Naresh Salde

Sr Project Manager at Universal Hunt
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Qatar, QA
Languages
  • English -
  • Hindi -
  • Arabic -
  • Telugu -
  • Marathi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Naresh is a very hard working, sincere and very punctual Maintenance eEngineer. You can be 100% sure that he will deliver the results expected of him.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Human Resources Services
    • 700 & Above Employee
    • Sr Project Manager
      • May 2021 - Present

    • Sr. Project Manager MEP
      • May 2018 - Dec 2018

       Managing the consultant and contractors teams for MEP delivery across a major project. Supervising, appointing and overseeing the consultants, designers, main contractors and MEP sub-contractors. Leading the MEP senior team consisting of MEP Project engineers and other lead engineers. Providing guidance and coordinating efforts of the planning, design and construction management activities, assigning personnel and sub-consultants within a multidisciplinary, multiple phased construction project environment. Leading the MEP team in undertaking the technical reviews and compliance checks of the contractor’s submittals. Executing standardized procedures for monitoring the progression of planning, design and construction phases. Monitoring project and staff to ensure that projects are progressing according to the established procedures and cost, time and quality objectives. Interfacing with project designers and contractor to coordinate the design intent with construction delivery. Preparing reports for project director and client indicating procedure adherence and project progress. Ensuring periodic inspection of construction activities and compiling non-compliance reports as appropriate and recommending the appropriate follow up action. Ensuring that main contractor is in compliance with project plans and specifications. Monitoring the quality of work performance by the contractor and the quality of materials used on-site. Evaluating the progress of the project to determine if time schedules and cost objectives are being met. Assisting in change control management and claims process with contracted parties and ensuring client protocols are adhered to and employed. Striving to ensure project time and cost objectives are met. Implementing and following quality assurance program procedures. Implementing and following health and safety programs.

    • Project Manager MEP
      • Jun 2017 - Nov 2017

       Providing leadership for multiple aspects of controls including costs, planning, scheduling, engineering, supervision and management of personnel Project start up, project completion, and entire close-out process  Develops strategy for personnel development & recruiting Responsible for managing contractual issues Establishing and maintain customer relationships Accurate forecasting of costs for job completion Provide leadership and development to project team Final say in the resolution of problems Quality Assurance and Quality Control plans Identifies issues to Program Manager as required to ensure the success of the project Reviews and approves preliminary schedules, financial projections, and cost to complete Ensures construction site rules and procedures are implemented and followed Responsible for managing a Staff/Labour in the project.  Ensure timely project submittals and obtaining relevant approvals; (Samples, Shop Drawings, Design Details, Work Procedure, Method Statements, Schedules, and Programs etc.)  Arrange all clearances, approvals, permissions, etc. as may be required from time to time from any of the statutory authorities during the execution of the Project. Schedule and plan all project activities in line with Master Program in co-ordination with the Planning Engineer.  Represent the company in all project related meetings with Client/Engineer/Main Contractor and reporting back to the Project Director

    • Civil Engineering
    • 100 - 200 Employee
    • Mechanical Project Manager
      • Jul 2009 - May 2017

       To plan, develop co-ordinate and direct start-up activities for the Commercial and Industrial Projects. Provide start-up assistance at the jobsite. To assist with the identification of hand over systems and the establishment of priorities and sequence of completion. To review during the construction phase the status of testing and punch listing to ensure systems are turned over to commissioning and start-up in a smooth, safe and efficient manner. To interface with Client’s operation staff and keep them informed of system completion status. To supervise, co-ordinate and review the work of assigned engineers, estimate staffing needs and schedules, and assign work to meet completion dates. To prepare or direct the preparation of operations manuals. To ensure that work being performed is within scope of services and within budget. To input to project management, engineering, and construction to ensure start-up requirements are incorporated into water & wastewater project activities, including review of project designs and construction to ensure plant operability and operating personnel safety. To co-ordinate with client representatives to obtain approval on work as it is accomplished. To review and approve key start-up methods, procedures, and schedules on assigned waste & wastewater project(s). To perform personnel evaluations for personnel supervised and ensure that they receive appropriate on-the-job training for their professional development. To make contact with client management at key points throughout projects to ensure that start-up aspects are meeting client requirements. To regularly review and appraise the structure of the start-up organisation, in terms of its ability to meet short and long term objectives, and institute appropriate changes.

    • Sr. Project Engineer
      • Sep 2007 - Jun 2009

       Develops division's/ department's work plan; assigning work activities, monitoring work flow, reviewing and evaluating work methods and procedures, and directing such activities to serve division's/ department's goals and plans. Provides technical assistance and expertise related to determining the size of HVAC ducting, and preparation of ducting layout and conducts friction loss calculation of duct work. Supervises the preparation of the control system layout and sequence of operation, equipment schedules.  Reviews suppliers’ documents and liaises with suppliers for technical inputs and inquiries, qualifies and approves suppliers. Manages and supervises the preparation of all mechanical designs and construction drawings, including but not limited to, central HVAC drawings, for the projects and advice necessary notes and recommendations. Ensures progress monitoring and early problem prevention through analyzing situations and problems accurately, identify and weigh the probable effects of alternative solutions and implement effective courses of action. Attending meetings with Consultants and Clients Handling all types of Material Submittals and approval of shop drawings. Selection of equipment’s, ducts and pipe routing, detail design Engineering of HVAC system Heat load calculation Preparation of drawing and specifications. Hands on experience in Contracting/Consulting firm, related to Design, Construction, Maintenance of HVAC systems. Preparation of drawings and approval of same from Clients / Consultant. Training to new staffs, as well as solving the queries of old staff. Contributed to a large extent in the process improvement, being part of a pilot batch for the project.

    • Air Conditioning Maintenance Engineer
      • Nov 2003 - Jul 2007

       Establishment of the HVAC basic and detailed Engineering planning of the project. Elaboration and checking of basic and detailed engineering design for: Duct work drawings, Piping drawings, HVAC calculation notes, HVAC load calculations, HVAC pressure drop calculations, Technical rooms layouts and details, etc...  Single line diagram conception and detailed design. HVAC functional analysis. Elaboration and checking of coordination drawings for HVAC & MEP works. Elaboration of reservation drawings. Equipment specification ( Chillers, AHUS, FCUs, pumps, grills and diffusers, dampers, ...) Interface with packaged mechanical equipment vendors. Supervision of connection and distribution drawings made by drafting persons. Purchase order technical follow-up, Follow up of HVAC execution works and site coordination. Establish progress reports for HVAC scope. Participation to factory acceptance tests and site acceptance tests when applicable. Participation to pre-commissioning, commissioning and start-up activities where applicable.

    • Sr. Air Conditioning Engineer
      • Jan 2001 - Oct 2003

       The key responsibility is to analyses, plan and execute maintenance contracts effectively to ensure that the budgeted profitability is achieved. The position will report to Maintenance Manager and be in charge of HVAC maintenance works, maintain liaison with clients, ensure complains are resolved on time, ensure preventive maintenance is carried out as planned to avoid breakdowns and provide training to the team members.  Verifies that construction confirms to MEP design and requirements and reviewing contracts, specification, drawing and all related HVAC systems. Control and monitor all MEP activities of consultants and contractors and to ensure these activities are in accordance with approved drawing and specifications. Monitors the installation and start-up of MEP systems and commissioning of the project. Responsible for monitoring the day-to-day operation of mechanical, electrical and plumbing under the Utilities Scope. Coordinates all issues of MEP under the Utilities Scope with Service Provider for resolution. Attends coordination meeting between maintenance and operations to ensure that Preventive Maintenance (PM) of MEP and equipments is performed according to schedule and standards including Project Management Team, Commissioning and Facilities Management. Conducts technical review of upgrades and modifications and help in the decision making process. Provides technical consultations on issues related to several categories of MEP systems. Assists with MEP installation, troubleshooting and repair as needed. Monitors work flows and schedules with designated contractors.

    • Air Conditioning Engineer
      • Nov 1995 - Sep 2000

       Supervises all activities of assigned personnel. Performs supervisory functions at the level established by the management for the position. Receives and reviews incoming work request for functioning and maintenance of equipment, system, facilities and other related services in the respective field of engineering. Processes the work requests after filling in the required materials, man hours, and skill levels. Allocates work to subordinates and contractors, checks progress providing instructions and advice as necessary and ensures that works are completed confirming to established work standards and statutory requirements.  Prioritizes the work requests and guides the subordinates, contractors to execute the work. Provides advice related to the planning and commissioning of new projects, which includes liaising with inter-discipline engineers within the department, with vendors, consultants, and contractors. Reviews drawings, evaluates systems, drafts scope of work for Plant changes, snags completed projects and generates all relevant work reports. Participates in, and personally involves in the complex installation, maintenance and testing of a wide range of equipment, facilities, system in the respective field of engineering.

    • AIR CONDITION ENGINEER
      • Dec 1993 - Apr 1995

       To plan and schedule the work and efficiently organize the site / facilities in order to meet an agreed programme of deadlines. To attend regular meetings with clients, architects and consultants and keeping them informed of progress. To supervise and monitor the site labour force through General Foreman and or Supervisors, monitoring the work of any subcontractors to complete the work as per customer's satisfaction. To oversee quality control and safety matters on the site, and ensure that regulations are adhered to. To resolve any unexpected technical difficulties and other problems that may arise at any time. To oversee the selection and requisition of materials for use in the construction / maintenance, to check whether the materials are as specified. To supervise and ensure proper maintenance of materials and to advise on technology and modifications required for a simpler and cost saving mechanism. To prepare necessary paperwork for the completion of work and get it authorized by the client after their inspection. To develop a relationship with the Project Engineer and prepare periodical reports on the progress of work.

    • AIR CONDITION MAINTENANCE ENGINEER
      • Jul 1991 - Nov 1993

       To supervise, coordinate and control all activities of maintenance, refurbishment, modifications; and construction, installations, commissioning, and testing of equipment, buildings and system. The activities include wide range equipment, system, building associated with different disciplines such as HVAC, Electrical, Mechanical, Instrumentation, Civil and General Services. To ensure that Plant preventive maintenance activities are carried our as per the schedule. To troubleshoot the premature and unusual failure of the system. To carry out root cause analysis of the problems. To ensure all the field activities are carried out as per Safety standards. To provide work directions to contractor staff and ensure that all activities confirm to QF policies and procedures and accepted technical standards. To remain up to date in the respective field of engineering. To coordinate cohesive functioning of O&M team (Mechanical, Electrical, HVAC, Instrumentation, Civil and General Services) to ensure a high degree of reliability/availability of equipment and facilities.

Education

  • Sardar Patel College of Engineering
    Bombay University, Mumbai, India, Bachelor in Mechanical Engineering
    1987 - 1991
  • Jai hind High School, Pimpri, Pune, India
    HSC, Social Sciences
    1985 - 1987

Community

You need to have a working account to view this content. Click here to join now