Nathanael Anton
Construction Manager at PFEIFER Structures- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PFEIFER Structures
-
Germany
-
Construction
-
1 - 100 Employee
-
Construction Manager
-
May 2023 - Present
HSV Volksparkstadium Hamburg, in Germany 🇩🇪 modernisation & renovation of the Stadium Roof HSV Volksparkstadium Hamburg, in Germany 🇩🇪 modernisation & renovation of the Stadium Roof
-
-
-
Construction and Engineering Management
-
Munich, Bavaria, Germany
-
Construction and Engineering Management
-
Nov 2022 - Present
Freelance Engineer with a demonstrated history of working under high pressure in large-scale projects. Hands-on Engineer, with skilled experience from installer, to supervisor, and management. Highly experienced in lightweight and special structures, with different international regulations from EU & Asia Freelance Engineer with a demonstrated history of working under high pressure in large-scale projects. Hands-on Engineer, with skilled experience from installer, to supervisor, and management. Highly experienced in lightweight and special structures, with different international regulations from EU & Asia
-
-
-
Wendt-Noise Control GmbH
-
Germany
-
1 - 100 Employee
-
Construction Manager for the TRAILBLAZER Hydrogen Power Plant | Acoustic Enclousure and HVAC
-
Jan 2023 - May 2023
Built the Acoustic Enclosure with HVAC Systems for the TRAILBLAZER Hydrogen Power Plant. Trailblazer 20-MW-Elektrolyse-Anlage Protonen-Exchange-Membran (PEM)-Elektrolyseur Built the Acoustic Enclosure with HVAC Systems for the TRAILBLAZER Hydrogen Power Plant. Trailblazer 20-MW-Elektrolyse-Anlage Protonen-Exchange-Membran (PEM)-Elektrolyseur
-
-
-
-
Sabattical Leave.
-
Jan 2022 - Oct 2022
-
-
-
PFEIFER Structures
-
Germany
-
Construction
-
1 - 100 Employee
-
Engineering & Installation Manager
-
Jun 2019 - Dec 2021
South East Asia: Built the largest Aviary Bird Park in Asia 4 Aviaries & 1 Amphitheater • over 100pcs 30m Steel Columns• almost 800 Steel Cables in all different diameters and types • over 200 SUS Mesh Panels in small and XXL (>1000m²), in total more than 100,000m² • PTFE Membrane Roof for the Amphitheater Built the largest Aviary Bird Park in Asia. My tasks were not only limited to engineering coordination and the planning process of the installation. I also spent a long time on site to install the first cables and the largest ever produced Stainless Steel meshes with special air rigging techniques. The task required lifting XXL meshes over existing trees (up to 30m high) in the jungle. Due to extreme limited access requirements, it was only possible to lift with portable winches and access the structure through Rope Access. Training the local teams in special installing and lifting techniques, as well as in understanding LIGHTWEIGHT Structure were parts of my responsibilities. Beside the Bird Park: Pre-Construction of LIGHTWEIGHT Structures for Sales in Southeast Asia. This involved amongst others:• Form Finding of Membrane Structures• Structural Analysis for the Pre-Construction phase• Feasibility Studies• Installation Concepts / Method Statements and Risk Assessments• Inspection and Test Plans• Maintenance Manuals• Cost Analysis, Estimations and Savings Show less
-
-
Construction Manager for the Al Janoub Stadium | Retractable Stadium Roof
-
Nov 2017 - Jun 2019
Al Janoub Stadium | Retractable Stadium Roof• 10,800 m² Fully Automated Retractable Roof• main dimensions 170 x 93m• deployment time: 30minWorking in extreme conditions of Katari summer and 'winter' ensuring 100% safe working for our on-site team. The challenges were hard but could be managed due to close coordination with all trades. Aiming for the best possible solutions for our installation, we used Rope Access and complex lifting techniques where necessary. For example, we winched two 11ton PVC Membranes (45m long rolled sausages) 50 meters high before transferring it horizontally into the garages onto a suspended safety net which were connected to our steel cables. The planning and execution of the whole installation were my full responsibility. Thinking outside the box, coordinating all stakeholders and ensuring a strong motivation on site were great tasks which I enjoyed to fulfill. Beside the Al Janoub Stadium, I was involved in: • maintenance and handover of the Mushaireb Retractable Roof • the handover of the Mushaireb Balustrades and Canopies • the initial support for winning the 3rd stadium roof in Qatar, the Al Thumama Stadium• the first contact and initial coordination for a new retractable roof in Doha which is currently under construction (2022)#roadto2022#PFEIFERStructures#movableStructures Show less
-
-
-
Montageservice LB GmbH
-
Rottweil
-
Quality Management and Deputy Construction Manager for the Thyssenkrupp Test Tower | PTFE Facade
-
May 2017 - Oct 2017
One of Germanies highest Structures, the ThyssenKrupp Test Tower in Rottweil, Germany • On-site Quality management for the assembly of external PTFE membrane facade and steel structure • Deputy Construction Manager • Control and enhancing of work processes on site • Quality control of material and assembly from 246m to 0m height • Working hand in hand with Taiyo Europe Starting with the QA/QC, I developed fast into taking over more responsibilities. Instead of ‘just sitting in the office’, I started to climb the structure for detailed checks, took over small teams for quality assurance and developed installation concepts. After a couple of month, I worked as deputy construction manager. Ensuring the safety on a very limited working platform in extreme height, while lifting and installing heavy steel beams next to hundreds of visitors were a great challenge. Show less
-
-
-
World Traveller Ltd
-
United Kingdom
-
1 - 100 Employee
-
travelling Southeast Asia and Australia
-
Sep 2016 - Apr 2017
-
-
-
IF-Ingenieure fuer Flaechentragwerke GmbH
-
Germany
-
Architecture and Planning
-
1 - 100 Employee
-
Structural Design Engineer
-
Jun 2014 - Aug 2016
• design of cable structures, membrane structures (PTFE, ETFE, PVC), glass facades, steel structures • structural analysis i.e. with finite element modelling • installation support • 3d modelling with Computer-Aided Design • workshop drawings • form finding for freeform structures • Master Thesis at the Univerity for applied science Konstanz (Germany) in collaboration with Ingenieure für Flächentragwerke GmbH – Theme: investigating the influence of the glazing on the deformation and stresses of the cable net structure. As an example of practice on the People Mover Tram Station in Doha, Qatar (german Title "Einflüsse der Glaseindeckung auf die Verformungen und Schnittgrößen einer Seilnetzkonstruktion - am Beispiel der People Mover Tram Station in Doha") Show less
-
-
-
formTL ingenieure für tragwerk und leichtbau gmbh
-
Germany
-
Architecture and Planning
-
1 - 100 Employee
-
Structural Design Engineer (Internship)
-
Mar 2014 - May 2014
• studying and deepen knowledge of ETFE /PTFE/PVC membrane structures, cable structures and aluminium structures • designing ETFE cushion roof for tendering • conference about fibre composite components in the construction industry, Switzerland • studying and deepen knowledge of ETFE /PTFE/PVC membrane structures, cable structures and aluminium structures • designing ETFE cushion roof for tendering • conference about fibre composite components in the construction industry, Switzerland
-
-
-
Pfeifer Ingenieure GmbH
-
Germany
-
Structural Design Engineer
-
Feb 2012 - Feb 2014
• membrane structures with steel mesh membranes, cable structures and steel structures • structural analysis • standardise the use of Inventor • enhancing internal planing processes • bachelor thesis; calculation and designing of a steel tower with pre-tensioned cables + investigating of the dynamic wind influence on cables • membrane structures with steel mesh membranes, cable structures and steel structures • structural analysis • standardise the use of Inventor • enhancing internal planing processes • bachelor thesis; calculation and designing of a steel tower with pre-tensioned cables + investigating of the dynamic wind influence on cables
-
-
-
H.Wetter Ag
-
Stetten (Switzeland)
-
Structural Engineer (Internship)
-
Feb 2011 - Aug 2011
• steel structures • structural analysis • cost calculations for the tender process • worked in the steel manufacture (3 weeks) • installation of a suspension bridge (3 weeks) • steel structures • structural analysis • cost calculations for the tender process • worked in the steel manufacture (3 weeks) • installation of a suspension bridge (3 weeks)
-
-
Education
-
Fachhochschule Konstanz - Hochschule für Technik, Wirtschaft und Gestaltung
Master, Civil Engineer - major in Structural Design Engineering