Nabila Sukma Hamida

Reliability Instrument Engineer at PT Nusantara Regas
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Central Jakarta, Jakarta, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Indonesia
    • Oil and Gas
    • 1 - 100 Employee
    • Reliability Instrument Engineer
      • Oct 2023 - Present
    • Indonesia
    • Oil and Gas
    • 700 & Above Employee
    • Instrument Planner
      • Dec 2022 - Sep 2023

      1. Maintenance (Preventive, Predictive, Corecctive), BEC (Basic Equipment Care), BOC (Basic Operation Care) 2. Managing Plan certification Tank and ATG (Planing, Scheduling, Monitoring) 3. Upgrading System / Innovation 4. Make Planing Project, Scheduling, Monitoring: -> Planing a. Survey engineering in the field (Position cable tray, distance cable, JB for electrical, JB for Signal, Air Instrument / tubing pipe b. Make Design Engineering Architecture Design. c. Decided Equipment Specification of PLC, Transmitter, Solenoid Valve, Local Panel (If needed), HMI, Cabel, Air Instrument (Tubing Pipe), FCS (Node, Slot, Chanel) Idle and Decided Flow chart base on control naratif. -> Scheduling a. Make Time Frame All activity plan of works Pulling cables, Install Local HMI and OS (Out Station), DCS Modification, Install Panel. -> Monitoring a. Monitoring Progress Project (Record, Record, observe daily progress all types of works and any implementation / Issue including quality issue, technical issue, FAT/SAT) 5. Make Strategy to the catch target 6. Ensure Progress with according to target. Making Owner Estimation 7. Making build of quantity 8. Job planning project maintenance 9. Prepare commercial and technical document, estimated material, service and cost for project planning 10.Analyze Tingkat Komponen Dalam Negeri (TKDN) 11. Analyze Risk Assesment for CSMS 12. Performance Guarantee and Fines, controlling and monitoring work progress project and evaluated project. 13. Making Scope of Work Show less

    • Product Development
      • Oct 2021 - Aug 2022
    • Farming
    • 1 - 100 Employee
    • Student Internship
      • Jan 2021 - Feb 2021

      1. Learned about processing of production alcohol from molasses into ethanol 2. Researched and made a report about “Recalculate Sizing Flowmeter Orifice FI 518 using betha ratio on Distilation Unit” 3. Participated on troubleshooting and maintenance on Turn Around Program 2021 4. Learned about sizing control valve 5. Learned how to maintenance plant including calibrating and troubleshooting 1. Learned about processing of production alcohol from molasses into ethanol 2. Researched and made a report about “Recalculate Sizing Flowmeter Orifice FI 518 using betha ratio on Distilation Unit” 3. Participated on troubleshooting and maintenance on Turn Around Program 2021 4. Learned about sizing control valve 5. Learned how to maintenance plant including calibrating and troubleshooting

    • Indonesia
    • Oil and Gas
    • 700 & Above Employee
    • Student Internship
      • Feb 2020 - Apr 2020

      - Memahami proses pembuatan LNG - Kalibrasi Transmitter - Maintenance Butterfly Valve - Maintenance Safety Alarm pada Field LPG - Memahami Control system pada Condensate Surge Drum - Memahami proses pembuatan LNG - Kalibrasi Transmitter - Maintenance Butterfly Valve - Maintenance Safety Alarm pada Field LPG - Memahami Control system pada Condensate Surge Drum

    • Indonesia
    • Oil and Gas
    • 700 & Above Employee
    • Student Internship
      • Mar 2018 - Mar 2018

      1. Researched and made a report about “Safety System on Furnace 31-F-101” 2. Learned about instrument documents (P&ID, PFD, Cause & Effect Table, Logic Diagram) 3. Instrument devices calibration & maintenance 4. Learned about Naptha Hydrocreaking Treatment Unit (NHT) 1. Researched and made a report about “Safety System on Furnace 31-F-101” 2. Learned about instrument documents (P&ID, PFD, Cause & Effect Table, Logic Diagram) 3. Instrument devices calibration & maintenance 4. Learned about Naptha Hydrocreaking Treatment Unit (NHT)

Education

  • PEM Akamigas
    Sarjana Terapan, Teknik Instrumentasi Kilang
    2017 - 2021
  • SMAN 1 karanganyar
    MIPA
    2015 - 2017

Community

You need to have a working account to view this content. Click here to join now