Nilesh Joshi

Sr Piping Designer and Digital Automation Coordinator at Worley
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Brazil
    • Business Consulting and Services
    • 700 & Above Employee
    • Sr Piping Designer and Digital Automation Coordinator
      • Jan 2021 - Present

      • Apart from Layout, 3D modelling , MTO, preparation & checking of various piping drawings and other activities, I have Created wide range of automation programs in auto-lisp & VBA language for Piping, Process & Instrument activities due to which manhours are saved drastically and quality has improved too. These Programs are being used in various projects in Worley offices. Following key automation programs are created by me in auto-lisp for Piping & process activities.• Valve MTO from P & ID with output in to excel format (tracking of each item is possible)• Fitting MTO (except pipe & elbow) from P & ID with output in to excel format. (tracking of each item is possible)• Rack-Cross section development in Auto-cad by excel Input• Interconnecting diagram development in Auto-cad by excel Input with various customization like automatic graphics creation, automatic flow arrows, Line numbers allocations, independent line review, • Extraction of Line number from P & ID to excel.• Extraction of Instrument Tag numbers with Line number from P & ID to excel.• Extraction of SM numbers with Line number from P & ID to excel.• Extraction of Tie-in numbers from P & ID with from & to Line numbers to excel• Fast Isometrics drafting in 2D auto-cad with consistent symbology• Line number parameters importing from excel Line list in 2D auto-cad isometrics and placing it at appropriate position.• Support Tag extraction from 2D auto-cad Isometrics.• Extraction of HOLD numbers along with hold list item from any drawing. (can be used by any discipline)• Preparation of Plot-Plan in Auto-Cad-3D

    • Sr Piping Designer
      • Dec 2017 - Dec 2020

      Project – Nirma, Gujrat, India. (2017 to 2020) – 2D Project on Auto-cad.• Preparation & Checking of Equipment Lay-out / Piping Layout (PHE, Carbonation columns, Ammonia stg tank, Utility building with CO2 compressor, Chillers, Steam Turbine generation, Deaerator ..…etc)• Bulk MTO automation program creation of Valve & Fitting MTO extraction from PID.• checking and compilation of MTO.• Site Visits to Gujrat for Tie-in points identification.• Checking of Nozzle Orientation.• Coordination with Civil / MEG, FEG / Process / Instrumentation for layout and squad check drawings. Vendor Drawings review & comments.• Coordination with Stress• Checking of Isometrics with supports & MTO (with excel automation linked with CC & Description file)• PID Planometric updation.• Iso tracking file controlling.• Preparation & checking of Non-standard pipe supports.Project – Petrofac project of Abu ali Peninsula, Berri GOSP-6 – Prebid project on Auto-cad. (from October 2018 to Feb 2019)• MTO Project for bidding.• Preparation of Interconnecting diagram of process lines, utility lines and pipe rack sections.• Compilation of MTO of various units.• Delta-MTO coordination and drawing updation as per p & id revision.• Coordination with stress group.• Coordination for standardization with team for consistency in MTO of steam/cond Manifold, Utility stn, drip leg issues, drains ….etc. • Preparation/ Checking of big-bore line sketches.• MTO coordination for various units.• Structural Information to civil.

    • Sr Piping Designer Gr S3
      • Feb 2015 - Dec 2017

      Project – RSPL, Gujrat, India. (2015 TO 2017) – 3D Project on PDS.• Equipment / Piping Modelling in PDS• Participation in 30%, 60% & 90% Client & Internal Model Review• Bulk MTO activities (PDS modelling coordination)• MTO coordination for various units• Structural Information to civil• Checking of modelled lines (PDS) in navis for Preliminary MTO.• Controlling of excel file for line count & coordination.• Vendor offers Review & comments.• Checking of Equipment Layout (for eg. Ammonia stg tank, Utility Bldg, Distillation & Absorption area ..etc) with study of Steam Turbine generator and CO2 compressor, chiller, Deaerator , Plate Heat Exchangers..…etc• Preparation & Checking of Equipment Lay-out / Piping Layout (PHE, Carbonation columns, Ammonia stg tank, Utility building with CO2 compressor, Chillers, Steam Turbine generation, Deaerator ..… etc)• Checking of Nozzle Orientation.• Coordination with Civil / MEG, FEG / Process / Instrumentation for layout and squad check drawings. Vendor Drawings review & comments.• Coordination with Stress• Checking of Isometrics with supports & MTO with navis.• Preparation & checking of Non-standard pipe supports.• Checking / back-checking of Piping Design Basis• P & id – Planometric mark-up. Coordination with Process group.• Preparation & Checking of interconnecting diagram.• Coordination for internal Audit• Coordination with Sub-contractor for Technical / PDS related issues

    • Sr. Piping Designer Gr. S3
      • May 2014 - Feb 2015

      Project – KNPC New Refinery Project (through Petrofac) (Aug 2014 to Feb 2015) 2D Project.• MTO Project for bidding.• Communication/coordination with piping & other discipline unit leads and piping lead of Petrofac.• Checking of Underground layouts.• Compilation of MTO of various units.• Delta-MTO coordination and drawing updation as per p & id revision.• Coordination with stress group.• Pipe rack section updation.• Coordination of standardization with team for steam/cond Manifold, Utility stn, drip leg issues. • Preparation/ Checking of big-bore line sketches.• MTO coordination for various units (for eg. ARU / Rack).• Possible special support information to civil.• Structural Information to civil.• Vendor offers Review & comments.Project - SAUDI ARABIAN OIL COMPANY (May 2014 to Aug 2014) Clean Fuel Project (3D on PDS)• MTO Project for bidding with PDS Modelling.• PDS-Piping modelling with study of Column, Piping, Air Cooler Piping, Exchanger Piping, Flare lines to Knock out drum, • Study & Modelling of Process & utility lines in Rack Area / OSBL rack area.• Area review & Checking of Isometrics. • Coordination with PDS designers. Communication with parent company i.e.Jacobs Zate.

    • Piping Designer Gr S4/S3
      • May 2011 - May 2014

      Project - MONSANTO - Belgium (Jan 2014 to May 2014) (3D on PDMS)• Piping routing & modification with study of process & utility lines in Rack area.• Coordination with PDMS modelers in various issues in piping routing, Steam & Condensate manifold locations. Jacketed Piping.• Isometrics Checking using Navis Review and co-ordination with other checkers.• Standard support selection, Special support preparation, .• Special Support Checking.• Squad check of documents for eg equipment dwg, Vendor dwgs, Civil dwg etc.• P & I D planometric (Geographical) mark-up.• Coordination with stress group Project - NOVARTIS -Singapore (Nov 2013 to Jan 2014) Deputation in Jacobs Singapore• PDS Piping routing Modelling and Support modelling.Project - SADARA – Ras Tanura Integrated Project, Saudi Arabia. (Sept 2012 to Oct -2013) (3D on PDMS)• Piping routing & modification with study of process & utility lines.• Coordination with PDMS modelers in various issues in piping routing, • Isometrics Checking using Navis Review and co-ordination with other checkers.• Standard support selection, Special support preparation, .• Special Support Checking.• Squad check of documents for eg equipment dwg, Vendor dwgs, Civil dwg etc.• P & I D planometric (Geographical) mark-up.• Coordination with stress group • Communication/coordination with client on various issues.Project - Unilever Projects (May 2011 to Sept 2012)• Equipment & Piping Study and modifications for Personal care liquids for main mixer. • Nozzle Orientation, Bulk MTO, Conceptual Plot plan, Vendor data updations.• Coordination with 3D modelers and auto-cad operators.• Hygienic Piping Support standard preparation.• Coordination with Unilever category team (Manchester).• Coordination with other disciplines and PDS administrator.• Cad standard procedure preparation as per Unilever standard.• Site visit to Thailand (Minburi) for measurement for Layout preparation.

    • Japan
    • Construction
    • 700 & Above Employee
    • Piping Designer
      • May 2009 - May 2011

      Project - HPCL DHT Project, Mumbai, India - LSTK Project (3D on PDS) • Piping Study / Modifications and PDS Modelling coordination of Process & Utility Lines including cement lined lines for Exchanger / Tower / Pump / Flare / PSV / sample bomb / sample cooler. • Piping Study/Modelling coordination for Steam/Cond manifold Lines, Utility stations etc. • Equipment Modelling checking and coordination, Nozzle Orientation. • Piping support modelling, • Checking & preparation of Non-standard support sketches with MTO. • Co-ordination/Communication with stress / Process / Instrument dept. • Isometric Checking using 3D SPR, coordination with Isometric Checking team, • Participation in Internal Design Review • Vendor Data updation • ID check of dwgs. • PDS activities like Clash checking / RDB updation. • P & ID Planometric mark-up • As & when required, Modelled Piping & Equipment in PDS and Special support sketched preparation using Auto-cad. Project - HPCL-Mittal SRU Project (Bhatinda, Panjab, India) :- LSTK Project (2D on PDS) • Piping Study/Modification of Process & Utility lines for Tower, K.O.Drum, Exchanger and sample cooler etc. Also involved in piping study like steam/Cond. Manifold, Utility Lines, Utility Stations and Sub-rack etc. • Platform Study of Tower & K.O. Drum. • Preparation of Nozzle Orientation of Columns / K.O. Drums & Other equipments, • Jacketed Piping (Fully/Partially). • Isometrics Checking using 3D SPR & Navis, • PDS Clash checking activity and RDB updation activity. • Coordination with PDS modelling team for piping modification with study. • Vendor data updation like Pumps, control valves, Filters. Sample coolers etc., • Coordination with stress group, • preparation & checking of Non-Standard support sketches with MTO. • P & ID planometric mark-up.

  • Jacobs Engineering, Mumbai, India.
    • Mumbai, Maharashtra, India
    • Sr Piping Designer
      • May 2007 - May 2009

      Project - ANDRITZ Thermtec, Netherlands • Was responsible for Piping Study/Layout, Cadded dwgs checking, • Piping Support study/sketches preparation and checking. • Piping MTO and support MTO. Project - Dow Sunrise, Germany • Activities involved in above project were, detailed design of piping of rack & other area’s using PDS which includes piping study/modifications, Support Study / modelling. Preparation & checking of Non-standard Supports, • Isometrics checking using 3D SPR. • Coordination with Jacobs, Laiden office on process & piping related issues. • Clash checking/resolution activities. • Coordination with stress group and civil group.

    • Jr Design Engineer - Piping
      • Apr 2004 - Apr 2007

      Project - Delta-T Ethanol Plant (Fuel Grade) U.S.A. • Worked on above project as Area coordinator of Main Process Bldg. • Activities included were Equipment Layout study/modelling, Piping Study with modelling using Auto-plant 2004. • Coordination with other Designers.• Other activities like Piping support study and modelling, Nozzle Orientation, Plot plan, Section drawings , Isometrics checking , GA extraction and checking , Clash check activities of MPB and other area’s. • Coordination with piping design sub-contractors including Auto-plant issues.• Auto-lisp routines, Training of Auto-plant given to piping sub-contractors.Deputed at site of Delta-T Ethanol project (Fuel Grade) in Nebraska , U.S.A.Involved in piping modifications as per process requirement and vendor items, support modifications. Coordination with client and Piping/Equipment erection contractor.Worked on following projects in Chemtex Engineering.• Reliance, India (PDS)• Thai-Oil (ABB), Thailand (PDS)• Delta-T Ethanol Plant, Beverage Grade, U,S.A. (Auto-plant)• Various Prax-air Projects (Auto-plant & PDS)• Jian-gyin, China, (PDS)• Rong-sheng, China, (PDS)• Nan-Ya Plastics, Viatnam, (PDS / Aut-ocad)• I.O.C.L. SRU Project, Guwahati, India, (PDS)• Oil Gas Devp. Phase I, Abu Dhabi, (PDS)• Oil Gas Devp. Phase II, Abu Dhabi, (PDS)• Polycron, U.S.A., (PDS)• Sontara, Line-5, Spain (Du-pont Project on A-plant and Micro-station)• Tyvek Line 7, U.S.A. (Du-pont Project on A-plant and Auto-cad)• Pet Resin Plant, Pallanza, Italy. • Reliance S.S.P., Hazira, India.• Sasa S.S.P., Turkey,• Tyvek Line-5, Luxemberg, (Du-pont Project on A-plant and Auto-cad)• Tyvek Line-4, U.S.A., (Du-pont Project on A-plant and Auto-cad)

    • Piping Designer Gr. III, II & I
      • Sep 1992 - Apr 2004

      Activities in Chemtex were included Piping Study layout with modelling, Jacketed Piping, Equipment Layout study/modelling , Piping support study and modelling, Preparation of Non-standard support sketches , Nozzle Orientations, Plot plans, MTO, Section drawings , Isometrics checking with BOM, GA extraction and checking , Clash check activities, Design Reviews using various softwares like PDS, Auto-Plant, Micro-station & Auto-cad.Participated in developing In-house Piping Menu and created various Lisp routines for Piping design in Auto-plant and Auto-cad for fast and accurate output. Gave training of PDS, Auto-cad, Auto Plant & in-house Pipe menu to company employee’s & Piping Sub-Contractors. Deputed at CCIL, Bangalore for Jian-gyin project for 4 Months.

    • India
    • Oil and Gas
    • 1 - 100 Employee
    • Draughtsman (Cad Dept),
      • Aug 1990 - Aug 1992

      Project – Laxmi Organic Chemicals Maharashtra, India & King Chemicals, Chennai, India • Preparation of Piping layout & Equipment Layout, Section drawings. • Nozzle Orientation, • Plot plan updation • MTO activities, • Isometrics preparation with BOM, • p & I d’s, P.F.D.’s on Auto-cad. Project – Laxmi Organic Chemicals Maharashtra, India & King Chemicals, Chennai, India • Preparation of Piping layout & Equipment Layout, Section drawings. • Nozzle Orientation, • Plot plan updation • MTO activities, • Isometrics preparation with BOM, • p & I d’s, P.F.D.’s on Auto-cad.

  • ICB Limited (now Technimont)
    • Mumbai, Maharashtra, India
    • Trainee Draughtsman (Cad Dept),
      • Apr 1990 - Aug 1990

      Project – Century India, Maharashtra, India. • Preparation of Equipment Layout • Nozzle Orientation • Plot plan updation • Isometrics with BOM • p & I d’s, P.F.D.’s on Auto-cad. Project – Century India, Maharashtra, India. • Preparation of Equipment Layout • Nozzle Orientation • Plot plan updation • Isometrics with BOM • p & I d’s, P.F.D.’s on Auto-cad.

  • Davy Powergas India PVT LTD
    • Mumbai, Maharashtra, India
    • Apprentice Draughtsman (Cad Dept.)
      • Apr 1989 - Mar 1990

      Project – Deepak Fertilizers, Herdillia Chemicals, Maharashtra, India • Preparation of Equipment Layout • Nozzle Orientation • Plot plan updation • Isometrics with BOM • p & I d’s, P.F.D.’s on Auto-cad. Project – Deepak Fertilizers, Herdillia Chemicals, Maharashtra, India • Preparation of Equipment Layout • Nozzle Orientation • Plot plan updation • Isometrics with BOM • p & I d’s, P.F.D.’s on Auto-cad.

Education

  • NCTVT Draughtsman Mechanical from Gurukul ITI, Mumbai, Maharashtra, India

Community

You need to have a working account to view this content. Click here to join now