Nathanaël Profichet
Directeur de Travaux Pluridisciplinaire at HYDRO Exploitation SA- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
HYDRO Exploitation SA
-
Switzerland
-
Renewable Energy Semiconductor Manufacturing
-
100 - 200 Employee
-
Directeur de Travaux Pluridisciplinaire
-
May 2021 - Present
Sion, Valais, Suisse
-
-
-
Ponticelli Suisse
-
Switzerland
-
Construction
-
1 - 100 Employee
-
Chargé D'affaires
-
Apr 2019 - Apr 2021
Collombey-Muraz (Valais, Suisse) Chargé D'affaires Tuyauterie Industriel Chez Valtube Nous intervenons sur l'ensemble de la Suisse Romande, et de l'Ouest, sur des affaires de tuyauteries industrielles, pour nos clients œuvrant dans les domaines de la pétro-chimie, la pharmaceutique et l'agro-alimentaire.
-
-
-
Groupe Ponticelli Frères
-
Oil and Gas
-
700 & Above Employee
-
Chef de projet
-
Oct 2018 - Mar 2019
Chalampé Mission d'optimisation logistique de la structure métallique au sein du projet Atlas sur le site Butachimie à Chalampé. Suite à un audit de la situation logistique du matériel intégrable pour la structure métallique du projet, nous avons proposé puis mis en place une équipe de 10 personnes pour ré-organiser le parc de structure. Afin d'assurer un suivi et une optimisation de la logistique, nous avons mis implémenté un système de suivi via barre codage et tablette ATEX. Ce suivi à… Show more Mission d'optimisation logistique de la structure métallique au sein du projet Atlas sur le site Butachimie à Chalampé. Suite à un audit de la situation logistique du matériel intégrable pour la structure métallique du projet, nous avons proposé puis mis en place une équipe de 10 personnes pour ré-organiser le parc de structure. Afin d'assurer un suivi et une optimisation de la logistique, nous avons mis implémenté un système de suivi via barre codage et tablette ATEX. Ce suivi à permis de connaitre le statut du matériel en continue, et ainsi de diriger la construction en fonction de l'adéquation des priorités projet et de la disponibilité matériel.
-
-
Fiel Engineer - Biogen Next Generation Manufacturing Project
-
Jan 2017 - Sep 2018
Luterbach, Suisse Achievements for the BMC1 & WH projects : - Very large construction volume, 12 main areas to manage in same time, 2 different Clients, - Construction done with Time Schecule constraints and hight level of coactivity, - Successfull tests Management, Successfull punch list Management, - Very low rate of comments concerning finalization, - Project financially balanced despite difficulties, The BIOGEN project of Lutherbach is a major investment in advanced biopharmaceutical… Show more Achievements for the BMC1 & WH projects : - Very large construction volume, 12 main areas to manage in same time, 2 different Clients, - Construction done with Time Schecule constraints and hight level of coactivity, - Successfull tests Management, Successfull punch list Management, - Very low rate of comments concerning finalization, - Project financially balanced despite difficulties, The BIOGEN project of Lutherbach is a major investment in advanced biopharmaceutical technologies to produce new medicines for Alzheimer's disease. The project is a green field project started in 2015 with an objective of production in 2020. The project consists of 3 main areas, BMC1, BMC2, warehouse and CUB utilities. The challenge was to build a new facility as a fast track project. I was responsible for installation of all the black piping in the BMC1, BMC2 and warehouse buildings. As field Engineer, I was in charge of the coordination and supervision of our subcontractors and workers (350 blue collar), taking care construction technical issue resolution, and,extra cost follow up (CO preparation with contract team).
-
-
Planning Engineer Offshore- Projet Moho 1bis
-
May 2014 - Dec 2016
Congo -Offshore construction Planning -Offshore construction Reporting -Progress Follow-up -Manpower Follow-up -Project Procedure Development
-
-
Planning Engineer Offshore- Projet CTI3
-
Dec 2013 - Apr 2014
Gabon -Offshore construction Planning -Offshore construction Reporting -Progress Follow-up -Manpower Follow-up
-
-
-
Alstom Power
-
Electric Power Generation
-
700 & Above Employee
-
CMS Engineer/ Site Planner / Main Cooling Water Pipe Supervisor
-
Dec 2011 - Nov 2013
CFB Power Plant 300MW, Narva Estonia - Progress follow-up on site - Site time-schedule development - Supervisor for installation of GRP Main Cooling Water Pipes
-
-
-
Framatome
-
France
-
Nuclear Electric Power Generation
-
700 & Above Employee
-
Deputy to the Civil Work Design Coordinator on behalf Taïshan EPR Project (InternShip)
-
Mar 2011 - Sep 2011
Paris La Défense - Follow-up of the drawings issuance by the sub-contractors - Cost-control of the changes - Customers and sub-contractors liaison
-
-
-
Eurovia
-
France
-
Construction
-
700 & Above Employee
-
Foreman (Internship)
-
Jun 2010 - Sep 2010
Evian les Bains
-
-
-
-
Stagiaire
-
2009 - 2009
-
-
Stagiaire
-
2009 - 2009
-
-
Education
-
Ecole spéciale des Travaux publics, du Bâtiment et de l'Industrie
Diplôme d'ingénieur - Master Degree, Travaux Publics - Civil Engineering -
Université de Genève
MOOC, Climate Change and Water in Mountains: A Global Concern -
Lycée Charlemagne Paris 4
Classe Préparatoire aux Grandes Ecoles D'ingénieur, Mathématiques, Physique, Chimie -
Lycée Passy Saint Nicolas Buzenval Rueil Malmai
Baccalauréat Scientifique Option Physique Chimie -
Lycée Français Gustave Flaubert Tunisie
Brevet des collèges