Nat Delgado, BS Eng (Elec), REE, PMP

President/Chief Executive Officer at Ecosystem Technologies International, Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Metro Manila, National Capital Region, Philippines, PH
Languages
  • English Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Philippines
    • Environmental Services
    • 1 - 100 Employee
    • President/Chief Executive Officer
      • Sep 2019 - Present

      Working at Ecosystem Technologies International, Inc. (ESTII), a subsidiary of Metro Pacific Investments Corporation (MPIC) from September, 2019 up to present, currently a board director, President & CEO of this company. ESTII is a subsidiary of Metro Pacific Water (MPW)/Metro Pacific Investments Corporation (MPIC) where the company’s core business is in wastewater/water treatment management (WWT), EPC contractor in WWT & manage WWT operations and maintenance. Working at Ecosystem Technologies International, Inc. (ESTII), a subsidiary of Metro Pacific Investments Corporation (MPIC) from September, 2019 up to present, currently a board director, President & CEO of this company. ESTII is a subsidiary of Metro Pacific Water (MPW)/Metro Pacific Investments Corporation (MPIC) where the company’s core business is in wastewater/water treatment management (WWT), EPC contractor in WWT & manage WWT operations and maintenance.

    • United States
    • Construction
    • 700 & Above Employee
    • Project Manager/Director
      • Sep 2015 - Sep 2019

      Singapore Liquefied Natural Gas, SLNG Phase 3 Project, Singapore, September, 2015 till present, currently assigned as Project Manager for the detailed engineering of SLNG phase 3 facilities expansion (9 MTPA NG send-out) in Jurong Island, Singapore. SLNG (Singapore government owned company) is the owner of the regasification plant and the EPC contractor is Samsung and Fluor is contracted to do the engineering, this is through a Lump-sum contract. The total cost of the project expansion is at U$ 600M. I am responsible for the profitability of the project & in charge of delivering the scope of work of the project.Currently at the jobsite to support Mechanical Completion Plant Start-up of the project.

    • Project Manager/Director
      • Mar 2018 - Jul 2019

      FGEN LNG Terminal, Batangas City, Philippines January, 2018 till present, currentlyassigned as Project Manager and Engineering Manager of ECI phase (Design Competition andFEED Enhancement). The owner of the plant is FirstGen LNG Corporation. The FGEN LNGterminal will be developed in 2 phases, phase 1 and Phase 2. Fluor will venture on phase 1 andthe maximum send-out capacity is at 5.26MTPA which includes truck loading and a provision ofreloading to LNG carriers. The team is in preparation when the project transition to EPC in early2019.

    • Engineering Manager
      • Aug 2014 - Aug 2015

      Currently assigned as engineering manager for the detailed engineering of SLNG phase 3 facilities expansion (9 MTPA NG sendout) in Jurong Island, Singapore. As engineering manager, in charge of Fluor engineering execution & point person with the client. Responsible in delivering quality deliverables, within budget & timely issuance.

    • Project Engineering Manager
      • Mar 2014 - Jul 2014

      Assigned in Manila supporting engineering management. In charge of engineering disciplines - Electrical, Control Systems & Piping. Direct coordination with the client with regards to technical issues arising in the design development. Facilitating inter-discipline coordination in design reviews. Helping support fulfill project milestones. Involved in technical bid evaluation of proposals of sub-contractor bidders in construction. This is a chemical project that will have an end-product of aroma chemicals, raw materials for food/beverages & sanitary/beauty products.

    • Field Engineering Manager/Enginering Manager
      • Jan 2010 - Feb 2014

      Was assigned as site engineering manager in the Jurong Island of Singapore supporting engineering durin construction of Phase 1/1B of the Singapore Liquefied Natural Gas Regasification plant. Fluor is the engineering contractor of the balance of plant outside the LNG tanks. Major equipment in the SLNG plant are BOG compressors, Open Rack Vaporizers, Submerged Combustion Vaporizer, LNG Pumps and Utility facility/Equipment. Assigned as engineering manager for the detailed engineering phase of the 6 MTYA LNG facilities in Jurong Island, Singapore. SLNG is the owner of the regasification plant and the EPC contractor is Samsung and is contracted to do the detailed engineering, this is through a Lump-sum contract. Leading engineers across disciplines for the design and engineering. Was one of the focal persons in Engineering, interface with the client, interface with the vendor/supplier, procurement interface and support construction. Also supported the client in developing the project specification. The mechanical completion of the project will be in year 2013. For this project, attended in Houston to participate in the kick-off of the project and equally important was aligning the needs and expectation of the client.

    • Engineering Project Manager
      • Mar 2009 - Jan 2010

      Assigned in Tuas, Singapore, previously handled the post Project Engineering Manager for Electrical, Instrumentation and Automation at the REC Site in Tuas South, Singapore as Project Engineering Manager for Electrical, Instrumentation and Automation. Was supporting the construction with regards to engineering needs, request for information, vendor coordination and sub-contractor coordination. Was also responsible in supervising engineering leads of Instrumentation, Auxiliary Systems, Electrical and Automation. Also assigned to help manage the control systems integrator to be on schedule & meet the requirements, helped to resolve needs/issues and helped manage their scope. Although the project schedule is so aggressive, the project team still managed to be on schedule.

    • Project Engineer
      • Aug 2008 - Feb 2009

      Assigned as the project engineer in REC project in Singapore. This particular REC plant will manufacture solar cells. The project is a worksharing execution with the Singapore office. Fluor scope is the B&I (building and infrastructure). Responsible for interfacing with the process units EPCM contractors of the project. Responsible in coordinating the engineering needs of the Manila engineering team to the home-office (Singapore). Responsible interfacing with the priority engineering needs of construction and fabrication.

    • Project Management Support
      • Jul 2008 - Sep 2008

      Assigned in Habshan 5 project providing project management oversight for the Manila scope supporting the LSTK proposal of the Habshan 5 project of Gasco in Abu Dhabi. This Gasco project will increase the gas offshore production. The estimated total indicated cost of the project is at $4B to $5B as lump sum type contract. Responsible in leading the Manila team for developing the material-take-off for the process units and systems (TGTU, SRU, Interconnecting piperack and Flare). The deliverables was used by the proposal team (Abu Dhabi, Camberly and Houston) for the bid.

    • Project Engineer
      • Dec 2007 - Jul 2008

      Assigned as a Project Engineer of the Manila scope. The project was a polypropylene expansion/revamp of the Saudi Polyolefins plant in Jubail, Saudi Arabia. The project was worksharing with Haarlem, Netherlands office. Assumed project coordination of needs list to the head office and helped resolve engineering/design issues in the project. Helped facilitate communication with the home-office regarding priorities of construction and fabrication. Helped in monitoring and controlling the progress of the project against the project schedule and budget.

    • Engineering Manager
      • Jun 2007 - Jan 2008

      Assigned as the Project Engineering Manager of the Manila scope. The project was a Hydrocracker expansion project in one of the plants of Conoco Phillips in Rodeo, California. This project was worksharing with Aliso Viejo office. Responsible in managing Manila taskforce in ensuring quality of engineering deliverables, resolving engineering issues, continuous coordination with AV office, ensuring coordination with engineering disciplines, responsible in monitoring and controlling the progress in terms of schedule and budget, making sure that engineering squad checking is in place and maintain teamwork within the taskforce.

    • Project Management Support
      • Oct 2006 - May 2007

      Assigned as a Project Management Consultant of Singgar Mulia (prospect partner of Fluor in Indonesia) on the FEED phase of the Liquified Petroleum Gas (LPG) project of Pertamina in Pondok Tengah. Mentoring the team in the project execution of the feed phase, conducting quality audits, helped in achieving project schedule and progress commitments, monitor staffing, identified the risks of the project and monitor corresponding mitigations, and provide work processes to aid engineering project execution. The FEED phase of the project had been completed on schedule and within budget.

    • United States
    • Construction
    • 700 & Above Employee
    • System Turnover Manager
      • Jul 2005 - Apr 2006

      Assigned at the construction site (Seeney, Texas) as System Turnover Manager responsible in planning, defining turnover systems breakdowns and scheduling turnover packages. Responsible in coordinating walkdowns with the client, with the construction team and engineering team. Tasked as the administrator of the CompleteIt, a tool in monitoring and controlling punchlist items; integration kit of information on mechanical, instruments, piping and electrical devices/equipment, and a tool that was used in issuing certification that a turnover system has been completed. Also responsible in selling to the client the system turnover packages that were completed for transfer, care, custody, and control.

    • Control Systems Lead/Engineering Manager
      • Jan 2004 - Jun 2005

      Shifted to project management and project engineering role, in charge of the whole taskforce in ensuring quality of deliverables, continuous coordination between offices and disciplines, project scheduling and cost monitoring, monitor vendor squadchecking, and maintain teamwork within the taskforce. Assigned as lead engineer for Control Systems in FDIP, leading the effort on preparing the engineered instrument package for RFQ and PO, developing vessel sketches, PDS Modeling and review, development of additional installation detail, development of wiring schedule in INtools, development of Location Plan, and loop diagrams. Assigned in Houston office in the Front-end phase of the project, involved in the scope writing, planning, estimating, and scheduling. Involved in the P&ID development and review, Instrument Index database development in INtools, development of spec datasheets, sizing, and purchasing of long lead in-line instruments such as Control Valve, Relief Valve and Flow Meters.

    • Control Systems Lead
      • Jan 2001 - Dec 2003

      Worked on United Olefins Complex project (petrochemical plant located in Jubail, Saudi Arabia) as Lead Engineer of Control Systems. Fluor was involved in the detailed engineering phase for the Utilities and Offsites of the plant, worksharing with FDHO (Fluor Daniel Houston) as the lead office. As lead of Control Systems, was leading the effort in preparing the engineered Instrument packages (long lead instruments such as Safety Relief Valves, Control Valves, Level Instruments and Flowmeters, and offline instruments such as gauges, switches, solenoid, local panels and transmitters) for RFQ and PO, Material Management entry of the instruments being purchased, level sketches preparation, mechanical vendor and vendor package instrument datasheet squadchecking. For design, was leading the effort for the following activities: In-line and offline PDS modeling, Wiring and Loop diagram generation in INtools, updating 2D drawings such as logic diagrams, Nameplate schedule, control buildings layout (control panel, console and rack physical dwg), and instrument indexing in INtool.

    • Control Systems Engineer
      • Jul 2000 - Dec 2000

      Was involved in preparing the estimate and project set-up for the Bayer Shanghai Polymers project in China where the scope of Control Systems is from front-end till detailed engineering, where FDIP being the lead-office worksharing with the Chinese Design Institute as the proposed strategy.

    • Control Systems Lead/Engineering Manager
      • Dec 1999 - Jun 2000

      Function as Manila Engineering Manager for Shell Goal Venture Project AO3, on the last 15% of the project. Responsible in managing the entire Manila detailed engineering execution. Ensure that schedules, progress, budget and quality standards were being met. Act as the primary Manila interface with the Houston project team. Assist the project controls staff in cost and scheduling. Responsible for creating solutions to design issues and coordination difficulties. Ensure overall project directives met by all disciplines and project close-out. Worked on Shell Goal Venture Project as Lead Engineer for Control Systems Manila Team for the detailed Engineering /Design phase of the project. In charge of supervising the specification of instruments (off-line instruments), preparation of instrument technical requisition, PDS Modeling, Instrument Location Plan and some instrument calculations. Also in-charge of planning, scheduling, and progressing. Assigned in Houston, Texas Fluor Daniel for Shell Goal Venture Project doing AO-3, involved in Control Systems Front-end Engineering, doing data sheet/spec sheet development (Control Valves and Flowmeters), procurement, database development, and estimating. Alignment was undertaken to continue the detailed Engineering and Design phase in the Philippines.

    • Control Systems Lead
      • May 1999 - Dec 1999

      Finished the Solvay Project as Lead Engineer for Control Systems. The VDF 1999-PVDF 2000 Project is a polymers plant and built on undeveloped virgin land along the west side of State Docks Road just north of an existing Norfolk Southern Rail line in Decatur, Alabama. Activities being supervised are as follows: In-line Instrument building in PDS modeling, Off-line Instruments placing in PDS modeling, Junction Box Wiring Schedule, Marshalling Box Wiring Schedule, DCS/PLC Wiring Schedule, Instrument Cable Schedule, Nameplate Schedule, Instrument Loop Diagram generation, Instrument Index data entry/update, and Instrumentation Material Take-off in GMS. Worksharing with FDHO (Houston) regarding engineering and design for this project. Also responsible in estimating the engineering and design needed to complete the job, developing the AQP (Activity Quality Plan), scheduling in Control Level Schedule, and EZ Trac, squad checking of vendor data, interfacing with other disciplines, and successfully closing out the project. The team was able to beat the schedule and thus saving significant manhours.

    • Project Engineer/System Turnover Engineer
      • Apr 1999 - Nov 1999

      Completed a site assignment in Sumbawa, Indonesia for Batu Hijau Project (Copper and Gold Mining Plant) as Area System Coordinator Engineer for the Pre-Operational Team. Tasked to handle the following systems: Infrastructure (Communications – LAN, WAN, CATV, OSP, Telecom Rooms, UHF, and VHF), Township Systems, Water Treatment System, and Temporary Systems. Primary responsibility was to coordinate the Engineering Team and the Construction Team to focus on a common goal in finishing quality systems to be turned over to the client. Also responsible in scheduling and organizing meetings and walk-downs with the client, and all disciplines involved thus expediting the completion of outstanding punchlist items.

    • Control Systems Engineer
      • Jan 1999 - Mar 1999

      Assigned in Kodak China 7B Project as a Checker. The project is located in Haicang, Peoples Republic of China. Responsible in checking the detailed design deliverables in accordance with the Design Criteria, Go-bys, PPM, PEP, and Job Bulletins. Delegated by the Lead Engineer to improve and finalize the Work Instructions, Work-Flow, and Checklists applicable for the project. Squad checking of vendor data and identifying the interface with the vendor skids/package.

    • United States
    • Construction
    • 700 & Above Employee
    • Control Systems Engineer
      • Jun 1997 - Apr 1998

      Was assigned in Denver Colorado, responsible of the PLC I/O loading (6,000 pts.) with the use of MS Access and also using macros. Responsible in creating the material take-off of the PLC hardware system, developing Process Control (System Logic in Narrative form) for PLC Programming guidelines and interfacing with vendor supplier in terms of Communicating with the PLC/DCS system. Checking of Electrical Schematic Diagram in interface with the DCS/PLC system. He has gone through training in Conductor NT (MMI software) for DCS application in Bailey Training Center in Cleveland, Ohio.

    • Control Systems Engineer
      • Jun 1996 - May 1997

      Previously assigned in Procter & Gamble Personal Cleansing Category Project as Lead Engineer, supervising the programming of programmable logic controller using software 6200 by Allen Bradley. Duties involved developing the PLC Architecture, creating the I/O listing, supervision of the simulation to test the success and credibility of the program and setting-up the configuration of the controller. Involved in developing the Conceptual Function Specification (System Logic in narrative form) and developing logic presentations based on the conceptual function specification and processes. And also trained the E&I team (Engineers and Technicians) of Procter & Gamble for this project to enhance their skills on the rudiments of electrical and instrumentation to help them prepare in the maintenance and operation of the plant.

    • Control Systems Designer
      • Aug 1995 - May 1996

      Assigned in P&G Syndet Bar project as a designer. Work involved in developing database (Access) for the instruments and I/O listing of the PLC, designing logic drawings, designing PLC Architecture, JB loading, designing location drawings. Instrumental in the creation of a program for generating elementary drawings automatically extracted from database inputs. Also assigned in cross checking the quality of the documents to be issued for engineering information.

    • Systems Engineer
      • Jan 1994 - Jul 1995

      Assigned in the DMS (Danger Management System) division in-charge of sales/marketing products for industrial and commercial applications such as automation of fire protection, security system, traffic management, CCTV and CATV for building, these are integrated to the building management system. Rendering services to partners and clients that seek technical support and assistance. Assigned in the DMS (Danger Management System) division in-charge of sales/marketing products for industrial and commercial applications such as automation of fire protection, security system, traffic management, CCTV and CATV for building, these are integrated to the building management system. Rendering services to partners and clients that seek technical support and assistance.

    • E& I Engineer
      • Jan 1991 - Dec 1993

      Assigned as lead engineer in-charge with one team in the construction and installation of electrical and instrumentation in RAGC (Republic Asahi Glass Corporation) automation plant project. This plant is considered as the biggest plant in the production of glass in the Philippines. Was also part of the commissioning team of that project. Assigned as lead engineer in-charge with one team in the construction and installation of electrical and instrumentation in RAGC (Republic Asahi Glass Corporation) automation plant project. This plant is considered as the biggest plant in the production of glass in the Philippines. Was also part of the commissioning team of that project.

Education

  • University of Santo Tomas
    Bachelor of Science in Electrical Engineering
    -
  • Project Management Institute
    2007 - 2007
  • De La Salle University
    Masteral, Business Administration and Management, General
    2001 - 2003

Community

You need to have a working account to view this content. Click here to join now