Nikhil Penchalwar
Wissenschaftlische Hilfskraft im bereich der CFD-Simulationen at Technische Universität Kaiserslautern- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Telugu Native or bilingual proficiency
-
Hindi Native or bilingual proficiency
-
English Professional working proficiency
-
German Limited working proficiency
Topline Score
Bio
Credentials
-
Control Design Onramp with Simulink
MathWorksOct, 2022- Nov, 2024 -
Simulink Onramp
MathWorksOct, 2022- Nov, 2024 -
Goethe-Zertifikat B2
Goethe-Institut e.V.Jun, 2021- Nov, 2024 -
Goethe-Zertifikat B1
Goethe-Institut e.V.Sep, 2020- Nov, 2024 -
Autodesk Ambassador Gold
AutodeskJun, 2020- Nov, 2024 -
Goethe-Zertifikat A1
Goethe-Institut e.V.Mar, 2020- Nov, 2024 -
Rapid Manufacturing
NPTELMay, 2019- Nov, 2024 -
Autodesk Fusion 360 Certified User
AutodeskFeb, 2018- Nov, 2024 -
Autodesk Student Expert
AutodeskFeb, 2018- Nov, 2024 -
Simscale Student Ambassador
SimScale GmbHSep, 2017- Nov, 2024 -
Featured Publisher in Autodesk Gallery
AutodeskJun, 2017- Nov, 2024
Experience
-
RPTU Kaiserslautern-Landau
-
Germany
-
Research Services
-
700 & Above Employee
-
Wissenschaftlische Hilfskraft im bereich der CFD-Simulationen
-
Jul 2022 - Present
Vorverarbeitung der Simulationsdaten. Durchführung von Parameterstudien in Ansys Fluent. Literaturrecherche und deren Zusammenfassung Vorverarbeitung der Simulationsdaten. Durchführung von Parameterstudien in Ansys Fluent. Literaturrecherche und deren Zusammenfassung
-
-
-
Titan Company Limited
-
India
-
Retail
-
700 & Above Employee
-
Project Trainee
-
Jun 2018 - Oct 2018
Designed Process Layouts for Tool Room and saved 4.62 m2 Area to add another Fully Automated Die Set Storage Machine (Kerosal).Worked on Reliability of Die Sets and found the top reasons for the breakage of Punches in Die Sets by use of Pareto Chart.Did Reverse Engineering of a Grinding Wheel and created an AutoCAD Drawing from it.Created a Lead Time Reduction Sheet for 5 Die Sets which reduced time taken for the maintenance of those Die Sets by one hour each. Designed Process Layouts for Tool Room and saved 4.62 m2 Area to add another Fully Automated Die Set Storage Machine (Kerosal).Worked on Reliability of Die Sets and found the top reasons for the breakage of Punches in Die Sets by use of Pareto Chart.Did Reverse Engineering of a Grinding Wheel and created an AutoCAD Drawing from it.Created a Lead Time Reduction Sheet for 5 Die Sets which reduced time taken for the maintenance of those Die Sets by one hour each.
-
-
-
Caterpillar Inc.
-
United States
-
Machinery Manufacturing
-
700 & Above Employee
-
Manufacturing Intern
-
May 2018 - May 2018
Load optimization in Prime Product Paint Plant and pinch point elimination by designing and fabrication of safety tools. Load optimization in Prime Product Paint Plant and pinch point elimination by designing and fabrication of safety tools.
-
-
Education
-
University of Kaiserslautern
Master of Science - MS, Commercial Vehicle Technology -
Indian Institute of Information Technology Design & Manufacturing Kancheepuram
Bachelor of Technology, Maschinenbau