Nasrullah Nawaz
E&I Manager at Fauji Cement Company Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Fauji Cement Company Limited
-
Pakistan
-
Construction
-
200 - 300 Employee
-
E&I Manager
-
Jan 2022 - Present
-
-
-
Maple Leaf Cement Factory Limited
-
Pakistan
-
Construction
-
1 - 100 Employee
-
Sr. Manager Electrical
-
Jun 2015 - Feb 2022
-
-
-
Descon Integrated Projects Limited (DIPL)
-
Pakistan
-
Oil and Gas
-
200 - 300 Employee
-
Sr.Design Engineer (Electrical )
-
Oct 2014 - Jun 2015
Responsible for design of electrical generation and distribution systems. Working on different industrial and commercial projects including Wind farms, Oil and gas fields, solar farms, FMCG etc. Working experience in the field of - Sizing & Selection of major electrical equipment using ETAP and in house excel sheets:- 1) LV & MV Panel boards, Switchboard, MCC, Switchgear, Bus bars. 2) Transformer 3) Capacitor banks 4) CT & VTs, Surge Arresters, CBs, and other protection equipment 5) Power and control cables 6) UPS, Batteries, Battery chargers 7) Generators 8) Motors 9) Bus bars - Power System Studies using ETAP and inhouse excel sheets 1) Load flow 2) Short circuit 3) Motor starting 4) Relay coordination 5) Ground mat analysis 6) Energy assessment of power plants 7) Transient stability studies 8) Harmonic analysis - Lighting calculation and design using Dialux :- 1) Indoor( Residential / Commercial buildings) 2) Outdoor (industrial process areas / street lighting / exteriors etc) - Grounding and Lightning Protection system design 1) Plant/Building area 2) Substation and switchyard - Fire alarm and fire fighting system design Show less
-
-
-
IBRAHIM GROUP
-
Sri Lanka
-
Human Resources Services
-
1 - 100 Employee
-
ELECTRICAL ENGINEER
-
Sep 2008 - Oct 2014
Worked as Electrical Engineer with responsibilities of Installation, testing/commissioning of electrical equipment’s (MV/LV Switchgear Panels, Transformers, AC/DC Drives, Motors ) of new Polyester plant(600Ton/Day)and Maintenance, Operation, Troubleshooting of existing 600 Ton/Day plant . Major Maintenance responsibilities were: 1) Operation & maintenance of 11KV substation connected through ring main including a) HT panels with vacuum circuit breakers upto 630A with their control Circuit. (Make: Alstom) b) LT panels(Make:Alstom) with air circuit breakers upto 4000A(Make:Siemens) With their control circuit. c) Transformers (11/.415 KV) upto 2500 KVA (Make: Siemens). 2) Predictive, preventive, proactive maintenance & operation of a) VFDs (variable frequency drives) upto 630 KW (Make: Siemens). b) Rectifiers upto 800 KW (Make: Siemens). c) All type of LT motors along with their control circuits upto 630 KW (Make: Siemens). 3) Operation & maintenance of UPS systems upto 80 KVA (Make: Siemens). Show less
-
-
Education
-
UET LAHORE
Bachelor of Science (B.Sc.), Electrical Engineering -
UET Taxila
M.Sc, Electrical and Electronics Engineering -
Govt College D.G.Khan
F.Sc, PRE ENGINEERING