Mustafa Wali

MEP Manager at Asqalan Construction And Development LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Abu Dhabi Emirate, United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Construction
    • 1 - 100 Employee
    • MEP Manager
      • Oct 2022 - Present

      -Member in UAE – Trakhees‐ACCID‐20321‐Building Regulation & Design Guidelines‐MEP. -Dealing with all authorities and services provider ADDC, ADSSC, ADCD, ADM, ADNOC, TABREED, ETISALAT, STREEM, DEWA, IMPOWER... . With full knowledge of all the requirements of each. -Experience in project follow up and handling during the defect liability period (DLP) until obtaining the performance certificate. Testing and Commissioning for fire & life systems with wide knowledge for sequences of operation, and all required interfaces and integrations. (Firefighting, fire alarm, public address & voice evacuation, CO, central battery and access control.) -Testing and Commissioning for HVAC system, gas system, swimming pool and elevators. -Handing over the project to the client with all approvals from Civil Defense and all authorities.... with all required certificates BCC and BOC. -Review and study tender documents with issuing any necessary clarification or instruction if an ambiguity or discrepancy is found in the documents. -Manage all engineering work. (shop drawings, material technical submittal, pre‐qualification for subcontractor, method of statement, agreements, value engineering, variation, technical meeting, logs, project documentation, and coordination with clients, consultant, authorities and site team.) -Good in negotiation. -Lead the project from scratch to end and deliver the project on time. Show less

    • Project Manager
      • Mar 2020 - Oct 2022

      TRAKHEES DUBAI ACCID-20321Projects1-COMMERCIAL BUILDING For Mr. RASHED AL-MANSOURI.2-COMMERCIAL BUILDING For Mr. FALAH AL-AHBABI.3-COMMERCIAL BUILDING For Mr. KHALED AL-MUHIRI4-CICPA – ASAB 22 Facilities 5-CICPA – Buhasa 22 Facilities 6-CMW‐ Zaied Military City 69 7-CMW – Hamra 288-Emirati Housing Villas The projects are residential building (3 basements + GF + 9-storey typical + Roof and Top Roof).-lead the project from scratch to end on time.-Review and study tender documents and drawing.-Prepare MEP Engineering Logs.-Prepare Mechanical Shop Drawings (HVAC, Water Supply, Drainage, Storm Water), MEP Coordination, Builder Works, RCP and As Built Drawings.-Review Material technical Submittal.-Prepare Required Mechanical Calculation (A/C load and Ventilation Calculation, ESP & Pumps hydraulic Calculation).-Attend Technical Meeting with Client and Consultant.-Testing &Commissioning.-Preparing MEP snag list, following with CIVIL snags and handing over to client.-Quantities Surveyor, Material Take-off& cutting list.-Review monthly payment with consultant.-Installation and supervision of HVAC works, Water supply & Drainage works, Firefighting works and Gas system.-Inspect the work quality at the site and also insure proper safety measures are followed.-Appointing Subcontractor. Show less

    • United Arab Emirates
    • Construction
    • 1 - 100 Employee
    • Mechanical Project Engineer
      • Mar 2016 - Mar 2020

      Projects: 1-ROVE LAMER HOTEL (LA MER, Dubai) 2-PALM TOWER HOTEL & RESIDINTIONAL (Palm Jumeira, Dubai.) 3-HORIZON TOWERS (AL Reem Island, City Of Light, Abu Dhabi.) Working as Mechanical Project Engineer. Responsibilities -lead the project from scratch to end on time. -ability to manage engineering work, material order and work progress and make each of them serve the last. -Review and study tender documents and drawing. -Prepare Mechanical Shop Drawings (HVAC, Water Supply, Drainage, Storm Water), MEP Coordination, Builder Works, RCP and As Built Drawings. -Prepare Required Mechanical Calculation (A/C load and Ventilation Calculation, ESP & Pumps hydraulic Calculation). -Testing &Commissioning. -Preparing MEP snag list, following with CIVIL snags and handing over to client. -Coordinate with sub-contractor’s work. -Installation and supervision of HVAC works, Water supply & Drainage works, Firefighting works and Gas system. --Inspect the work quality at the site and also insure proper safety measures are followed. Show less

    • IT Services and IT Consulting
    • 700 & Above Employee
    • Mechanical Engineer
      • Feb 2012 - Mar 2016

      Projects: 1-HARAMAIN HIGH SPEED RAIL (Makkah, Saudi Arabia.) 2-AL RAJHI MEDICAL COLLAGE (Qassim, Saudi Arabia.) 3-CORRICTIONAL FACILITIES (Al Taif, Saudi Arabia.) Working As Mechanical Site Engineer. -Installation of GI, PI&MS duct with all accessories and test. -Installation of CHW pipes with insulation and test. -Installation of Cooling Tower, Chillers, Pumps, PHEX, AHU/FAHU, Ecology unit, FCU and Fans with hook-up (valve assembly/PICV). -UFC system, Certified from REHAU to installing all under floor heating/Cooling pipe system and test it. -Follow water supply system installation, insulation and test. -Follow drainage system underground /above ground installation and test. -Installation of sanitary appliances, flushing arrangements & sanitary accommodation. -Installation of all water supply and drainage pumps. -Installation all F.F systems Sprinkler system, Clean Agent FM200 system, Pre-action system & Deluge foam system. -Preparation of daily works schedule. -Material Take-off. -Testing &commissioning for all mechanical services. -Thermal Energy Storage System Components installation Such As: PCM tank (phase change material tank), main circulation pumps erection and headers installation. -Installation of GRP for laboratories exhaust. -Responsible for all builders work in all site area. -Support the procurement and purchase of materials. -Day per day operation and building inspection. Show less

Education

  • Mansoura University
    Bachelor of Engineering - BE, Mechanical Engineering
    2005 - 2010

Community

You need to have a working account to view this content. Click here to join now