FCU, AHU, VRF, Extract fans, VAV, FAV, CAV, Fume hood extract & Water systems of Chilled water pumps(Primary & Secondary CHW System) & domestic water pumps including fixed, variable type & autoflow type DRV’s, PICV's. • Tested and balanced of all air and water terminals using the latest instrument in the field of TAB industry including ultrasonic meter • Executed Staircase Pressurization testing according to QCDD’s standard. • Manage testing, commissioning and final handover assistance to the facilities management team(petroserv). • Preparing and documenting complete test reports for client submission. • Presented test pack as per the approved schedules to the consultant/client (KEO/Qatar Foundation).

    • Facilities Engineer
      • Jun 2013 - May 2015

      • Evaluate and study the complete list of asset register and O & M manual of each installed equipment. • Prepare weekly, monthly and yearly maintenance check list as recommended in the O & M manual of each equipment. • Scheduling and allocation of work to the technicians for each area as per the requirement with adherence to health, safety and environment procedures. • Observed AHUs, FCUs, Chillers, Sump pumps operation and checked for any abnormalities. • Maintaining a complete log sheet of operation for each HVAC and utilities equipment’s. • Arrangement of spare parts, materials for each HVAC and Utilities equipment’s. • Preparation of Time sheet and work activities for each technician. • Coordinate and plan accordingly with higher management for any immediate major service or replacement of components. • Tracked calibration of gauges, sensors and arranged for the due calibration • Scheduling and Supporting in replacement of components for each equipment once they attain the maximum durability • Assisted OEM technician during major component replacement.

    • Chemical Manufacturing
    • 300 - 400 Employee
    • Graduate Engineering Trainee
      • Oct 2012 - Apr 2013

      • Attended industrial training in Mechanical, Instrumentation field (Plant Safety Induction Course, PTW System, LOTO, Height Safety, and Process Orientation • Interacted with superior’s on-site and attained knowledge about the plant process and problem-solving skills. • Attended industrial training in Mechanical, Instrumentation field (Plant Safety Induction Course, PTW System, LOTO, Height Safety, and Process Orientation • Interacted with superior’s on-site and attained knowledge about the plant process and problem-solving skills.

Education

  • Hindustan University
    Bachelor's degree, Mechanical Engineering
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now