Nick Smith

Industrial Electrician at Plating Technology, Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Waynesville, Ohio, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Motor Vehicle Manufacturing
    • 1 - 100 Employee
    • Industrial Electrician
      • May 2021 - Present

    • United States
    • Manufacturing
    • 700 & Above Employee
    • Senior Industrial Maintenance Technician
      • Feb 2019 - May 2021

    • Project Manager Sales Operations
      • Jul 2018 - Jun 2019

    • United States
    • Entertainment Providers
    • 700 & Above Employee
    • Engineering Service Manger
      • Dec 2014 - Jun 2018

      Provide facilities and maintenance engineering strategies and services. Direct and manage the activities of personnel engaged in engineering and maintenance functions. Manage projects, carry out assignments and perform various other duties as assigned. Collaborate with other company lines of business with respect to engineering and maintenance related issues. Prepare budgets, bids, and contracts. Develop cost estimates. Check technical accuracy of work. Coordinate activities of team with other lines of business. Lead a team of up to 30 skilled maintenance technicians and mechanics.

    • Planned Work Specialist, Global Contracts
      • Dec 2011 - Dec 2014

      Coordinate and oversee all aspects of three primary global maintenance contracts, and facilitate various ad hoc projects as requested. Communicate with vendors, technicians, and colleagues at all levels, and participate heavily in scope development, bidding process, program implementation, and program maintenance. Valve Exercise Program: Independently designed and implemented new turnkey program for locating, raising, and exercising property-wide underground water valves. Worked directly with utility company to acquire maps of valve locations, contracted vendor to identify and geo-locate valves in the field, entered data into electronic GIS database, coordinated scheduling between multiple vendors and departments, and defined cyclical maintenance program to provide maximum valve life.  Successfully located and documented over 3,000 underground valves, satisfying a new insurance requirement and delivering a precise digital map of all underground valves across WDW. Fire Correction Notification System (FCNS): Identified opportunity to assist with the correction of property-wide fire code violations by leveraging volume into a single competitive bid to deliver fixed unit pricing. Collaborated with 12 planners across all WDW parks and resorts to quantify a backlog of work and forecast future workload. Partnered with Reedy Creek Fire Department leaders and inspectors, all local properties, IT support teams, and multiple vendors to ensure efficient use of funds, resulting in a six-figure annual savings as verified by historical analysis.  Managed 4th Quarter spend over the last two years; responsible for coordinating, tracking, and documenting over $500K per cycle.

    • Planned Work Specialist,
      • Jan 2009 - Dec 2011

      Led planning and project management of select facility maintenance programs at Magic Kingdom. Developed, planned, and implemented projects utilizing external service providers, including scope definition and bid walks. Coordinated daily maintenance operations, comprised of job estimating, inventory control, labor and material cost control, and regulatory compliance.  Specialized in “fire drill” projects, requiring quick results under pressure.  Planned and scheduled work for all craft workers using Maximo and Primavera

    • Electrical & Mechanical Foreman
      • Mar 2004 - Jun 2009

      Oversaw team of 30 mechanical trade craft workers and led daily facility maintenance operations at EPCOT theme park, including purchasing and warehouse management. Coordinated and assisted with HVAC, plumbing, electrical, and kitchen system maintenance, repairs, and installations. Served as the point of contact for work orders; analyzed available resources, assigned work orders to technicians in the field, and generated required reports and documentation upon work order completion.  Received and managed 200+ new work orders per day.

    • Electrician / Foreman
      • Dec 2002 - Mar 2004

      Served as the Electrical Technician for the Engineering Services Department. Performed maintenance and service for all parking lot and external lighting, electrical distribution, air conditioning, gas heating, pumps and motors, commercial kitchen equipment, and commercial swimming pools. Received calls from guests with maintenance-related issues, and dispatched appropriate technicians to complete work orders.  Utilized and expanded expertise in electrical wiring and repair, plumbing, carpentry, and hazardous waste disposal.

    • United States
    • Construction
    • 700 & Above Employee
    • Electrician
      • Mar 1999 - Dec 2002

      Journeyman ElectricianTraveled extensively throughout the U.S. on six-month assignments to set up or shut down buildings. Performed troubleshooting and start-ups for power and generator distribution plants, installation of high-rise piping and raceway, supply and metering installations, and transformer and system distribution. Journeyman ElectricianTraveled extensively throughout the U.S. on six-month assignments to set up or shut down buildings. Performed troubleshooting and start-ups for power and generator distribution plants, installation of high-rise piping and raceway, supply and metering installations, and transformer and system distribution.

Education

  • Warren County Career Center
    Construction Trades, Electrician
    1996 - 1998

Community

You need to have a working account to view this content. Click here to join now