Nijas Abdul Karim Greenyhood

Senior Quantity Surveyor (Site Contracts Admin & Procurements) at Limitless
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
United Arab Emirates, AE
Languages
  • Hindi Native or bilingual proficiency
  • English Professional working proficiency
  • Malayalam Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Osman Sati Mohamed

I came to know Mr. Nijas while working together at an Infrastructure project in Al Ain; Nijas is a professional Sr. Quantity Surveyor, detailed-oriented and organized person, I strongly recommend him for future opportunities.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Real Estate
    • 100 - 200 Employee
    • Senior Quantity Surveyor (Site Contracts Admin & Procurements)
      • Jun 2012 - Present

      Major Procurement and Site Contract Administration did as follows: (1) Infrastructure balance work comprising roads, sewer, drainage, water, district cooling, street lighting and telecom networks for Zone 1, 2, 3 & 4 (AED 285 Million) and Construction of two Chiller plants (19.8 Million) located at Downtown Jabel Ali, Dubai, UAE (2) Infrastructure works comprising roads, retaining structures, culverts, sewer, drainage, water, street lighting networks located at Halong Bay, Vietnam (AED… Show more Major Procurement and Site Contract Administration did as follows: (1) Infrastructure balance work comprising roads, sewer, drainage, water, district cooling, street lighting and telecom networks for Zone 1, 2, 3 & 4 (AED 285 Million) and Construction of two Chiller plants (19.8 Million) located at Downtown Jabel Ali, Dubai, UAE (2) Infrastructure works comprising roads, retaining structures, culverts, sewer, drainage, water, street lighting networks located at Halong Bay, Vietnam (AED 48 Million) (3) MX 01 & 04 residential building's balance work (AED 324 Million - 25 storeys building structure were completed in the year 2009) and MX 05 car park 5 storeys building (AED 72 Million) located at Downtown Jabel Ali, Dubai, UAE Tendering works for the above projects were part of my responsibility in addition to the site contract administration works. Achievements / Tasks: -  Checking and finalization of Interim payments  Valuation of Final accounts for the completed projects in accordance with the Contract Conditions.  Evaluation & Approval of New Rates for re-measurable and lump-sum contracts.  Evaluation & Approval of variations for Infrastructure and building works.  Attending site Progress meetings, monitoring the site progress and cost implications due to variations.  Preparation of variation approvals / site instruction in accordance with the contract conditions & liaising with consultant / contractor for approval/ execution.  Site Contract Administration and coordination with Consultants & Contractors  Budget preparation  Preparation of Tender packages for UAE & international projects  Floating of tender, organizing site visit and managing tender queries.  Preparation of Tender Analysis, Negotiation with Bidders, Finalization and Tender Award. • Preparation of tender cost analysis and recommendations for further approval. • Preparation of contracts and agreement. Show less Major Procurement and Site Contract Administration did as follows: (1) Infrastructure balance work comprising roads, sewer, drainage, water, district cooling, street lighting and telecom networks for Zone 1, 2, 3 & 4 (AED 285 Million) and Construction of two Chiller plants (19.8 Million) located at Downtown Jabel Ali, Dubai, UAE (2) Infrastructure works comprising roads, retaining structures, culverts, sewer, drainage, water, street lighting networks located at Halong Bay, Vietnam (AED… Show more Major Procurement and Site Contract Administration did as follows: (1) Infrastructure balance work comprising roads, sewer, drainage, water, district cooling, street lighting and telecom networks for Zone 1, 2, 3 & 4 (AED 285 Million) and Construction of two Chiller plants (19.8 Million) located at Downtown Jabel Ali, Dubai, UAE (2) Infrastructure works comprising roads, retaining structures, culverts, sewer, drainage, water, street lighting networks located at Halong Bay, Vietnam (AED 48 Million) (3) MX 01 & 04 residential building's balance work (AED 324 Million - 25 storeys building structure were completed in the year 2009) and MX 05 car park 5 storeys building (AED 72 Million) located at Downtown Jabel Ali, Dubai, UAE Tendering works for the above projects were part of my responsibility in addition to the site contract administration works. Achievements / Tasks: -  Checking and finalization of Interim payments  Valuation of Final accounts for the completed projects in accordance with the Contract Conditions.  Evaluation & Approval of New Rates for re-measurable and lump-sum contracts.  Evaluation & Approval of variations for Infrastructure and building works.  Attending site Progress meetings, monitoring the site progress and cost implications due to variations.  Preparation of variation approvals / site instruction in accordance with the contract conditions & liaising with consultant / contractor for approval/ execution.  Site Contract Administration and coordination with Consultants & Contractors  Budget preparation  Preparation of Tender packages for UAE & international projects  Floating of tender, organizing site visit and managing tender queries.  Preparation of Tender Analysis, Negotiation with Bidders, Finalization and Tender Award. • Preparation of tender cost analysis and recommendations for further approval. • Preparation of contracts and agreement. Show less

    • Germany
    • Architecture and Planning
    • 300 - 400 Employee
    • Quantity Surveyor
      • Apr 2010 - Apr 2012

      Presently working in Project: Infrastructure works for Public housing project, Neima Area, Al Ain – Phase-1 (220 Million) Client: MUSANADA The responsibilities are as follows:-  Checking and finalization of work done.  Valuation of Final Payment for the completed projects.  Finalization of quantities.  Preparation of sub contract documents and correspondence with client and contractors.  Evaluating the submitted New Rates and finalizing.  Cost control and cost… Show more Presently working in Project: Infrastructure works for Public housing project, Neima Area, Al Ain – Phase-1 (220 Million) Client: MUSANADA The responsibilities are as follows:-  Checking and finalization of work done.  Valuation of Final Payment for the completed projects.  Finalization of quantities.  Preparation of sub contract documents and correspondence with client and contractors.  Evaluating the submitted New Rates and finalizing.  Cost control and cost saving in respect to the BOQ and the actual work executed.  Evaluating the claims submitted by the contractor and recommending to the client. Show less Presently working in Project: Infrastructure works for Public housing project, Neima Area, Al Ain – Phase-1 (220 Million) Client: MUSANADA The responsibilities are as follows:-  Checking and finalization of work done.  Valuation of Final Payment for the completed projects.  Finalization of quantities.  Preparation of sub contract documents and correspondence with client and contractors.  Evaluating the submitted New Rates and finalizing.  Cost control and cost… Show more Presently working in Project: Infrastructure works for Public housing project, Neima Area, Al Ain – Phase-1 (220 Million) Client: MUSANADA The responsibilities are as follows:-  Checking and finalization of work done.  Valuation of Final Payment for the completed projects.  Finalization of quantities.  Preparation of sub contract documents and correspondence with client and contractors.  Evaluating the submitted New Rates and finalizing.  Cost control and cost saving in respect to the BOQ and the actual work executed.  Evaluating the claims submitted by the contractor and recommending to the client. Show less

    • United States
    • Professional Services
    • 700 & Above Employee
    • Quantity Surveyor
      • Apr 2007 - Apr 2010

      Project: Burj Dubai Development, Roads and Infrastructure Works Phase 4 and construction of three bridges by M/S EMAAR (120 Million) The responsibilities are as follows:-  Checking and finalization of work done.  Valuation of Final Payment for the completed projects.  Finalization of quantities.  Preparation of sub contract documents and correspondence with client and contractors.  Finalization of Interim Payments for Bridge works  Certifying the quantities and… Show more Project: Burj Dubai Development, Roads and Infrastructure Works Phase 4 and construction of three bridges by M/S EMAAR (120 Million) The responsibilities are as follows:-  Checking and finalization of work done.  Valuation of Final Payment for the completed projects.  Finalization of quantities.  Preparation of sub contract documents and correspondence with client and contractors.  Finalization of Interim Payments for Bridge works  Certifying the quantities and the payments of Lake Dozing, Cleaning.  Evaluating the submitted New Rates and finalizing.  Cost control and cost saving in respect to the BOQ and the actual work executed.  Evaluating the claims submitted by the contractor and recommending to the client.  Evaluating the tenders, pre qualifications and recommending to the Client.  Finalizing the sub contract quotations for client and recommending the sub-contractor to the Client. Project: NHP Al Warqaa 544 (581 Million) & Muteena 940 Villas (1.32 Billion) by M/S EMAAR The responsibilities are as follows:-  Checking and finalization of Interim payments.  Valuation of Final Payment for the completed projects.  Approval of New Rates.  Valuation of variations.  Finalization of quantities.  Preparation of sub contract documents and correspondence with client and contractors.  Monitoring the cost impactions for the variations. Show less Project: Burj Dubai Development, Roads and Infrastructure Works Phase 4 and construction of three bridges by M/S EMAAR (120 Million) The responsibilities are as follows:-  Checking and finalization of work done.  Valuation of Final Payment for the completed projects.  Finalization of quantities.  Preparation of sub contract documents and correspondence with client and contractors.  Finalization of Interim Payments for Bridge works  Certifying the quantities and… Show more Project: Burj Dubai Development, Roads and Infrastructure Works Phase 4 and construction of three bridges by M/S EMAAR (120 Million) The responsibilities are as follows:-  Checking and finalization of work done.  Valuation of Final Payment for the completed projects.  Finalization of quantities.  Preparation of sub contract documents and correspondence with client and contractors.  Finalization of Interim Payments for Bridge works  Certifying the quantities and the payments of Lake Dozing, Cleaning.  Evaluating the submitted New Rates and finalizing.  Cost control and cost saving in respect to the BOQ and the actual work executed.  Evaluating the claims submitted by the contractor and recommending to the client.  Evaluating the tenders, pre qualifications and recommending to the Client.  Finalizing the sub contract quotations for client and recommending the sub-contractor to the Client. Project: NHP Al Warqaa 544 (581 Million) & Muteena 940 Villas (1.32 Billion) by M/S EMAAR The responsibilities are as follows:-  Checking and finalization of Interim payments.  Valuation of Final Payment for the completed projects.  Approval of New Rates.  Valuation of variations.  Finalization of quantities.  Preparation of sub contract documents and correspondence with client and contractors.  Monitoring the cost impactions for the variations. Show less

    • Construction
    • 700 & Above Employee
    • Estimator / Cost Engineer
      • 2004 - 2007

      The responsibilities are as follows:-  Preparation of Bill of Quantities and re-measurement of quantities for lump sum jobs.  Preparing estimate of tender for the project in U.A.E, Qatar and Bahrain.  Coordinate with the site and suppliers for getting information and material prices.  Preparing the cost for each item mentioned in tender as per the drawing and specification issued with the tender document.  Preparation of variations job in contracts.  Preparation of… Show more The responsibilities are as follows:-  Preparation of Bill of Quantities and re-measurement of quantities for lump sum jobs.  Preparing estimate of tender for the project in U.A.E, Qatar and Bahrain.  Coordinate with the site and suppliers for getting information and material prices.  Preparing the cost for each item mentioned in tender as per the drawing and specification issued with the tender document.  Preparation of variations job in contracts.  Preparation of contracts documents for the submission of tender.  Calculation of earthwork quantity using civil 3D 2007. Show less The responsibilities are as follows:-  Preparation of Bill of Quantities and re-measurement of quantities for lump sum jobs.  Preparing estimate of tender for the project in U.A.E, Qatar and Bahrain.  Coordinate with the site and suppliers for getting information and material prices.  Preparing the cost for each item mentioned in tender as per the drawing and specification issued with the tender document.  Preparation of variations job in contracts.  Preparation of… Show more The responsibilities are as follows:-  Preparation of Bill of Quantities and re-measurement of quantities for lump sum jobs.  Preparing estimate of tender for the project in U.A.E, Qatar and Bahrain.  Coordinate with the site and suppliers for getting information and material prices.  Preparing the cost for each item mentioned in tender as per the drawing and specification issued with the tender document.  Preparation of variations job in contracts.  Preparation of contracts documents for the submission of tender.  Calculation of earthwork quantity using civil 3D 2007. Show less

    • Quantity Surveyor / Estimator
      • 2002 - 2004

      The responsibilities are as follows:-  Preparation of Bill of Quantities and re-measurement of quantities for lump sum jobs.  Preparing estimate of tender for the project in U.A.E.  Coordinate with the site and suppliers for getting information and material prices.  Preparing the cost for each item mentioned in tender as per the drawing and specification issued with the tender document.  Preparation of variations job in contracts.  Preparation of contracts documents for… Show more The responsibilities are as follows:-  Preparation of Bill of Quantities and re-measurement of quantities for lump sum jobs.  Preparing estimate of tender for the project in U.A.E.  Coordinate with the site and suppliers for getting information and material prices.  Preparing the cost for each item mentioned in tender as per the drawing and specification issued with the tender document.  Preparation of variations job in contracts.  Preparation of contracts documents for the submission of tender. SITE EXPERIENCE Project 1: Sheikh Zayed Bridge for Abu Dhabi Island – Contract 2  Client: Works Department-Emirate of Abu Dhabi.  Consultant: Rendel Palmer & Tritton.  Contract Value: UAE Dhs. 117.20 Million. Project 2: Construction of Internal Roads at Al Shawamech Contract 5  Client: Works Department-Emirate of Abu Dhabi.  Consultant: Frederic R. Harris.  Contract Value: UAE Dhs. 75.00 Million. Show less The responsibilities are as follows:-  Preparation of Bill of Quantities and re-measurement of quantities for lump sum jobs.  Preparing estimate of tender for the project in U.A.E.  Coordinate with the site and suppliers for getting information and material prices.  Preparing the cost for each item mentioned in tender as per the drawing and specification issued with the tender document.  Preparation of variations job in contracts.  Preparation of contracts documents for… Show more The responsibilities are as follows:-  Preparation of Bill of Quantities and re-measurement of quantities for lump sum jobs.  Preparing estimate of tender for the project in U.A.E.  Coordinate with the site and suppliers for getting information and material prices.  Preparing the cost for each item mentioned in tender as per the drawing and specification issued with the tender document.  Preparation of variations job in contracts.  Preparation of contracts documents for the submission of tender. SITE EXPERIENCE Project 1: Sheikh Zayed Bridge for Abu Dhabi Island – Contract 2  Client: Works Department-Emirate of Abu Dhabi.  Consultant: Rendel Palmer & Tritton.  Contract Value: UAE Dhs. 117.20 Million. Project 2: Construction of Internal Roads at Al Shawamech Contract 5  Client: Works Department-Emirate of Abu Dhabi.  Consultant: Frederic R. Harris.  Contract Value: UAE Dhs. 75.00 Million. Show less

    • Contract Administrator
      • 1998 - 2001

      The responsibilities are as follows:-  Preparation of Bill of Quantities and tender documents, supervising works associated with project management, Mechanical designs and draught, Liaising between various government agencies like ADWEA, WD, Municipality, Etisalat for drawing approvals. The works completed were: o Policemen Club Abu Dhabi – WD works o Mosque in Baniyas East –WD works o Villa and Tower Works The responsibilities are as follows:-  Preparation of Bill of Quantities and tender documents, supervising works associated with project management, Mechanical designs and draught, Liaising between various government agencies like ADWEA, WD, Municipality, Etisalat for drawing approvals. The works completed were: o Policemen Club Abu Dhabi – WD works o Mosque in Baniyas East –WD works o Villa and Tower Works

    • Civil Engineer
      • Feb 1997 - Dec 1997

      The responsibilities are as follows:-  Supervising the construction of residential building for Sheikh Hamdan Al Nahiyan.  Supervising the construction of two school buildings. The responsibilities are as follows:-  Supervising the construction of residential building for Sheikh Hamdan Al Nahiyan.  Supervising the construction of two school buildings.

    • JUNIOR ENGINEER
      • Jan 1995 - Jan 1997

      The responsibilities are as follows:-  Preparation of Estimates, Construction of water retaining structures etc.  Supervision of road projects The responsibilities are as follows:-  Preparation of Estimates, Construction of water retaining structures etc.  Supervision of road projects

Education

  • Heriot-Watt University Dubai
    Master of Science (M.Sc.), Quantity Surveying
    2009 - 2010
  • Heriot-Watt University Dubai
    Postgraduate Diploma, Quantity Surveying
    2008 - 2009
  • Seethi Sahib Memmorial Poly Technique, Tirur, Kerala, India
    Higher Diploma, Civil Engineering
    1991 - 1994

Community

You need to have a working account to view this content. Click here to join now