Neil Fulton

Project Electrical &Instrumentation Supervisor at Heathgate Resources
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Mining
    • 1 - 100 Employee
    • Project Electrical &Instrumentation Supervisor
      • Mar 2023 - Present

    • Project Electrical leading hand
      • Jan 2020 - Mar 2023

    • Project Electrical
      • Sep 2018 - Mar 2023

      Build of new well fields incorporating WiFi, PLC, Instrumentation into a 4g network

    • Australia
    • Engineering Services
    • 700 & Above Employee
    • E & I QA/QC Inspector
      • Apr 2017 - Aug 2018

    • Australia
    • Construction
    • 1 - 100 Employee
    • Electrician
      • Mar 2017 - Mar 2017

      construction CCPP power station Ichthys LNG project construction CCPP power station Ichthys LNG project

    • Australia
    • Mining
    • 1 - 100 Employee
    • Projects electrician
      • Dec 2016 - Feb 2017

      setting up wellfield field device power /control & Instrumentation setting up wellfield field device power /control & Instrumentation

    • Australia
    • Construction
    • 100 - 200 Employee
    • Electrician
      • Sep 2015 - Oct 2016

      Construction 500Mw power station Ichthys LNG Construction 500Mw power station Ichthys LNG

    • Australia
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Electrical Supervisor
      • Feb 2015 - May 2015

      APLNG & Roy Hill switchroom construction APLNG & Roy Hill switchroom construction

    • Ireland
    • Oil and Gas
    • 700 & Above Employee
    • Rig Electrician
      • Nov 2013 - Feb 2015

      NOV Ideal rig 1500HP Top drive 750,000 derrick, Amphion control with VDAQ, Pason, MD TOTCO. ABB VFD drives.. Maintenance/Breakdown of all Rig & camp equpment. Hazardous area, Instrumentation, communications, refridgeration & generating systems. NOV Ideal rig 1500HP Top drive 750,000 derrick, Amphion control with VDAQ, Pason, MD TOTCO. ABB VFD drives.. Maintenance/Breakdown of all Rig & camp equpment. Hazardous area, Instrumentation, communications, refridgeration & generating systems.

    • Electrical leading hand
      • Sep 2012 - Nov 2013

      Adelaide based construction of approximately 55 switch rooms for Origin Energy, for APLNG project in Queensland. Install, QA & commissioning of Coal seam gas switch rooms consisting of 1Mw water cooled VFD drives, communication equipments, HV/LV switchgear & Profibus PLC equipment. Adelaide based construction of approximately 55 switch rooms for Origin Energy, for APLNG project in Queensland. Install, QA & commissioning of Coal seam gas switch rooms consisting of 1Mw water cooled VFD drives, communication equipments, HV/LV switchgear & Profibus PLC equipment.

    • Electrical Project supervisor
      • Jan 2012 - Jul 2012

      1. Oversaw electrical installation of project – fixed price contract. 2. Liaising between CPG/contractor & Onesteel on project variables 3. Meeting critical commissioning targets to allow practical completion & sign off. 4. Ensuring electrical contractors followed all safety & welfare procedures 5. Quality control documentation & full commissioning of Allen Bradley SCR drives, Endress & Hausen Density, flow & level instrumentation. 1. Oversaw electrical installation of project – fixed price contract. 2. Liaising between CPG/contractor & Onesteel on project variables 3. Meeting critical commissioning targets to allow practical completion & sign off. 4. Ensuring electrical contractors followed all safety & welfare procedures 5. Quality control documentation & full commissioning of Allen Bradley SCR drives, Endress & Hausen Density, flow & level instrumentation.

    • Australia
    • Mining
    • 1 - 100 Employee
    • Projects electrician
      • Jun 2010 - Dec 2011

      1. Remote camp, FI/FO 2/1 roster 12 hr days. 2. Disconnections of Well head switch rooms & outlying equipment. 3. Wiring of Yokogawa DCS/PLC cabinets at remote sites. 4. Installation of tray/running of cables. 5. Wiring of flow & pressure transmitters, valves & Danfos VSD drives. 6. Installation of switch rooms/connection of small 500KVA generators. 1. Remote camp, FI/FO 2/1 roster 12 hr days. 2. Disconnections of Well head switch rooms & outlying equipment. 3. Wiring of Yokogawa DCS/PLC cabinets at remote sites. 4. Installation of tray/running of cables. 5. Wiring of flow & pressure transmitters, valves & Danfos VSD drives. 6. Installation of switch rooms/connection of small 500KVA generators.

    • United Arab Emirates
    • Engineering Services
    • 700 & Above Employee
    • Supervisor
      • Nov 2009 - Jul 2010

      1. Removal of 33KV switchgear & installation of 11KV switchgear & associated control wiring; being integrated into existing infrastructure on a 4MW diesel back up power station with CITEC control HMI. 2. Testing on main & control wiring – VLF, phasing & point to point. 3. Assist in commissioning of site HV network integrating the backup power station. 4. Setting up lockout isolations & issuing hot works/confined space permits to employees & contractors. 1. Removal of 33KV switchgear & installation of 11KV switchgear & associated control wiring; being integrated into existing infrastructure on a 4MW diesel back up power station with CITEC control HMI. 2. Testing on main & control wiring – VLF, phasing & point to point. 3. Assist in commissioning of site HV network integrating the backup power station. 4. Setting up lockout isolations & issuing hot works/confined space permits to employees & contractors.

    • United Arab Emirates
    • Engineering Services
    • 700 & Above Employee
    • leading hand
      • Mar 2009 - Sep 2009

      1. Installation of 3MW Diesel powered generating station for Aggreko 2. Supervision of trades in construction of 66-22KV open aerial substation. 3. Obtaining & issuing permits for things such as working at heights, hot work, isolations 4. Remote camp with 3/1, FI/FO roster 1. Installation of 3MW Diesel powered generating station for Aggreko 2. Supervision of trades in construction of 66-22KV open aerial substation. 3. Obtaining & issuing permits for things such as working at heights, hot work, isolations 4. Remote camp with 3/1, FI/FO roster

    • Australia
    • Mining
    • 700 & Above Employee
    • Supervisor
      • Feb 2008 - Mar 2009

      Remote site 8/6 roster. Copper & Gold mine, Green Field site, set up of maintenance systems, workshop & tooling. Crushing, Sag & Ball mill; 132/33/11Kv 415V systems Float & rougher circuit with Jameson cell and through to a Larox filter press Operating system is Rockwell RS logix with Citec Scada.HMI. Remote site 8/6 roster. Copper & Gold mine, Green Field site, set up of maintenance systems, workshop & tooling. Crushing, Sag & Ball mill; 132/33/11Kv 415V systems Float & rougher circuit with Jameson cell and through to a Larox filter press Operating system is Rockwell RS logix with Citec Scada.HMI.

    • Australia
    • Mining
    • 200 - 300 Employee
    • Supervisor
      • Jan 2002 - Jan 2008

      Ore processing Supervisor. 1 Overseeing running of electrical day shift, Instrumentation, High Voltage 33/6.6Kv (Reyrolle, Westinghouse), Refrigeration, Communications & contract shift group. 2 Asset planning on long/short term strategies/maintenance for foreseeable life of plant with assistance of outside specialists (Focus) for approximately 10 months. 3 Scoping & tendering small to medium size projects & maintenance contracts. 4 Writing Work instructions for safe electrical operation of plant & equipment. 5 Temporary higher duties of maintenance manager where required. 6 Training Production & trade personnel in electrical safety. 7 Isolation planner. 8 Isolation & lockout assessor. 9 Preparation & execution of yearly electrical budget costs in excess of $1M 10 Investigating Accidents/Incidents & implementing corrective actions. Show less

    • Supervisor
      • Jan 1990 - Jan 2001

      Maintenance to AC/DC machines, motors up to 5000hp,AC/ DC cranes up 150t, CNC up to 75' lathes, 6.6kv motors, lighting and small construction work. AC control systems DC control systems Germanium & silicon rectifiers. Trouble shooting Allen Bradley, GEC, Siemens and Reliance PLC’s. Basic Refrigeration, Communications, High Voltage Switching & Maintenance. Maintenance to AC/DC machines, motors up to 5000hp,AC/ DC cranes up 150t, CNC up to 75' lathes, 6.6kv motors, lighting and small construction work. AC control systems DC control systems Germanium & silicon rectifiers. Trouble shooting Allen Bradley, GEC, Siemens and Reliance PLC’s. Basic Refrigeration, Communications, High Voltage Switching & Maintenance.

Education

  • Edward John Eyre high school
  • volt edge

Community

You need to have a working account to view this content. Click here to join now