Nicholas Berrios, E.I.T.
Senior Project Engineer at Matrix New World Engineering- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
Topline Score
Bio
Credentials
-
Intern Engineer
New York State Education DepartmentMar, 2015- Nov, 2024
Experience
-
Matrix New World Engineering
-
United States
-
Civil Engineering
-
100 - 200 Employee
-
Senior Project Engineer
-
Jul 2021 - Present
NYS SPDES Construction Permitting: • Bay Park Conveyance Project Coordinated the preparation of twelve (12) Stormwater Pollution Prevention Plans in support of several design packages NYC DEP Stormwater Management Designed site improvements to incorporate Site Planning Practices, and designed Stormwater Management Practices to meet Unified Stormwater Rule. Designed storm and sanitary sewer service connections. • Scarangella Park • Lower Concourse Park • Box Street Park NYS SPDES Construction Permitting: • Bay Park Conveyance Project Coordinated the preparation of twelve (12) Stormwater Pollution Prevention Plans in support of several design packages NYC DEP Stormwater Management Designed site improvements to incorporate Site Planning Practices, and designed Stormwater Management Practices to meet Unified Stormwater Rule. Designed storm and sanitary sewer service connections. • Scarangella Park • Lower Concourse Park • Box Street Park
-
-
-
Colliers Engineering & Design
-
United States
-
Civil Engineering
-
700 & Above Employee
-
Senior Project Engineer
-
Jan 2020 - Jun 2021
-
-
-
Maser Consulting
-
United States
-
Civil Engineering
-
100 - 200 Employee
-
Senior Project Engineer
-
Jan 2020 - Feb 2021
-
-
Project Engineer
-
Jan 2019 - Jan 2020
-
-
Senior Engineer
-
Jan 2018 - Jan 2019
Dam Inspection:• Cooper River Parkway Dam - Emergency Dam RepairPrepared construction documentation in support of emergency repairs to tide gate system.• Pine Lake Dam InspectionPerformed regular dam inspection.Turf Field Design:• Madison Avenue Park Field ImprovementsDesigned turf field detention system.Culvert Analysis:• Melchor Tract ParkPerformed drainage area assessments and hydraulic design utilizing HydroCAD.Utility Relocation:• Piedmont Natural Gas - Various Pipeline RelocationsCoordinated with Oil & Gas Team to identify pipeline conflicts with roadway improvements and prepare construction documents of proposed pipeline relocations. Show less
-
-
Engineer
-
Jan 2016 - Dec 2017
Embankment Dam Rehabilitation:• Darlington Lake Dam Rehabilitation• Todd Lake Dam & Lake Tamarack Dam Rehabilitation• Gale Lake Dam RehabilitationDeveloped Hydrologic & Hydraulic Studies in support of NJDEP Bureau of Dam Safety Permit Applications. Performed drainage area assessments, hydraulic design of spillway structures, as well as riverine flood modeling across failure modes. Utilized ArcGIS, HEC-HMS, HEC-geoHMS, HEC-RAS, and HEC-geoRAS.Culvert Analysis:• Stouts School Road & Steely Hill Road Culvert RehabilitationPerformed drainage area assessments and hydraulic design utilizing HydroCAD.Site Inspections:• Toms River Regional School District Facility Condition AssessmentDirected inspection team evaluating condition of sites at all 26 schools in the District. Identified improvements at each site & prioritized recommendations with greatest added value across potential fiscal years. Show less
-
-
Education
-
Stevens Institute of Technology
Bachelor of Engineering, Civil Engineering