Murtaza Ali, P.Eng.

Project Manager, P.Eng at Stratum Logics
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Canada, CA
Languages
  • English Full professional proficiency
  • Urdu Native or bilingual proficiency
  • Hindi Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Primavera P6 Essential Training
    LinkedIn
    May, 2019
    - Nov, 2024
  • Procore Certified: Engineer
    Procore Technologies
    May, 2019
    - Nov, 2024
  • Procore Certified: Project Manager (Quality & Safety)
    Procore Technologies
    May, 2019
    - Nov, 2024
  • PowerPoint 2013 Essential Training
    LinkedIn
    Dec, 2017
    - Nov, 2024
  • Word 2016 Advanced Tips and Tricks
    LinkedIn
    Mar, 2017
    - Nov, 2024
  • Creating an Effective Resume (2011)
    LinkedIn
    Feb, 2017
    - Nov, 2024

Experience

    • Canada
    • Civil Engineering
    • 1 - 100 Employee
    • Project Manager, P.Eng
      • Jun 2017 - Present

      • Managed construction activities by analyzing construction progress, determining critical path, reinforcing compliance to HSSE policies, administering change management process to protect company and project interests.• Developed construction execution strategies to align all functional stakeholders on expectations & requirements. • Analysed project specific requirements according to codes and standard to developed construction execution plans with Design Group and resolved construction challenges by implementation of safe design practices.• Developed engineering solutions and presented detailed reporting to engineering groups for joint acceptance.• Review and analyse construction drawing and mitigate any construction challenges with site crew by applying standard procedures and methods while taking into consideration financial, social and environmental effects on project.• Develope redline drawings to reference any deviation from standard procedures and design, based on RFls, FCNs (field change notices) and CCNs (contract change notices).• Performed preliminary engineering designs of access roads and pads with geosynthetic components like NPA geocells.• Originate design calculation excel sheet based on formulas and specification provided by NPA Geocells supplier.• Performed site assessments upon client request to investigate structural integrity and failure and writing technical report to provide detailed assessment outcome with recommended solutions.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Project Engineer In Training (EIT)
      • Jun 2013 - Aug 2016

      • Analyzed bid documents to identify project requirements & non-standard specifications that vary from internal company's specifications to ensure that they are properly addressed.• Specified project equipment requirements after analyzing the project scope of work and design. Generated construction and maintenance execution plans • Prepared daily, weekly and monthly progress reports of ongoing site construction for client and management.• Developed construction execution strategies to align all functional stakeholders on expectations & requirements. Interfaced with departmental leads throughout project life cycle to eliminate potential delays. • Managed construction activities by analyzing construction progress, determining critical path, reinforcing compliance to HSSE policies, administering change management process to protect company and project interests.• Worked with quality control to monitor and maintain quality standards for the project.• Coordinated with engineering to provide solutions for on-site construction problems.• Generated lift studies for complicated or critical lifts with cranes.• Coordinated with the procurement department to organize and manage all construction material delivery with a focus on implementing a Just-In-Time methodology.• Tracked and reported shortages by initiating material control procedures resulting in cost savings of more than $100,000.• Read and interpreted construction drawings and provided guidance and explanation to field craft personnel.• Performed quality control inspections which includes Foundation material inspection, Surveys for settlement, Roundness checks and Hydrotest monitoring• Generated, reviewed and coordinated RFI’s, change orders, field work packages.

    • Design Engineer In Training (EIT)
      • Jun 2012 - Jul 2013

      • Studied and analyzed applicable design codes to be used for project scope.• Designed and checked petrochemical tanks, foam piping systems and structural platforms according to applicable codes.• Sized pressure vents for normal and emergency operation conditions for storage tanks.• Worked with tank design programs and performed calculation checks on the results for verification.• Drafted drawings using AutoCad or Microsoft Microstation.• Performed a detailed stress analysis of various components and the development of advanced calculation models.• Facilitated to develop technical coordination among team members and also acted as a liaison with vendors and customers.

    • Geotechnical Engineer in Training
      • Jun 2011 - Aug 2012

      Completed 5 projects in 6 months: responsibilities include geo-technical investigation and construction inspection (Footing, Roofing, Waterproofing and Fireproofing), compaction testing (Engineering fill, sub-grade, and granular base, Trench Backfill and Foundation/Retaining Wall Backfill), concrete testing (Slump test) with/ without air, monitoring the cut and fill required on a job site, identifying/reporting engineering challenges:-- Inspect the soil to check for material suitability and report findings to site supervisors/clients: follow company protocol regarding inappropriate soil and administer recommendations/modifications.-- Supervise site crew (3 machine operators) to ensure adherence to plan, safety, and optimal productivity.-- Inspect native grounds during excavation to ensure the proposed subgrade is stable and hard for future construction: if substandard, inform site supervisor and propose appropriate allternative engineering solution (i.e. add 6 inches of crushed stone in trench excavation for site servicing).-- Read/interpret construction drawings to monitor, cut, and fill elevations; and perform calculations to establish different stake elevations using a laser device: verify specs to ensure accuracy.-- Respond to problems/challenges as they arise - i.e. soil material with high moisture content; low dry density - if ground has wet material and soft spots; and dewatering - if water table is encountered during excavation: resolve issues through active listening, observing, and problem solving.-- Ensure complete inspection: apply nuclear gauge/proof rolling techniques to ensure ground stability; bring in situ material to lab for proctor test; and cast concrete cylinder for compressive strength testing.

Education

  • Lakehead University
    Bachelors of Engineering, Civil
    2008 - 2010
  • Seneca College of Applied Arts and Technology
    Diploma, Civil Engineering Technologist
    2005 - 2008

Community

You need to have a working account to view this content. Click here to join now