NEIL FLOUNDERS

Rigging Supervisor at CWind
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Hartlepool, England, United Kingdom, GB

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Lee Woollerton

Neil is a dedicated professional and a team player,alway's hard working and has all the attribute's needed to run a tower team or rigging team,he has the knowledge on which to draw from and work's in a safe manner,i would have no hesitation recommending Neil for any project being it renewable's or oil and gas related.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Sefety Diploma
    VCA
    Jan, 2010
    - Nov, 2024
  • Appointed Person Lifting Operations BS7121
    NPORS
    Jun, 2013
    - Nov, 2024
  • LOLER
    Inter Training
  • Lifting Supervisor
    ECITB
  • Lifting gear inspection
    ECITB
  • NVQ Level 3
    ECITB
  • OPITO Stage 3
    Sparrows
  • Rope Access Level 1
    irata international
  • lifting & slinging tecniches (level 3 -slinger banksman/rigger)
    kevin needham ltd. training and safty management.(through alstom)

Experience

    • United Kingdom
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Rigging Supervisor
      • Oct 2021 - Present

      cable pull in cable pull in

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Deck foreman / materials controller
      • Jun 2018 - Sep 2019

      Material controller BSP rejuvenation project Material controller BSP rejuvenation project

    • Netherlands
    • Staffing and Recruiting
    • 700 & Above Employee
    • Rigger
      • Jan 2018 - May 2018

      Pull in of cable on sub station. Following all procedures under company and HSE regulations. Assisting jointers putting cable into final position, use of rigging equipment and setting up pull points. All tasks completed within time scale and followed HSE rules. Pull in of cable on sub station. Following all procedures under company and HSE regulations. Assisting jointers putting cable into final position, use of rigging equipment and setting up pull points. All tasks completed within time scale and followed HSE rules.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Rigger
      • Sep 2017 - Nov 2017

      Various rigging duties and lifts carried out during planned shutdown. All planned and carried out to company standards, rules and regulations. All within time scale Various rigging duties and lifts carried out during planned shutdown. All planned and carried out to company standards, rules and regulations. All within time scale

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Deck crew
      • Mar 2017 - Jun 2017

      Various deck lifts carried out and lifts between vessel and platform , bunkering ops. All carried out under HSE rules and regulations with no incidents and within time scale.

    • Deck Foreman
      • Jun 2015 - Feb 2017

      Deck supervision of various lifting operations during Clair ridge hook up.

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Rigger
      • Nov 2014 - Jun 2015

      Flyndre cawdon project Flyndre cawdon project

    • United Kingdom
    • Professional Services
    • 700 & Above Employee
    • Rigger
      • Sep 2014 - Nov 2014

    • United States
    • Oil and Gas
    • 200 - 300 Employee
    • Deck Foreman
      • May 2014 - Aug 2014

      Placing PLEM & PCSS units subsea. Installation of subsea mooring system for tanker loading buoy. Installing power lines and flexible pipeline subsea. Project in china. Placing PLEM & PCSS units subsea. Installation of subsea mooring system for tanker loading buoy. Installing power lines and flexible pipeline subsea. Project in china.

    • Rigger
      • Jul 2012 - May 2014

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Rigger
      • Mar 2012 - Jul 2012

    • United Kingdom
    • Civil Engineering
    • 1 - 100 Employee
    • Tower Supervisor
      • Jan 2012 - Feb 2012

      Removal of old cable/installation of new cable for Wind Turbines.Work carried out whilst aboard DP Reel. Removal of old cable/installation of new cable for Wind Turbines.Work carried out whilst aboard DP Reel.

    • United Kingdom
    • Oil and Gas
    • 100 - 200 Employee
    • Rigger
      • Nov 2011 - Jan 2012

      Various Rigging & Crane duties carried out on the construction of the Apache platform. Installing pipework and steelwork, deck sections, tubular diagonal bracings for installation. Comply with Apache rules and site standards. Various Rigging & Crane duties carried out on the construction of the Apache platform. Installing pipework and steelwork, deck sections, tubular diagonal bracings for installation. Comply with Apache rules and site standards.

    • United Kingdom
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Deck Rigger
      • Aug 2011 - Nov 2011

      Various rigging duties carried out on ship’s deck whilst laying cables for wind farm project. Various rigging duties carried out on ship’s deck whilst laying cables for wind farm project.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Rigger
      • May 2011 - Jul 2011

      Various rigging duties carried out during planned outage.total strip down of turbine on power plant at mount isa. various repairs and total rebuild and alignment of machine. complyed with australian HSSE site standards. Various rigging duties carried out during planned outage.total strip down of turbine on power plant at mount isa. various repairs and total rebuild and alignment of machine. complyed with australian HSSE site standards.

    • Netherlands
    • Services for Renewable Energy
    • 700 & Above Employee
    • Rigger Supervisor
      • Aug 2010 - May 2011

      Various rigging duties carried out on cable laying barge whilst laying cable for wind turbines,also I.D. various rigging equipment to be ordered and used for cable pull in on tower's. Duties included over seeing safe pull in of cable as layed out in pull in plan, also directing rigging team during pull of cable.Comply with vessel HSSE goals and permit to work system. Various rigging duties carried out on cable laying barge whilst laying cable for wind turbines,also I.D. various rigging equipment to be ordered and used for cable pull in on tower's. Duties included over seeing safe pull in of cable as layed out in pull in plan, also directing rigging team during pull of cable.Comply with vessel HSSE goals and permit to work system.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Rigger
      • May 2010 - Jul 2010

      Various rigging duties carried out during planned shutdown.job involved overhaul of plant. various lifts with cranes. all work carried out under LOLER regulations. Various rigging duties carried out during planned shutdown.job involved overhaul of plant. various lifts with cranes. all work carried out under LOLER regulations.

    • Switzerland
    • Machinery Manufacturing
    • 700 & Above Employee
    • Lead Rigger
      • Apr 2010 - May 2010

      Various rigging duties carried out on oil filtering systems during planned shutdown.supervision on colum of lifts to various locations.inspection and I.D. of correct rigging equipment to be used. working under LOLER regulations. Various rigging duties carried out on oil filtering systems during planned shutdown.supervision on colum of lifts to various locations.inspection and I.D. of correct rigging equipment to be used. working under LOLER regulations.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Rigger
      • Jan 2010 - Mar 2010

      Full maintenance overhaul of steam turbine. Rotor change and structural modifications to steam turbine. Working under dutch safety - VCA - Regulations. various lifting procedures carried out with overhead cranes. Full maintenance overhaul of steam turbine. Rotor change and structural modifications to steam turbine. Working under dutch safety - VCA - Regulations. various lifting procedures carried out with overhead cranes.

    • Lifting Supervisor
      • Apr 2009 - Dec 2009

      Subcontracted to Siemans. Duties included supervision of wind farm components from port to offshore for erection. Supervision of staff whilst completing lifting operations under LOLER and CDM (Construction Design Management) regulations. Responsible for all work permits and lifting procedures Subcontracted to Siemans. Duties included supervision of wind farm components from port to offshore for erection. Supervision of staff whilst completing lifting operations under LOLER and CDM (Construction Design Management) regulations. Responsible for all work permits and lifting procedures

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Rigger
      • Feb 2009 - Apr 2009

      Maintenance and stator change during planned outage.Lifting and slinging techniques carried out under LOLER regulations. Maintenance and stator change during planned outage.Lifting and slinging techniques carried out under LOLER regulations.

    • Electric Power Generation
    • 700 & Above Employee
    • Rigger
      • Aug 2008 - Jan 2009

      Rigging and lifting techniques carried out with overhead crane, under LOLER regulations, whilst completing maintenance, and stator change on turbine in nuclear power station. Rigging and lifting techniques carried out with overhead crane, under LOLER regulations, whilst completing maintenance, and stator change on turbine in nuclear power station.

    • United Kingdom
    • Professional Services
    • 700 & Above Employee
    • Rigger
      • Jul 2008 - Aug 2008

      Rotor change on rig turbine during planned shutdown.All rigging work carried out under LOLER regulations and method statements. Work completed under set time scale. Rotor change on rig turbine during planned shutdown.All rigging work carried out under LOLER regulations and method statements. Work completed under set time scale.

    • Electric Power Generation
    • 700 & Above Employee
    • Rigger
      • Feb 2008 - Jun 2008

      Heavy lifts and various rigging duties carried out during planned outages. All work carried out under LOLER regulations. General maintainance and steelwork, pipework carried out to planned procedures. Heavy lifts and various rigging duties carried out during planned outages. All work carried out under LOLER regulations. General maintainance and steelwork, pipework carried out to planned procedures.

    • United Kingdom
    • Construction
    • 700 & Above Employee
    • Rigger / Chargehand
      • Nov 2007 - Feb 2008

      ECW project. Overseeing rigging team during installation of new cooling system. Permits in place , toolbox talks, and identifying rigging equipment to be used. Following LOLER regulations. ECW project. Overseeing rigging team during installation of new cooling system. Permits in place , toolbox talks, and identifying rigging equipment to be used. Following LOLER regulations.

    • Electric Power Generation
    • 700 & Above Employee
    • Rigger
      • Sep 2007 - Nov 2007

      General rigging duties carried out on turbines needing inspection,repair and maintenance. following manufacturer guidelines. General rigging duties carried out on turbines needing inspection,repair and maintenance. following manufacturer guidelines.

    • Rigger
      • Apr 2007 - Sep 2007

      Rigging duties carried out with rigging equipment and lift procedures whilst working with cranes. Construction of polyethylene plant on wilton, redcar. Rigging duties carried out with rigging equipment and lift procedures whilst working with cranes. Construction of polyethylene plant on wilton, redcar.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Rigger
      • Nov 2006 - Mar 2007

      Various rigging and slinging techniques carried out whilst building a gas storage unit. Erection of steelwork and lifting into position of storage tanks. Various rigging and slinging techniques carried out whilst building a gas storage unit. Erection of steelwork and lifting into position of storage tanks.

    • Electric Power Generation
    • 700 & Above Employee
    • Rigger
      • Oct 2005 - Nov 2006

      Various rigging and slinging techniques carried out during planned outages on various nuclear power stations throughout UK. Heavy lifting procedures also carried out on various power stations when required on turbines. Various rigging and slinging techniques carried out during planned outages on various nuclear power stations throughout UK. Heavy lifting procedures also carried out on various power stations when required on turbines.

    • United States
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Rigger
      • Sep 2005 - Oct 2005

      Rigging duties carried out during planned shutdown of plant. Installation of new pipework, valves and removal of old. Various lifting and slinging techniques carried out during shutdown. LOLER Rigging duties carried out during planned shutdown of plant. Installation of new pipework, valves and removal of old. Various lifting and slinging techniques carried out during shutdown. LOLER

    • Electric Power Generation
    • 700 & Above Employee
    • Rigger
      • Mar 2005 - Aug 2005

      Maintenance and repair of turbine during planned outages. Various lifting and slinging techniques carried out. Heavy lift plans also in place and carried out. Maintenance and repair of turbine during planned outages. Various lifting and slinging techniques carried out. Heavy lift plans also in place and carried out.

    • Switzerland
    • Machinery Manufacturing
    • 700 & Above Employee
    • Lead Rigger
      • Jan 2005 - Mar 2005

      Supervision of rigger's on filtering tower, lifting into position tray's and steelwork to replace old. ID of rigging equipment and position of cranes for lift tasks to be carried out, during planned shutdown. Supervision of rigger's on filtering tower, lifting into position tray's and steelwork to replace old. ID of rigging equipment and position of cranes for lift tasks to be carried out, during planned shutdown.

    • Electric Power Generation
    • 700 & Above Employee
    • Rigger
      • Aug 2004 - Nov 2004

      Various rigging and heavy lifts carried out during planned outages on turbines. Lifting and slinging techniques used with overhead cranes as per procedures. Various rigging and heavy lifts carried out during planned outages on turbines. Lifting and slinging techniques used with overhead cranes as per procedures.

    • United States
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Rigger
      • Jun 2004 - Aug 2004

      Part of a rigging maintenance team, called out for a emergency shutdown. Duties involved ID of rigging equipment needed to complete work scope on platform, replacement of 24 inch valve, and pipework. LOLER regulations. Part of a rigging maintenance team, called out for a emergency shutdown. Duties involved ID of rigging equipment needed to complete work scope on platform, replacement of 24 inch valve, and pipework. LOLER regulations.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Rigger
      • Feb 2001 - Jun 2004

      Rigging, slinging and lifting techniques carried out whilst replacing oil filtering trays in tower's with new trays. Duties involved rigging equipment inside tower's to remove and install tray's. Also positioning cranes next to tower's. Rigging, slinging and lifting techniques carried out whilst replacing oil filtering trays in tower's with new trays. Duties involved rigging equipment inside tower's to remove and install tray's. Also positioning cranes next to tower's.

Community

You need to have a working account to view this content. Click here to join now