Muzammil Shehzad

Manager Proposals at Elite Engineering (Pvt.) Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Lahore District, Punjab, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Construction
    • 200 - 300 Employee
    • Manager Proposals
      • Apr 2018 - Present

      Projects Won: EPC Extension of Oil Storage Depot at Machike & Shikarpur – Shell Pakistan Relocation of Terminal Piping from Underground to Above ground at Chakala & Tarujabba Oil Storage Depot – Shell Pakistan Relocation / Modification of Piping at Shikarpur Oil Storage Depot – Shell Pakistan Design Wetting, Supply & Construction of Pipeline (Approx.. 8.2 km) from PARCO to PSO Terminal Mehmood Kot – PSO Pakistan Engineering, Procurement, Construction & Commissioning of Bulk Oil Depot (Capacity: 12,676 M. Tons) at Hub, Baluchistan – Gas & Oil Pakistan Design & Construction of Honda Showroom at Sheikhupura. (Approx. Area 88,000 SFT) Supply & Installation of Auto Tank Gauging System at Bulk Oil Depot Mehmood Kot – Gas & Oil Pakistan Design & Construction of Fuel Retail Outlets (14 No’s) at Misc. Locations in Punjab – Gas & Oil Pakistan Show less

    • Pakistan
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Manager Proposals
      • Dec 2015 - Apr 2018

      Projects Won: Supply, Fabrication and Erection of Steel Structural Bridge (Yusaf Wala to 1230 MW CFPP Sahiwal). (Value - 275 Million PKR) Supply, Fabrication and Erection of Product Storage Tanks (5 No's) for Attock Petroleum Limited - Mehmood Kot Terminal. (Value - 200 Million PKR) 2 No's HSD Fixed Roof Tanks Dia 24 m x Height 18m. 2 No's PMG Floating Roof Tanks Dia 15 m x Height 18m. 1 No. Fire Water Fixed Roof Tank Dia 12m x Height 18m. Supply, Fabrication & Installation of Plant Piping at Treat battery Plant, Faisalabad Show less

    • Pakistan
    • Construction
    • 200 - 300 Employee
    • Senior Engineer Proposals
      • Apr 2013 - Dec 2015

      Job Responsibilities:  To understand / prepare the detailed requirements of the job form ITB /RFQ documents.  To transform work quantities into project cost by effectively establishing CBS, project man-hours and applying unit rates of various inputs and finally preparation of project overall CBS sheet.  To co-ordinate with customer through Business Development department regarding due clarifications, requirements and other enquiry related matters and assist in meeting targets.  To shortlist suppliers & sub-contractors based on technical & financial comparative statements.  To coordinate and follow up with Procurement department for obtaining updated pricing information against the BOQ of inquiries, complying with specifications and drawings.  To coordinate with other departments of the company as and when required for project support and Proposal compilation. Projects Won:  Fabrication & Installation of Steel Structural Bridges SAMBU JV (Value - 211 Million PKR)  Runh Power 150 TPH Boiler (Value – 760 Million PKR)  Installation of ZKR MDF Plant (Value – 650 Million PKR)  15 MW Coal Fired Boiler ICI (Value – 81 Million PKR)  18 MW Coal Fired Boiler ICI (Value –162 Million PKR)  30 MW Coal Fired Boiler D.G. Cement (Value – 125 Million PKR)  Design, Fabrication and Supply of Skid Mounted Vertical Gas Scrubbers and Horizontal Filter Separators 12 Nos. (SSGC)  Design, Fabrication and Supply of Skid Mounted Vertical Gas Scrubbers and Horizontal Filter  Separators 03 Nos. (SSGC)  Design, Fabrication and Supply of Water Storage Tank  Design, Fabrication and Supply of Instrument Air Vessel Show less

    • Planning Engineer
      • Feb 2012 - Apr 2013

      Projects: 1. 26.5MW Power Plant at Ibrahim Energy PG-1 Phase III. 2. 13.5Km Gas Pipeline (8” Dia) from Ratana to Meyal II. A 75 Days Fast Track Project in Rocky Area. (OPL formerly owned by OXY). Job Responsibilities:  Prepare and update project schedules.  Progress Measurement and Reporting  Prepare weekly status report and bottleneck summary.  To estimate cost, determine budget and control cost of project activities.  Coordination with subcontractors regarding site progress and issues. Show less

    • Saudi Arabia
    • Oil and Gas
    • 700 & Above Employee
    • Planning Engineer
      • Dec 2010 - Jan 2012

      Worked as “Planning Engineer” at: SIPCHEM INFRASTRUCTURE PIPELINES PROJECT 2011-12, Jubail Industrial City, KSA. An EPC LSTK Project having 5.5Km pipeline including A-106 Gr-B and RTR Piping. Major activities included but not limited to:  Preparation of Project Key Deliverables  To prepare and update project schedules.  Progress Measurement and Reporting  To prepare weekly status report and bottleneck summary.  To estimate cost, determine budget and control cost of project activities.  Preparation of BOQ and raising requirements for procurement of Material. Worked as “Project & Planning Engineer” at: IBN RUSHD (an affiliate of SABIC) Aromatics Turnaround 2011, Yanbu Industrial City, KSA A 15 days shutdown in Aromatics area, having 4 Reactors in two towers. Major activities included but not limited to:  Lifting & replacing of surge port  Repair of Riser Pipe  Replacement repair of scallops  Replacement & repair of riser support (stool)  Repair of CTP’S (Catalyst transfer Pipes)  Repair of trickle valves & steam distribution header  To prepare and update project schedules.  Progress Measurement and Reporting  To prepare daily progress report and bottleneck summary. SADAF (an affiliate of SABIC) MTBE Turnaround 2010, Al-Jubail Industrial City, KSA A 25 days shutdown in MTBE area, having Reactor & Regenerator as major parts and confined space entry was critical. Major activities included but not limited to:  Replacement & repair of Stripper Grids  Replacement & repair of Grid Supports  Repair of riser pipe  Repair of steam distribution ring  Replacement of steam distribution header & associated nozzles  Repair of reactor cyclone  Replacement of Trickle Valves  Planning and monitoring of Project activities.  Prepared daily and weekly reports.  Coordination with Client to resolve site issues.  Coordination between project execution teams for arrangement of resources. Show less

    • Planning Engineer
      • Aug 2008 - Dec 2010

      Worked as “Planning Engineer” at Projects: 1. 225MW Combined Cycle Power Plant Narowal Pakistan (HUBCO POWER PLANT) (MAN DIESEL SE: Power Plants ( ) Germany 2. Supply & Fabrication of 402 m³ Dry Condensate Storage Tank and 112 m³ Wet Condensate Storage Tank (ENI Pakistan – Bhit Gas Field) Job Responsibilities:  To prepare and update project schedules.  Progress Measurement and Reporting  To prepare weekly status report and bottleneck summary.  To estimate cost, determine budget and control cost of project activities.  Coordination with subcontractors regarding site progress and issues.  Updating records and maintaining project documents. Show less

Education

  • University of Engineering and Technology, Taxila
    Engineer’s Degree, Mechanical
    2004 - 2008
  • Government College University (GCU), Lahore
    FSc. Pre Engineering, Engineering
    2002 - 2004

Community

You need to have a working account to view this content. Click here to join now