Neel Trivedi

Senior Site Engineer - Projects at NOVAVAX INC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Gaithersburg, Maryland, United States, US
Languages
  • English Full professional proficiency
  • Gujarati Full professional proficiency
  • Hindi Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • BIM Manager: Managing Revit
    LinkedIn
    Feb, 2022
    - Nov, 2024
  • Revit 2020: Essential Training for MEP (Imperial)
    LinkedIn
    Feb, 2022
    - Nov, 2024
  • Certification in Project Management
    Larsen & Toubro
    Sep, 2021
    - Nov, 2024
  • Certificate course in Masters of Business Administration (Project & Quality Management)
    Indian Business Management School
    Jun, 2013
    - Nov, 2024
  • Plant Design System
    Design Technologies
    Dec, 2008
    - Nov, 2024

Experience

    • United States
    • Pharmaceutical Manufacturing
    • 700 & Above Employee
    • Senior Site Engineer - Projects
      • Mar 2022 - Present

      1) Facilitate and lead site engineering projects relating to new or upgraded equipment, processes, facilities, site operational initiatives, site compliance and quality initiatives, analyzing and remediating equipment and utility issues.2 )Oversee the Drawing Management Program, including CAD Files for all building construction, Controlled Drawlings, GMP Drawings and Drawing Schematics.3) Ensure that all appropriate Documentation and Drawing Specifications are generated in compliance with Novavax’s procedures and statutory requirements.4) Act as a site engineering lead for project support. Including, Site Engineers, Manufacturing Operation Groups, Facilities and Lab Operations.5) Act as the technical point of contact/subject matter expert for cGMP and non-GMP facilities equipment and systems. This includes HVAC, process gases, cooling and heating systems, electrical systems, etc.6) Develop Standard Operating Procedures (SOPs) and Change Controls pertaining to setup, maintenance, and operation of equipment, facility, and utilities.7) Leads cross-functional teams with contractors, customers, and vendors to successfully execute disruptive construction projects in labs/buildings. Planning, construction, and validation of state-of-the-art, multi-modular flex lab/contract development and manufacturing organization (CDMO). Experience Managing Air Systems, HVAC and Clean Dry Air (CDA) Generator.8) Ensure project requirements embrace and meet current GMP, GLP, and EHS standards and practices.9) Support Facilities and Engineering project activities including assisting in the development of user requirement specifications, FAT, SAT, and commissioning/validation.

    • India
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Lead Project Engineer
      • Jan 2018 - Feb 2019

      Onsite at Client: Procter & Gamble Home Products Ltd.1) Technical and cost proposal development with preparing scope understanding document for Asbuilting, performing fieldwork necessary to gather field data.2) Measurements, check tie-ins, Field Verifying & Ensuring conformity of Piping Systems at site with the existing inputs (P&IDs, drawings, specifications, Isometric Drawings etc.).3) As building the P&ID & Isometrics from Field Verified Redline Markups by applying Design Standards & Guidelines for updating Drawings in CAD.4) Providing collected measured data inputs to offshore engineering team for further with updating in 2D/3D Model. Final drawings, BOM preparation review as per as-built data.5) Analyzed blueprints and delivered concise instructions to technical team to maintain quality control.6) Maintained records of cost and quantity information for the Project. Identified and mitigated technical risks within projects. Interfacing with different client stakeholders.7) Evaluated change order requests in response to out-of-scope work activities and developing field conditions. Achieved big success in removal of 8% unutilized Field Equipments.

    • Project Lead
      • Jun 2015 - Dec 2017

      Client : Hess Corporation.( Projects handled for locations globally. Were also at Onsite Seminole, TX,USA)1) Leading as a part of delivery of major packages on the project in terms of document reviews, technical query management, interface management, Quality management 2) Managing scope, budget and schedule for FEED, detailed design, bid and IFC packages.3) Responsible for directing, supervising, and controlling the execution of the technical, fiscal, and administrative functions of the project.4) Development of Piping Engineering deliverables.5) Vendor Management, Equipment Selection, RFQ & Floating inquiry.6) Materials Management, Spare parts Management.7) Interaction with client and other groups/departments working on the project.8) Quality Control and Validation of various process complying with client.9) Identified innovative and automated approaches to routine tasks, making suggestions that were widely received.10) Managed minimum of 2 projects each year while maintaining adherence to budget, schedule and scope requirements.11) Closely collaborated with project members to identify and quickly address problems.12) Gathered requirements, defined scopes, allocated resources and established schedules meeting or exceeding project demands.13) Managed and motivated project teams to promote collaboration and keep members on-task and productive.14) Produced reports and updated customers and senior leaders on progress and roadblocks. Reports also included Account Progress Status Review (APSR).15) Enforced alignment of project strategy with business objectives and made modifications to promote efficient project completion.

    • Senior Engineer
      • Jul 2011 - May 2015

      Was involved in a Greenfield Capital Project having overall value 28Mn USD starting from FEED to Construction/ Startup support from Office as well as Onsite location.Engineering:1) Development of Scope Understanding Document as per Client & Interdisciplinary inputs.2) Development of Piping Engineering deliverables as per Reference P&IDs and Inputs.Layout Engineering, 3D Model reviews for clashes check & updating3) Material Take Offs (MTO) for procurement (+/-10% EPCM estimate).4) Stage gates IFR, IFB and IFC packages development.5) Vendor Coordination, RFQ preparation and floating, Equipment selection and vendor analysis, Contractor bid evaluation.6) Design Deliverables review to the appropriate level compliance with all relevant engineering standards and internal procedures.Procurement, Construction, Startup:1) Integrates various Engineering, scheduling, purchasing, Construction, and start-up aspects. 2) Interface for Process & Utilities & Piping Services Installation A.G & U.G. lines, Building Facilities from Mechanical.3) Customer Review Meetings, timely resolution of Technical Queries, Non-Conformity reports and Change/Deviation requests issued by subcontractors to achieve client technical standards.4) Review of IFC drawings and documents for any site interferences, constructability requirements and update accordingly.5) Approval of Contractor provided Technical Datasheets assuring design compliance.6) Develop S.O.P and Change Controls pertaining to setup, maintenance, and operation of equipment, facility and utilities.7) Report all delays / technical issues / discrepancies to project and advise/recommend remedial solutions through all phases of the project life cycle.8) Interfacing with Site Engineers, Manufacturing Operation Groups, Facilities and Lab Operations.Technical support during Installation, Commissioning & Startups.9) Review, approve/reject, and track all field installation changes. Project closure books following As-builts.

    • United States
    • Mechanical Or Industrial Engineering
    • 1 - 100 Employee
    • Executive (Design)
      • May 2010 - Jul 2011

      Design & upgrade of existing designs & detail engineering of Plant process piping systems, Equipment's. Drawings Review, 3D Modelling in Inventor, Conceptual and detail layout preparations.Piping Isometrics generation and Material Take Off. Design & upgrade of existing designs & detail engineering of Plant process piping systems, Equipment's. Drawings Review, 3D Modelling in Inventor, Conceptual and detail layout preparations.Piping Isometrics generation and Material Take Off.

    • Chemical Manufacturing
    • 200 - 300 Employee
    • Mechanical Engineer
      • Apr 2009 - Apr 2010

      Project Engineering Procurement Engineering,Mechanical Integrity/Plant Maintenance Material Management, Installation & Commissioning SupportVendors & Contractors ManagementDrawing Verifications and reviews Project Engineering Procurement Engineering,Mechanical Integrity/Plant Maintenance Material Management, Installation & Commissioning SupportVendors & Contractors ManagementDrawing Verifications and reviews

    • India
    • Oil and Gas
    • 700 & Above Employee
    • Junior Engineer Piping
      • Sep 2007 - Apr 2009

      Focused on Piping Isometrics, Line list specifications and BOM for Site Erection & Shop Fabrication.Complete Piping Material Specifications & Selections. Spools generation & weld details marking.Worked with the Client engineers on issues ranging from piping materials and components, design basis of components to ensure that the piping code regulations are followed in the material specs.Preparing various project specific specifications for fabrication and erection, testing of valves, painting preparation and others.

Education

  • Veer Narmad South Gujarat University, Surat
    Bachelor of Engineering - BE, Mechanical
    2003 - 2007
  • Silver Bells Higher Secondary School
    Higher Secondary School, Science
    2001 - 2003
  • KPES HIGH SCHOOL
    Secondary Education board, all subjects
    1998 - 2001
  • KPES Primary School
    -

Community

You need to have a working account to view this content. Click here to join now