Nato Loock

at ZZ2
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Tzaneen, Limpopo, South Africa, ZA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • South Africa
    • Food and Beverage Manufacturing
    • 100 - 200 Employee
      • Jan 2023 - Present

      • Feb 2017 - Present

      ZZ2 is one of the largest agricultural companies in South Africa cultivating, packaging & marketing various crops, from tomatoes, avocados, cherries, blueberries, apples to dates | www.zz2.co.zaTasked with the design of irrigation systems including small holding dams, pump stations, water supply pipelines & automation systems.Responsible for preparing reports, sketches, working drawings, specifications, proposals & budgets for proposed sites & systems.Tasked with designing agricultural machinery components & equipment, using CAD.Responsible for project planning, costing & coordinating, directing & instructing maintenance teams.Developing solutions to unforeseen engineering project problems & making the necessary changes as needed.Liaising with clients, contractors, consultants & other engineers to evaluate proposed plans & feasibility thereof as well as communicating technical information during project phases.Tasked with farm infrastructure maintenance including pumps, pipelines, filters, general irrigation equipment.Generating project status reports, instruction documents, maintenance logs & project completion reports. Show less

      • Nov 2020 - Present

      I am responsible for managing and coordinating the Mechatronics & Instrumentation worskhop, responsible for all automation projects within the company. Responsibilities include the maintenance and installation of automation and monitoring systems. Type of systems include low frequency radio & IIOT (Industrial Internet of Things) systems. Also assist in the design and in-house development of IIOT modular devices to suite the companies needs.I am also tasked and contributed greatly towards the optimization of existing telemetry systems. Show less

    • Switzerland
    • Mining
    • 700 & Above Employee
      • Sep 2015 - Jan 2017

      Glencore Lion Smelter falls under the Glencore group & is in the business of ferrochrome production for the steel industry | www.glencore.comI was promoted to an Engineering Superintendent at the Furnace department. I was responsible for ensuring 100% plant availability of the two 60 MW furnaces and its auxiliary equipment. I had 2 mechanical coordinators, and electrical coordinator, and instrumentation coordinator that reported to me. Each of these coordinators had their own team of artisans that reported to them, but I formed part of their line management.• Ensuring 100% plant availability• Ensuring Health & Safety requirements are adhered to• Planned maintenance• Plant optimization• Budgeting and cost control• CAPEX Show less

      • Dec 2014 - Sep 2015

      I was promoted to an Engineering Coordinator in charge of the fabrication workshop which consisted of a boiler workshop and machining shop. I was also in charge of a 50 Ton mobile crane which was used throughout the plant. I had 8 boilermakers & their assistants, 2 fitter & turners, 2 mobile crane operators & 1 spray painter that reported to me. I reported directly to the Engineering Manager.• Tasked with determining material requirements, costing and ordering for fabrication work.• Planning and coordinating workload.• Ensuring Health & Safety requirements are met at all time.• Ensuring quality of work.• Refurbishment work of plant equipment done in time for planned shutdowns. Show less

      • Jan 2014 - Dec 2014

      I was fortunate enough to receive a bursary from Glencore in my final year of studies and was obligated to work back one full year. In my first year at Lion Smelter I was appointed as an engineer in training and circulated through the various sections of the plant in order to become familiar with the process. In this period, I spent majority of my time in the final product area as well as the furnace department.• Tasked with the commissioning of the new pre-breaking and crusher tie in section at the final product plant.• Planning and performing shutdowns to carry out preventative maintenance work.• Fault finding and attending to breakdowns Show less

Education

  • North-West University / Noordwes-Universiteit
    Bachelor of Engineering (B.Eng.), Mechanical Engineering
    2010 - 2013

Community

You need to have a working account to view this content. Click here to join now