Mustafa Coşkun
Management Consultant & Plant Operation Manager at Gp Kompozit A.Ş- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
İngilizce -
-
Japonca -
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
Associate Certified Coach ( ACC )
International Coach FederationOct, 2018- Sep, 2024
Experience
-
Gp Kompozit A.Ş
-
Türkiye
-
Motor Vehicle Manufacturing
-
1 - 100 Employee
-
Management Consultant & Plant Operation Manager
-
Jun 2021 - Present
GP Kompozit have welding, plastik injection, fiber and pleksi lazer, CNC machining, poliüretan, polyester production capability. Exports its product to 36 countries. Reporting directly company owner. Manage operational departments including manufacturing, quality, procurement, logistics, planning, product engineering, and maintenance teams; Responsibility for the financial performance of the facility through the execution of the operational plan and prepare yearly budget for plant Accurate planning, forecasting, analysis of variances, and implementation of corrective actions to achieve planned results. Also improved production capability by lean manufacturing technics. Manage the quality output of the manufacturing and business processes with the ability to meet targets or modify activity and behaviour if off target; Show less
-
-
-
Donghee Otomotiv
-
Türkiye
-
Motor Vehicle Manufacturing
-
1 - 100 Employee
-
Production Manager
-
Jan 2016 - Jun 2021
Donghee Automotive is a Korean-owned company operating in the automotive sector is producing automotive spare parts for Hyundai Turkey. Plastic fuel tank, front and rear suspension, brake and clutch pedal are mainly produced . - There are welded manufacturing (made by OTC, HYUNDAI Robots and 118 pcs in the company), cataphoresis coating (paint shop), Blow Molding Machine (used in the production of plastic fuel tanks) and assembly lines for all section. - There are 5 engineers and 107 blue collar employees in the production department. Production is carried out in 3 shifts 6 days a week. Show less
-
-
-
Elmacık Su
-
Türkiye
-
Food & Beverages
-
1 - 100 Employee
-
Production and Maintenance Manager
-
Feb 2014 - Jan 2016
Water bottling factory has 3 different lines with full automation. I took on the task of production and maintenance activities. Maintenance activities were carried out for the continuous operation of the lines. New project were carried out with the companies cooperating abroad (Masafi) Improvement suggestions of 500.000 TL have been given in the production of packaging and PET bottles. Water bottling factory has 3 different lines with full automation. I took on the task of production and maintenance activities. Maintenance activities were carried out for the continuous operation of the lines. New project were carried out with the companies cooperating abroad (Masafi) Improvement suggestions of 500.000 TL have been given in the production of packaging and PET bottles.
-
-
-
ASAŞ Alüminyum Sanayi ve Ticaret A.Ş.
-
Türkiye
-
Mining
-
700 & Above Employee
-
Special Manufacturing Dept. Section Manager
-
Dec 2012 - Feb 2014
Manage the Aluminium bending, CNC machining and welding process with 70 pcs worker's. Follow up new project and prepare quality document. Also preparations for audits performed by railway customer's . Cellular manufacturing studies in aluminum welded manufacturing. SMED studies on CNC lines and reduce setup time. Project 1. Reduce Cycle Time and Setup Time at CNC line, 2. Reduce Labour Cost at Blow Pipe Production, 3. Improve Robot Welding Production Productivity, 4. Improve Train Door Frame Production Productivity, Show less
-
-
-
Sango Otomotiv Ürünleri Sanayi ve Ticaret A.Ş.
-
Türkiye
-
Automotive
-
1 - 100 Employee
-
Production & Engineering Dept. Chieff Ass.
-
Jan 2006 - Dec 2012
Setup and manage Sango T.I. the tandem pres line, tubing and heat treatment line. Improve GSPH and design and production responsibility of dies , fixtures Manage the pipe production, engineering, quality. Also manage the new project preparation and EN 16949, PPAP Prepared time and method study. Measure and evaluate production line efficiently, make continuous improvement. Manage the new project preparation for pres and tube lines (basic plan, work plan, layout, setup new machine, investment plan, manage the project budget) Complated Corolla exhaust project. Prepared layout and arc welding condition at robot welding line.Auditor for arc welding lines and spot welding lines Project 1. SMED on pipe cutting line. Reduce change over time from 40 minutes to 20 minutes 2. Heat treatment line AEQ activity . Reduce not good parts cost. NG parts cost from 30€/week to 5€/week 3. Improve pres line Gross Strok Per Hour from 276 to 514 part. (% 86) 4. Pres line Abnormal condition management system and reduce not good parts ratio from %0,6 to %0,1 5. 595L Toyota Verso I.P. Pres Metal dies proces and manufacturing plan 6. Establishment sango A.Ş. 300 tons power tandem pres line 7. 2007 Toyota Auris Egzoz&Muffler welding project 8. Toyota Corolla Verso 377W Egzoz welding project 9. Toyota Corolla Verso DPF Egzoz welding project Show less
-
-
-
Başak Traktör
-
Türkiye
-
Machinery Manufacturing
-
1 - 100 Employee
-
Production Planning Engineer
-
Oct 2004 - Jan 2006
Production Planning, Setup MRP System and ISO 9001 Production Planning, Setup MRP System and ISO 9001
-
-
Education
-
Sakarya Üniversitesi
Doctor of Philosophy - PhD, Operations Management and Marketing -
İstanbul Teknik Üniversitesi
Master of Business Administration - MBA -
Sakarya Üniversitesi
Master of Science (MSc), Industrial Engineering -
Sakarya Üniversitesi
Bachelor of Science (B.Sc.), Sakarya Üniversitesi, Mechanical Engineering