    • Deputy Planning Manager
      • Dec 2018 - Present

      Projects Worked On: Project: Construction of Marassi Al Bahrain Mall, Carpark, Vida Service Apartment & Hotel with Buildup area of 503,936 sqm. Period: Dec’ 18–Till now Key Result Areas: • Prepared, Submitted, and Secured the approval of the Resource loaded Baseline Program which contains 27141 activities. Prepared and submitted “S” curve, Manpower Histogram, and KPI’s for the Project. • Prepared and Circulated the Internal Target Program and Periodical look ahead for the Site team. • Updated the Progress weekly and discussed the critical delays with the Planning Manager. • Monitored the Specialized Subcontractor’s Progress. • Preparing the Delay notification to the Engineer and the Subcontractors. • Prepared and Submitted the Revised Program as per Employer/Engineer’s request. • Prepared and Submitted the PMO report for High-level Management on a Monthly Basis. Highlights: • Prepared and submitted Interim Extension of Time of 380 calendar days in TIA window analysis method Show less

    • Deputy Planning Manager
      • Dec 2013 - Dec 2018

      Projects Worked On: Project: Construction of Commercial Building for CBQ at Al Sadd Street Period: Dec’ 13 – Dec’ 17 Key Result Areas: • Prepared and Submitted the resource-loaded baseline program as a part of the execution plan of the project along with Manpower histogram, “S” curve & KPI of the project. • Prepared and Submitted the Shop drawing/Procurement schedule of the project. • Mapped the project performance in terms of cost and performance and closely monitored project risks on a regular basis and made ‘notifications for delays’. • Presented periodical reports such as monthly/weekly progress reports and MIS report. • Closely monitored the productivity rate of manpower deployed at the site. • Prepared and submitted the Mitigation program on request of Consultant and Client. Highlights: • Prepared and submitted an Extension of Time of 475 calendar days out of which the consultant technically agreed to provide 308 calendar days as an interim entitlement. • Active team member in preparation and submission of “Disruption and Prolongation cost” for the Entitlement. • Singly handed (Project Worth: 240 Million Qatari Riyal) planning requirements and reports along with preparation and submission of EoT’s. Projects Worked On: Project: Design and Construction of GCT, MUT, and OST for New Port Project, Doha Period: May 15 – Sep’ 15 & Dec’ 15 – Dec’17 Key Result Areas: • Prepared and submitted the Baseline program with manpower and equipment histogram, Cashflow and KPI’s. • Prepared and Submitted the Revised program with manpower and equipment histogram with actual productivity reported so far, Cash flow, and KPI’s • Prepared and Submitted the o Shop drawing/Procurement schedule of the project based on the revised program o Weekly and monthly look ahead • Periodical reports such as monthly dashboards, monthly/weekly progress reports, and MIS reports Highlights: • Prepared and submitted an Extension of Time of 705 calendar days. Show less

    • India
    • Construction
    • 100 - 200 Employee
    • Planning Engineer
      • Jun 2012 - Aug 2013

      Projects Worked On: Project: Construction of Industrial building for Kobelco Plate Processing Unit and Kobelco Cranes Unit, Chennai Period: June’ 12 – Aug’ 13 Key Responsibilities: • Formulated the monthly, weekly and daily schedules based on master construction schedule • Estimated the Manpower and Equipment requirement for the project. • Prepared the bar bending schedule • Performed delay analysis and catch up schedules • Prepared the Daily, weekly and Monthly reports of the project. • Analyzed the detailed estimation of quantities for varies item of work, prepared the bar bending schedule and reconciliation of materials (Mainly Rebar and Concrete) • Utilized the Precast Construction Methodology for several structural members like grade beam, dike wall and precast drain Show less

    • India
    • Civil Engineering
    • 200 - 300 Employee
    • Planning Engineer
      • Aug 2006 - Oct 2008

      Projects Worked On:Project: Construction of Residential Building in BangaloreKey Responsibilities:• Developed theconstruction schedule using MS-Project.• Formulated themicro-schedules and closely monitored the progress.• Prepared the Daily, weekly and Monthly reports of the project• Maintained a close coordination with Specialized Agencies for execution of works at site and Facilitated certification related to the subcontractor bills

    • Site Engineer
      • Jun 2004 - Jul 2006

      Projects Worked On:Project: Construction of Commercial Building in BangaloreKey Result Areas:• Supervision of work execution in terms of Schedule, Productivity, quality and safety measures.• Prepared, reviewed and discussed resources requirement with the project manager.• Coordination with other department/subcontractor for achieving the targets/smooth run of the project.• Material reconciliation on daily basis for concrete, cement and block. Periodically for rebar.• Checked the subcontractor’s bills. Show less

Education

  • Indian Institute of Technology, Delhi
    Master of Technology (M.Tech.), Construction Engineering and Management
    2009 - 2011
  • Government College of Technology, Coimbatore
    Bachelor of Engineering - BE, Civil Engineering
    2000 - 2004

Community

You need to have a working account to view this content. Click here to join now