Musab Alkayed, PE , MBA

Plant Manager at MGBBC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Palestinian Authority, PS
Languages
  • English Full professional proficiency
  • Arabic Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Ismael Saifan, PE

If you have the opportunity to work with Musab, consider yourself lucky! Musab has been a pleasure to work with during his time at Black & Veatch. Musab was assigned to investigate the fire safety requirements of the International Building Code and develop a training program to provide to effected stakeholders. Musab was able to step in from the first day and made an immediate impact on the team. He was very proactive in studying the fire safety requirements, providing input on the recommendation report, and developing a workshop training on fire safety. It is a pleasure to work with Musab, and if you have the opportunity, take it without thought.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Monitoring & Evaluation
    Scholarship, PS
    Apr, 2016
    - Nov, 2024
  • Low Voltage and Medium Voltage Variable Frequesncy Drives
    Toshiba International Corporation
    Oct, 2009
    - Nov, 2024
  • Low Voltage and Medium Voltage softstarters
    Rockwell Automation
    Sep, 2009
    - Nov, 2024
  • Mechanical Engineer
    نقابة المهندسين الأردنيين Jordan Engineers Association
    Jun, 2006
    - Nov, 2024
  • Proffesional Engineer
    Engineers Association, Palestine
    Dec, 2016
    - Nov, 2024

Experience

    • Palestine, State of
    • Food & Beverages
    • 1 - 100 Employee
    • Plant Manager
      • Mar 2017 - Present

    • Japan
    • Civic and Social Organizations
    • 700 & Above Employee
    • Senior Consultant
      • Jan 2017 - Mar 2017

      JICA Consultant Team, Palestinian Industrial Estates & Free Zones Authority Project JICA Consultant Team, Palestinian Industrial Estates & Free Zones Authority Project

    • Germany
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • General Manager - GRADE Refrigeration Pakistan
      • Sep 2016 - Dec 2016

  • Self Employed
    • Palestinian Territory
    • Individual Consultant
      • Jun 2016 - Sep 2016

      MEP, Fire Safety and Protection, Water/Wastewater Systems, Oil and Gas MEP, Fire Safety and Protection, Water/Wastewater Systems, Oil and Gas

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Mechanical Project Manager- IBC Implementation Project/INP II
      • Oct 2015 - Jun 2016

      • Member of a seven person team responsible for implementing of the International Building Code on USAID projects in Palestine.• Interviewed effected parties including Ministries, Project Partners, Engineer’s Association, and local consultants to determine feasibility of applying the IBC in Palestine.• Reviewed local design practices including NFPA, European Standards, Jordanian Standards, and Department of Civil Defense requirements. • Developed presentation material for fire protection according to IBC 2012 as well as Mechanical, Electrical and Plumping. • Helped develop and provided a workshop that trained effected stakeholders on the basics of the International Building Code. Show less

    • Water O&M Manager - INP II
      • Oct 2013 - Sep 2015

      • Responsible for initiating and managing milestone attainment within predefined budget limits for this work ($5,000,000) and future amendments.• Applied decisions coordinated with West Bank Water Department management and within the WBWD framework of established policies with the objective of improving WBWD performance within the scope of the O&M services• Provided additional O&M support including:• Advisory and operational assistance• Advisory and preventive maintenance assistance• Advisory and corrective maintenance assistance• Procurement of critical spare parts and procurement of maintenance tools and equipment• Training and certification of operational and repair staff• advisory services for daily operation of the Computerized Maintenance Management System• Developed the tasks required for proper maintenance practice for the water systems according to the manufacturer recommendations and the O&M manuals. • Prepared Emergency Response Plan for WBWD. • Finalized the project in accordance with pre-approved Project Exit Strategy for the O&M activities funded through USAID Show less

    • Operation and Maintenance Technical Leader - INPII
      • Nov 2011 - Sep 2013

      • Ensured the CMMS contained the requirements on planned preventive repair and maintenance of equipment components and all the required materials and sources.• Liaison with personnel at production units and agreed to joint maintenance data recording and improvement activities.• Carried out or participated in planning and coordination of compliance with maintenance requirements and ensure the feedback on system efficiency.• Input maintenance data into CMMS System and ensured control over the implementation of planned preventive maintenance.• Contributed to the development and upgrading of CMMS System on all relevant production units.• Recommended on modification of maintenance data base in order to optimize maintenance activity.• Compiled and submitted for review reports completed in the standard form and statistic surveys in order to improve maintenance processes and projects.• Provided consulting expert support to ensure overall usage of the system and acquire new maintenance skills.• Trained and improved work skills of my subordinate personnel within the department and provide appropriate knowledge development for my team. Show less

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Senior Electro-Mechanical Engineer - INP I
      • Jul 2010 - Oct 2011

      • Responsible for implementing a computerized maintenance management system for the WBWD O&M program whose goal is to provide sustainable 24x7 operations for the refurbished well stations and booster pumping stations. • Provided assistance to the O&M Manager in the development of a master plan of WBWD infrastructure to meet current and future growth demands. • Managed CMMS activities, managed work plans, and resolved technical issues in the office and field. • Provided technical strengthening of WBWD/MWH staff for preventative maintenance. • Ensured that all project documentation sent to Owner and Beneficiaries. • Represented MWH and monitored training activities of WBWD. • Represented MWH during commissioning and startup. • Contributed to the technical strengthening of existing staff and worked with them on managing existing O&M program, following-up with the existing staff on ongoing rehabilitation assessment. • Contributed in developing a systematic database to store and process information on WBWD projects, water resources and bulk water supply to communities. • Contributed in preparing and updating work plans for the O&M of water supply systems in close co-ordination with future plans that will be implemented. • Assisted in following up and analyzing technical issues relevant to O&M and day-by-day office activities. • Developed and implement CMMS software program. • Provided recommendations for necessary O&M equipment for sustainability of the USAID funded equipment. Show less

    • 1 - 100 Employee
    • Consultant
      • Feb 2009 - May 2010

    • Greece
    • Construction
    • 700 & Above Employee
    • Instrumentaion Site Engineer
      • Aug 2006 - Feb 2009

      • Arranged, Planned and directed the delivery of material and equipment. • Reviewed fiber optic networks installation and testing. • Performed instrumentation equipment and devices installation and loop checking. • Set up detail plans for the interaction of work operations. • Established work baseline to insure that objectives are met and also discussed with engineers from all disciplines the testing of completed activities. • Arranged, Planned and directed the delivery of material and equipment. • Reviewed fiber optic networks installation and testing. • Performed instrumentation equipment and devices installation and loop checking. • Set up detail plans for the interaction of work operations. • Established work baseline to insure that objectives are met and also discussed with engineers from all disciplines the testing of completed activities.

    • Armed Forces
    • 1 - 100 Employee
    • Electro Mechanical Engineer
      • Aug 2004 - Aug 2006

      • Member of a four member team that designed an unmanned Autonomous Submarine. • Developed the implementation process that included: fabrication of the body, procurement of the control equipment, and testing the submarine. • Member of a four member team that designed an unmanned Autonomous Submarine. • Developed the implementation process that included: fabrication of the body, procurement of the control equipment, and testing the submarine.

Education

  • International Business School of Scandinavia
    Master of Business Administration - MBA, Strategic Management
    2018 - 2020
  • Jordan University of Science and Technology
    BSc, ElectroMechanical Engineering
    2001 - 2006
  • IS School
    High School, Scientific Stream
    1996 - 2000

Community

You need to have a working account to view this content. Click here to join now