Nicolás Strauss
Management at Plastar Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Español Native or bilingual proficiency
-
Inglés Native or bilingual proficiency
-
Portugués Professional working proficiency
-
Sueco Limited working proficiency
Topline Score
Bio
Experience
-
Plastar Group
-
Argentina
-
Plastics Manufacturing
-
1 - 100 Employee
-
Management
-
Oct 2022 - Present
-
-
-
Shell
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Senior Drilling Engineer
-
Feb 2021 - Oct 2022
Senior Drilling Engineer representing Bandurria Sur Investments (BSI), partnership between Shell and Equinor, in a Joint Venture with YPF with the objective of developing an Unconventional field in the Neuquen Vaca Muerta Basin.
-
-
Lead Drilling Supervisor
-
Nov 2018 - Feb 2021
-
-
Drilling Supervisor
-
Aug 2016 - Nov 2018
-
-
-
SLB
-
United States
-
Technology, Information and Internet
-
700 & Above Employee
-
Well Engineer II - Integrated Drilling Services (IDS)
-
Nov 2015 - Aug 2016
Engineer in charge of a 2000 HP rig drilling HPHT gas wells for Saudi Aramco on the Ghawar Gas Field Project.
-
-
Well Engineer II - Integrated Drilling Services (IDS)
-
Aug 2015 - Oct 2015
Part of a team managing a 1500HP rig drilling horizontal exploratory wells for Shell on the Vaca Muerta Shale Play in Neuquen, Argentina.
-
-
Well Engineer 1 - IPM WCI
-
Sep 2014 - Aug 2015
Part of a team managing a 1500HP rig drilling horizontal exploratory wells for Shell on the Vaca Muerta Shale Play in Neuquen, Argentina.
-
-
IPM Well Engineer Trainee
-
Aug 2013 - Sep 2014
- Shell Neuquén Unconventional Shale Project. Drilling horizontal exploratory wells for Shell in the Neuquén basin, Argentina. AWSS.- International Assignment in West Venezuela, Offshore Maracaibo Lake. Rig: AJS-101. September 2013 / January 2014
-
-
-
NOV
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Evaluations Engineer
-
Jan 2013 - Aug 2013
• PDM and drilling tools field operator • Engineering support and drilling optimization • Distribution of equipment and tools • PDM and drilling tools field operator • Engineering support and drilling optimization • Distribution of equipment and tools
-
-
-
Chevron
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Intern with the Asset Development Team
-
Nov 2011 - Jan 2013
Main activities: • Design and construction of equipment and surface facilities • Procurement of equipment and materials • Participation in projects: Puesto Flores field development, Puesto Flores Battery construction and start-up, Puesto Flores Temporary Facilities, Puesto Flores-Loma Negra Pipeline, Implementation of the metric Energy Intensity at El Trapial field, Surface Facilities for developing Vaca Muerta Shale Main activities: • Design and construction of equipment and surface facilities • Procurement of equipment and materials • Participation in projects: Puesto Flores field development, Puesto Flores Battery construction and start-up, Puesto Flores Temporary Facilities, Puesto Flores-Loma Negra Pipeline, Implementation of the metric Energy Intensity at El Trapial field, Surface Facilities for developing Vaca Muerta Shale
-
-
-
-
Section Manager: Energy, Science and Technology
-
Aug 2010 - Aug 2012
-
-
Education
-
Instituto Tecnológico de Buenos Aires / ITBA
Petroleum Engineer, Petroleum Engineering