Sr. Planning & Project Controls Engineer (MEP/ Infra/ Oil & Gas/ Fit-out)
-
Jul 2022 - Oct 2023
Doha, Qatar Pre- Contract: • Prepared Pre-design, design, tender and award, procurement, construction, Testing, Commissioning and Handover schedules. • Analyzed project requirements/ Scope of Works/ Project organization Chart. Post- Contract: • Detailed Baseline Program Preparation in PRIMAVERA P6. • Coordinated and liaised with subcontractors and authorities in relation to planning, programming, Procurement & IPA Valuation matters for the various interfaces • Reviewed, Validated… Show more Pre- Contract: • Prepared Pre-design, design, tender and award, procurement, construction, Testing, Commissioning and Handover schedules. • Analyzed project requirements/ Scope of Works/ Project organization Chart. Post- Contract: • Detailed Baseline Program Preparation in PRIMAVERA P6. • Coordinated and liaised with subcontractors and authorities in relation to planning, programming, Procurement & IPA Valuation matters for the various interfaces • Reviewed, Validated and Endorsed Contractor submitted Planning Packages including Execution Program/Recovery Plans, Resource Plan, and progress measurement and reporting system. • Prepared and maintained material procurement and Delivery tracking schedule • Developed and maintained Cost Control Databases. • Prepared detailed cash flow for project. • Monitored and analyzed Project incurred costs against the planned budget to ensure compliance with plans and budget. • Prepared and maintained Risk register. • Documented schedule changes • Determined any possible Time Impact due to scope changes/ Variations. • Prepared and maintained contractual letters, Delay notifications, Notice of variations to client/ Contractor/ Sub-contractors. Compared & analyzed CPI and SPI. Prepared & updated CTC on monthly basis in liaising with Project Manager. Prepared and analyzed IPA, VO claims, EOT Claims (Time & Cost). Prepared EOT & Prolongation Cost Claims using Time Impact Analysis Method/ Window Analysis/ As-planned As-built Method/ Impacted As-planned Method. * Prepared and reviewed Contractual letters regarding Claims, Back charge, Cost savings, etc. Reporting Management: • Regularly issued the project progress Report (Daily / Weekly / Monthly). • Performed Project costing related reporting. • Power Point presentation to Management • Meeting: Participated in the progress and coordination meetings with Client/ Management/ Subcontractors in order to discuss the status of the project and identify the potential slippages & risks. Show less
-
-
-
Roots Energy And Engineering Services WLL
-
Construction
-
200 - 300 Employee
-
Planning & Project Controls Engineer (MEP/ Infra/ Oil & Gas)
-
Nov 2020 - Jul 2022
Doha, Qatar • Programming: Initiated, prepared & developed L2, L3, L4 & Micro level cost & resource loaded Program in PRIMAVERA P6 according to standards, contract specifications and accepted Project management practices and Staged throughout the Project Lifecycle from Initiation to Close-out. • Coordinated and liaised with subcontractors and authorities in relation to planning, programming, Procurement &IPA Valuation matters for the various interfaces that exist on the project •… Show more • Programming: Initiated, prepared & developed L2, L3, L4 & Micro level cost & resource loaded Program in PRIMAVERA P6 according to standards, contract specifications and accepted Project management practices and Staged throughout the Project Lifecycle from Initiation to Close-out. • Coordinated and liaised with subcontractors and authorities in relation to planning, programming, Procurement &IPA Valuation matters for the various interfaces that exist on the project • Reviewed, Validated and Endorsed Contractor submitted Planning Package including Execution Program/Recovery Plans/ Revised Program, Resource Plan, and progress measurement and reporting system to ensure that a proper system is in place for effective project control and in compliance with contractual requirements. Resource & Cost loading in Baseline Program and Target program with Project team • Prepared and maintained material procurement and Delivery tracker. • Developed and maintained Cost Control Databases. • Cash Flow: Prepared detailed cash flow for project. • Controlled and monitored project total expenditure including verifying and checking of invoices and claims from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly recorded. • Introduced mitigation measures well ahead during the project lifecycle to ensure the project budget is not exceeded. • Prepared and maintained Risk register. • Determined any possible Time Impact due to scope changes/ Variations. • Prepared and maintained contractual letters, Delay notifications, Notice of variations to client/ Contractor/ Sub-contractors. Compared& analyzed CPI and SPI. Prepared& updated CTC on monthly basis in liaising with Project Manager. Prepared and analyzed Interim payment applications, VO claims. Extension of Time: Prepared Extension of Time (EOT) & Prolongation Cost Claims using Time Impact Analysis Method/ Window Analysis/ As-planned As-built Method/ Impacted As-planned Method. Show less
-
-
-
Arabian MEP Contracting
-
Qatar
-
Construction
-
200 - 300 Employee
-
Planning & Project Controls Engineer (MEP/ Infra)
-
Mar 2018 - Oct 2020
Doha, Qatar • Programming: Initiated, prepared & developed L2, L3, L4 & Micro level cost & resource loaded Program in PRIMAVERA P6 according to standards, contract specifications and accepted Project management practices and Staged throughout the Project Lifecycle from Initiation to Close-out. • Coordinated and liaised with subcontractors and authorities in relation to planning, programming, Procurement &IPA Valuation matters for the various interfaces that exist on the project •… Show more • Programming: Initiated, prepared & developed L2, L3, L4 & Micro level cost & resource loaded Program in PRIMAVERA P6 according to standards, contract specifications and accepted Project management practices and Staged throughout the Project Lifecycle from Initiation to Close-out. • Coordinated and liaised with subcontractors and authorities in relation to planning, programming, Procurement &IPA Valuation matters for the various interfaces that exist on the project • Reviewed, Validated and Endorsed Contractor submitted Planning Package including Execution Program/Recovery Plans/ Revised Program, Resource Plan, and progress measurement and reporting system to ensure that a proper system is in place for effective project control and in compliance with contractual requirements. Resource & Cost loading in Baseline Program and Target program with Project team • Prepared and maintained material procurement and Delivery tracker. • Developed and maintained Cost Control Databases. • Cash Flow: Prepared detailed cash flow for project. • Controlled and monitored project total expenditure including verifying and checking of invoices and claims from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly recorded. • Introduced mitigation measures well ahead during the project lifecycle to ensure the project budget is not exceeded. • Prepared and maintained Risk register. • Determined any possible Time Impact due to scope changes/ Variations. • Prepared and maintained contractual letters, Delay notifications, Notice of variations to client/ Contractor/ Sub-contractors. Compared& analyzed CPI and SPI. Prepared& updated CTC on monthly basis in liaising with Project Manager. Prepared and analyzed Interim payment applications, VO claims. Extension of Time: Prepared Extension of Time (EOT) & Prolongation Cost Claims using Time Impact Analysis Method/ Window Analysis/ As-planned As-built Method/ Impacted As-planned Method. Show less
-
-
-
-
Jr. Planning Engineer/ Site Engineer
-
May 2015 - Feb 2018
Doha, Qatar As a Site Engineer cum Jr. Planning Engineer, I handled the responsibilities of coordinating the site activities from arranging the materials, Shop drawings, strategy of the execution to be followed, monitoring the progress on a daily basis, reporting to the management, etc. Major Planning responsibilities are as below, • Schedules, plans and oversees the entire program. • Plans, organizes, and coordinates planning activities. To prepare and arrange for weekly/monthly/quarterly… Show more As a Site Engineer cum Jr. Planning Engineer, I handled the responsibilities of coordinating the site activities from arranging the materials, Shop drawings, strategy of the execution to be followed, monitoring the progress on a daily basis, reporting to the management, etc. Major Planning responsibilities are as below, • Schedules, plans and oversees the entire program. • Plans, organizes, and coordinates planning activities. To prepare and arrange for weekly/monthly/quarterly updates • Monitors progress periodically and compares it with the baseline planning • Updates the schedule based on inputs received from project team • Prepares Progress reports • Prepares Labor histograms To make plan and control works according to budgets. Show less
-
-