Nicholas Acquafredda

Project Management Intern at Lehrer Cumming
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Hoboken, New Jersey, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Management Intern
      • Jun 2021 - Present

    • Civic and Social Organizations
    • 1 - 100 Employee
    • Team Member
      • Sep 2020 - May 2021

      The community of Guayabitos, Bolivia located along the Pojo River experiences severe flash floods during the period from November to March. After any severe storm, the Pojo River is likely to flood, resulting in the community being unable to cross the river safely and access the health clinic and school for months each year. In order to solve this problem, our team, working with engineers from Thornton Tomasetti and Engineers in Action designed a pedestrian bridge that can withstand the storms and flooding as well as provide safe access across the river. The designed structure is a suspended pedestrian bridge with concrete abutments and gravity anchors on either side. Other design considerations included mitigating significant erosion on the bank of the river as well as utilizing locally sourced materials. The bridge design was also kept simple enough so the local community can assist in its construction. The pedestrian bridge can provide access to new markets and land that can help stimulate the local economy. Data from previous Engineers in Action projects show that local communities are expected to experience a 30% increase in labor market income and a 75% increase in farm profits.

    • United States
    • Higher Education
    • 700 & Above Employee
    • Team Member
      • Jan 2020 - May 2020

      3D Steel Truss Bridge • Designed and analyzed a steel truss railway bridge using Midas Civil and AutoCAD• Successfully worked with team without physical interaction due to pandemic 3D Steel Truss Bridge • Designed and analyzed a steel truss railway bridge using Midas Civil and AutoCAD• Successfully worked with team without physical interaction due to pandemic

    • Team Member
      • Jan 2019 - May 2019

      Crossover Speaker Network Project • Designed a working amplifier capable of amplifying noise using Simscape• Built amplifier on a breadboard using resistors, capacitors, and an oscilloscope Crossover Speaker Network Project • Designed a working amplifier capable of amplifying noise using Simscape• Built amplifier on a breadboard using resistors, capacitors, and an oscilloscope

    • Team Member
      • Sep 2018 - Nov 2018

      Truss Project • Designed a truss capable of withstanding 290 pounds of load using less than 60 inches of brass• Built truss using mechanical saw, belt sanders, soldering and gusset plates Truss Project • Designed a truss capable of withstanding 290 pounds of load using less than 60 inches of brass• Built truss using mechanical saw, belt sanders, soldering and gusset plates

    • Team Member
      • Jan 2018 - Apr 2018

      Weather Anemometer Project • Designed and built an Anemometer Weather System capable of accurately reading wind speed, humidity and temperature• Programmed device entirely in LabVIEW

    • Team Member
      • Sep 2017 - Dec 2017

      Robot Project • Built robot using mechanical saw, belt sander, and drill press and soldered electrical components • Programmed the robot to follow light emission and turn off the respective switches• Worked in a team environment, using project management skills

Education

  • Stevens Institute of Technology
    Bachelor's degree, Civil Engineering
    2017 - 2021

Community

You need to have a working account to view this content. Click here to join now