Myo Min Oo
Project Engineer at BBR Network- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
BBR Network
-
Switzerland
-
Construction
-
1 - 100 Employee
-
Project Engineer
-
Nov 2022 - Present
-
-
-
Fujita Corporation Japan
-
Construction
-
100 - 200 Employee
-
Site Engineer
-
Sep 2020 - Dec 2022
•In-charge for site construction works( Foundation, Earthworks, Station Structures , Structural & Architectural Works of Buildings and Box Culverts), monitor all processes & quality check and observe health and safety standards & compiling reports for different stakeholders. •Coordinate with public around site, local authorities and irrigation department of government. •Manage and direct assigned Sub-Contractors to complete rebar & concrete placement works before raining season when construction works could be difficult. •Report significant issues and project status to senior management in order to facilitate actions necessary to meet project objectives. •Prepare micro schedules based on master schedules. •Ensure the works are 100% compliant with method of statement and project specifications. •Discovered 4 design flaws in ongoing building works, preventing unnecessary arguments with client. •Supervise Sub-Contractors to ensure the work quality by conducting regular inspections on the works. •Prepare Inspection Request documents/ RFI and ensure all the inspections are completed for submission to client. •Prepare Inspection Test Plan and issue Non-Conformance Reports when proposed works fail to meet project quality standards. •Assist engineering team in preparing method of statement and production of shop drawings for station platform construction. •Supervise the Field Density Test and Falling-Weight Deflectometer Test for land grading works and embarkment filling works. •Monitor and supervise the sheet pilings and strutting works for foundation. •Prepared detailed risk assessment plans for rail pile & precast pile installation works. •Hand over completed works to client engineers and coordinate with QS team for necessary rectification works. •Conduct joint inspections with QS team and ensure all the works are completed for the claims. •Lead a team of 4 site engineers , managing and completing 4 station buildings. Show less
-
-
-
SUNTAC Technologies
-
Myanmar
-
Civil Engineering
-
1 - 100 Employee
-
Site Engineer
-
Jun 2019 - Sep 2020
•Supervised direct workers, sub-contractors and work activities.•Operated civil work teams and carry out the construction of drainages, concrete road pavements and water storage facility structures along 70km pipeline route.•Prepared required lift plans and work permits and submitted to main-contractor and stakeholders.•Supervised the piling works(Jack-In) and issued IR , RFI & third party test schedules.•Checking the soil report, making sure the accuracy of the locations of driven piles and reporting to the superiors.•Scheduled the production rate with available machines in the site.•Identified potentially unsafe acts & work areas and exercise preventive/ corrective measures.•Monitored and inspected all the foundation works undertaken by Sub-Contractors to ensure structural soundness.•Responsible for finishing works such as plastering, ceiling works, painting , tiling , marble works and landscaping.• Delivered signage installation works one month ahead of the schedule , save company time & money.•Dealt with steel erection sub-contractor and report erection progress to the management.•Coordinated with M&E Department to keep projects more organized and cost-effective.•Supervised precast components production and erection works.•Carried out third party inspections for concrete compressive tests.•Investigated the technical designs and drawings for discrepancies ,carried out trial mix, maintained and updated design mix.•Identified 3 hidden major design defects in precast drawings .•Evaluated non-conforming products and decided necessary recasting, re-sawing and repair.•Trained 100+ workers to be adequately skilled and experienced in following and understanding correct production methods. Show less
-
-
Site Engineer
-
Jun 2018 - Jun 2019
Supervised workers, sub-contractors and work activities.Led the whole section which include three excavators, one road roller compactor (10Ton) and the workforce of approximately 30 labors. The site operated mainly in laying ductile iron pipes (700DN-1000DN) by mechanical joints. Foreseeing the materials needed for the site and proper supervision on the operators, sub-contractors and labors are basic responsibilities.Led the civil work team and carry out the construction of drainages, concrete road pavements and water storage facility structures. Show less
-
-
Education
-
Technological University Hmawbi
Bachelor of Engineering - BE, Civil Engineering