Myles Daniel
Senior Director - EPC Director at Star of the South- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Project Management Professional (PMP)
Project Management InstituteJan, 2016- Nov, 2024
Experience
-
Star of the South
-
Australia
-
Wind Electric Power Generation
-
1 - 100 Employee
-
Senior Director - EPC Director
-
Mar 2022 - Present
EPC Director for Australia's first proposed offshore windfarm, Star of the South. EPC Director for Australia's first proposed offshore windfarm, Star of the South.
-
-
-
Ørsted
-
Denmark
-
Renewable Energy Power Generation
-
700 & Above Employee
-
Project Director - Coastal Virginia Offshore Wind
-
Oct 2017 - May 2021
Project Director for the offshore scope of Coastal Virginia Offshore Wind project, the first offshore wind farm in US Federal waters. The project was successfully constructed and commissioned in 2020 during the onset of the COVID-19 pandemic, and handed over to the customer Dominion Energy on-time in October 2020. Project Director for the offshore scope of Coastal Virginia Offshore Wind project, the first offshore wind farm in US Federal waters. The project was successfully constructed and commissioned in 2020 during the onset of the COVID-19 pandemic, and handed over to the customer Dominion Energy on-time in October 2020.
-
-
-
DONG Energy
-
Denmark
-
Oil and Gas
-
700 & Above Employee
-
Burbo Bank Extension Offshore Windfarm - Deputy EPC Director
-
Nov 2014 - Jul 2017
Deputy EPC Director for the Burbo Bank Extension 258MW Offshore Windfarm project, with focus and responsibility for the transmission system. Finished the project as EPC Director in the final stages including hand-over to Operations.
-
-
Westermost Rough Offshore Wind Farm - Onshore Electrical Project Manager
-
Jul 2013 - Oct 2014
Electrical Project Manager responsible for the onshore electrical infrastructure delivery to the Westermost Rough Wind Farm. This includes the 150kV and 275kV export cables, 150kV/275kV onshore substation, and grid connection to National Grid.
-
-
Anholt Offshore Wind Farm - Electrical Project Manager
-
Nov 2011 - Mar 2014
Electrical Project Manager for the Anholt Offshore Wind Farm Development. The project consisted of the construction of 111 offshore wind turbines between Djursland and the island of Anholt in the Kattegat off the coast of Denmark, with a total park capacity of 400MW. The role's overall responsibility included acting as Engineer on both the Array Cable Supply and Installation contracts, SCADA systems, 34kV Switchgear and grid connection.
-
-
Offshore Modification Projects - Project Manager
-
Dec 2009 - Oct 2011
Project Management of a portfolio of modification projects for the Siri Offshore Oil Platform in the Danish sector of the North Sea. Duties included project planning and reporting, scoping and management of technical issues with sub-contractors and consultants.
-
-
-
ICS Triplex Silvertech
-
Oil and Gas
-
1 - 100 Employee
-
Electrical/Controls Project Engineer
-
2007 - 2009
Project Engineer responsible for panel design, PLC software programming, procurement, factory acceptance testing and site commissioning of Emergency Shutdown and Process Control Systems to the Offshore Gas and Onshore Process industries. Project Engineer responsible for panel design, PLC software programming, procurement, factory acceptance testing and site commissioning of Emergency Shutdown and Process Control Systems to the Offshore Gas and Onshore Process industries.
-
-
-
Aurecon
-
Australia
-
Design Services
-
700 & Above Employee
-
Electrical/Controls Engineer
-
2003 - 2007
Design and commissioning of Electrical and Control Systems for BMA’s (BHP Billiton Mitsubishi Alliance) Hay Point Coal Terminal Phase 1 and 2 Expansion; Seconded to EPC Principal Contractor on Tarong North Power Station Project (1 x 450MW Coal Fired); Preparation of tendering material and specifications to the Huntly Power Station control system replacement project. Design and commissioning of Electrical and Control Systems for BMA’s (BHP Billiton Mitsubishi Alliance) Hay Point Coal Terminal Phase 1 and 2 Expansion; Seconded to EPC Principal Contractor on Tarong North Power Station Project (1 x 450MW Coal Fired); Preparation of tendering material and specifications to the Huntly Power Station control system replacement project.
-
-
-
-
Work Experience
-
2000 - 2001
-
-
Education
-
The University of Queensland
Bachelor, Engineering (Electrical) -
The Southport School