Naoshad Bajan
Principal Process Engineer - Consultant at SATTVA EngiTech Pvt Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
SATTVA EngiTech Pvt Ltd
-
India
-
Oil and Gas
-
1 - 100 Employee
-
Principal Process Engineer - Consultant
-
Oct 2016 - Present
1) HH83-2 and SEH Minimum Facility Offshore Platforms (GPC, Egypt) Principal Process Engineer for the FEED Design of the Minimum Facility Offshore Platforms (HH83-2 and SEH) • Performed Mass & Energy Balance (HYSYS Simulation). • Performed Equipment Sizing, Line Sizing and Dispersion calculations. • Developed Process and Utility Diagrams (PFD and P&ID). • Developed the Design Basis Memorandum and Equipment Data Sheets. 2) Garraf GDP Phase-2 Project (Petronas, Iraq) Principal Process Engineer for the FEED Verification of the Gas Dehydration Project • Performed Mass & Energy Balance (HYSYS Simulation). • Performed Equipment Sizing, Line Sizing, Flare, Blow-down and Relief calculations. • Reviewed and Appraised Process and Utility Interconnection Diagrams (PFD and P&ID). • Developed the Design Basis Memorandum, Process Design Basis, Isolation Philosophy, Cause and Effects Matrix and Equipment Data Sheets. 3) Wadi Latham Control System Upgrade (Oxy, Oman) Principal Process Engineer for the Detail Design of the Wadi Latham Control System Upgrade Project • Developed Process Philosophies for the online changeover of the related Instrumentations (~1,650 I/O tags) from the old PLC to the new PLC. • Performed Risk Assessment analysis for each of the identified control loops. 4) J-Line System Project (Lyondell Basell, USA) Principal Process Engineer for the FEED Design of the J-Line System Project • Developed Process and Utility Interconnection Diagrams (PFD and P&ID). • Developed the Design Basis Memorandum, Process Design Basis and Equipment Data Sheets. Show less
-
-
-
PETRONAS Carigali (Turkmenistan) Sdn Bhd
-
Turkmenistan
-
Oil and Gas
-
1 - 100 Employee
-
Lead Process Engineer
-
Jun 2013 - Jun 2016
Lead / Sr Process Engineer for the FEED of the Kasawari Gas Development Project Implemented Process Engineering duties and responsibilities to the Kasawari Project by delivering process related objectives, in a timely manner, for the Conceptual Engineering & FEED stage of the project. • Conceptual Engineering Phase o Reviewed and Approved the following Process documents: - Design Basis Memorandum - Concept Risk Assessment Report - Acid Gas Removal Technology Review - Mercury Removal Report - HAZID Close-Out Report - PFD’s- Concept Selection Basis of Design - Concept Select Report- Existing Ullage & Optimization Report - Process Simulation Report- Gas & Condensate Evacuation Report - Pipeline Hydraulic Report- Operating & Maintenance Philosophy o Participated as the Sr. Process Engineer for the HAZID review workshop.• FEED Phase - Carried out by three (3) bidders as a FEPCIC (FEED roll over to EPCIC)o Performed, Reviewed and Appraised Mass & Energy Balance (HYSYS Simulation) o Reviewed and Appraised the following process documents: - Design Basis Memorandum - Process & Utilities Design Basis - Isolation Philosophy - Cause and Effects Matrix- Flare, Vent Relief & Blow down Philosophy - RAM Study- Mercury Partitioning Study - Mercury Management Philosophy- Open and Closed Drain Philosophy - Process Control & Safeguarding Philosophy- Start-Up Operating & Shut-Down Philosophy - SIPROD Philosophy- HAZOP Study Report - HAZOP Close-Out Report- Equipment Data Sheets - Start-Up and Commissioning Philosophy- Risk Evaluation Report for de-rated piping & Process Safety Time (PST) simulation reporto Reviewed and Appraised the following Calculations:- Process & Utilities Equipment Sizing - Process & Utilities Line Sizing - Blow down, Relief and Flare - Firewater Demand - Firewater system Hydraulics Show less
-
-
Sr Process Engineer
-
Jun 2012 - Jun 2013
Baronia accelerated oil infill project is part of the EOR field developments for Petronas Carigali. The intent of the project is to increase the oil production (by 9,000 BPD) by drilling two new oil infill wells, and one side-track from existing depleted wells. • Detail Engineering & Commissioning Phase o Performed, Reviewed and Approved Mass & Energy Balance (HYSYS Simulation) o Reviewed and Approved the following process documents: - Process & Utilities Adequacy Check Report - Process Control & Safeguarding Philosophy- Relief & Blow down Report - Cause and Effects Matrix- Operating Procedure Manual Update - Equipment Line List- HAZOP Study Report - HAZOP Close-Out Report- SIPROD Philosophy• Provided Process & Operational support during the execution of the project. Active part of the Start-up and Commissioning Team offshore. Show less
-
-
-
Dubai Petroleum
-
United Arab Emirates
-
Oil and Gas
-
700 & Above Employee
-
Sr Development Engineer
-
Apr 2010 - Nov 2011
Sr. Development Engineer for the EOR project that entails injecting miscible hydrocarbon gas into the Mishrif reservoir.Implemented Process Engineering duties and responsibilities to the EOR Project by delivering process related objectives, in a timely manner, for the Conceptual Engineering stage of the project. • Carried out concept studies to determine the optimal execution method for the project.• Developed the following Process documents: - Concept Selection Basis of Design - Concept Risk Assessment Report - Concept Select Report - PFD’s- Process Simulation Report - Pipeline Hydraulic Report- Platform Decommissioning Philosophy Operating & Maintenance Philosophy Show less
-
-
Sr Facilities Engineer
-
Feb 2007 - Apr 2010
Responsible for providing Process Engineering support to offshore operations. • Developed Feasibility studies and value propositions for: o Flare Optimization Study - Performed flare network calculations (Flare header backpressure, PSV & BDV sizing) for Fateh & SWF to determine flare safe operating limits.o Installation of new Oil & Gas Subsea Pipelines - Performed field pipeline hydraulic calculations to determine optimal flow path and pipeline size for the new subsea pipelines.o Operation Optimization - Studied and modeled the overall operation to determine what processes could be optimized and/or decommissioned- Optimized Process Control on Production Separators- Optimized overall Fuel Gas Consumption - Optimized the Cause & Effect Matrix to prevent unnecessary production shutdown and impact- Fire Water Optimization - Performed calculations for the fire water network to ensure compliance with NFPA standards and determine optimal piping and pump size.- Open and Closed Drain System Optimization - Optimized drain system and associated equipment’s.• Responsible for Engineering, Planning, Safety, Procurement, Logistics, Installation and Implementation of various offshore operational projects. - Gas recovery to the LP Flare - Skim Tank Optimization- Corrosion Inhibitor Project - Infill Drilling Projects- Utilization of multi-phase jet pumps for kicking off wells• Developed platform Commissioning and De-Commissioning strategy.• Participated as the Sr. Process Engineer for the HAZOP of existing offshore platforms.• Developed various operating procedures (Black Start, Intelligent Pigging of oil and gas pipelines).• Resolved Asset, Integrity and Operability issues.• Incident Management Team member. Show less
-
-
Facilities Project Manager
-
Sep 2005 - Feb 2007
Responsible for the Planning, Cost Estimation, Design, Safety, Procurement, Logistics, Installation and Implementation of the following projects: 1) Rashid Turnaround Project Rashid Turnaround was a seven (7) day turnaround project that included the following tasks:o Flare network optimization and Flare tip replacement. o Vessel internal inspections and repairs.o Maintenance activities.2) NORM (Naturally Occurring Radioactive Material) Decontamination project.This project was the first type of Radioactive Decontamination project carried out in the Middle East. The tasks included:o Cleaning approximately 1,200 NORM contaminated (Strontium Sulphate, Barium Sulphate and Lead-210) drill pipe joints using High Pressure (42,000 psi) water jetting technique. o Re-injecting approximately 200 tons of the NORM scale, as propant, into the reservoir at fracture pressures. Show less
-
-
Associate Facilities Engineer
-
Feb 2002 - Sep 2005
Assisting the Sr Facilities Engineer in • Troubleshooting, optimizing production and constant interface with operations.• Resolving Asset, Integrity and Operability issues.• HAZOP of existing offshore platforms
-
-
Education
-
Texas A&M University
Bsc, Chemical Engineering