Munsif Ali

In-charge Rotating Equipment at Descon Engineering Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Karāchi, Sindh, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Construction
    • 700 & Above Employee
    • In-charge Rotating Equipment
      • Oct 2012 - Present

      Client & Experience details: • Engro Polymer & Chemicals Maintenance Services Contract (As a I/C Rotary) March-2020 Till todate • PARCO Refinery Annual Turnaround 2020 (As a I/C Rotary) • Pakistan Refinery Limited Annual Turnaround 2019 (As a I/C Rotary) • Engro Polymer & Chemicals Maintenance Services Project 2017 ~ 2019 ( As a I/C Planning) • Uch Gas Field, OGDCL Annual Turnaround TA-2017 (worked as I/C Rotary) • Lotte Chemicals Pakistan, Dryer Replacement Job (worked as a I/C Rotary) • Fatima Fertilizer Ltd; annual turn around ATA-2017 (worked as a Lead Execution) • National Refinery Limited Karachi Steam turbine Job 2017 (worked as a Site Manager) • Pakistan Petroleum Limited PPL Adhi Gas Field ATA 2016 (worked as a Rotary Engineer) • Agri auto Stamping Company Press Installation Job 2016 (As a Execution Incharge) • National Refinery Limited Annual Turnaround 2016 (worked as a Planning engineer) • Fatima Fertilizer FFCL, Sadiqabad Annual Turnaround TA-2015 (worked as a Rotary Engineer) • Uch Gas Field OGDCL Pakistan Annual Turnaround TA-2015 (worked as I/C Rotary) • Nishat 9 MW Biogas & Coal Power Plant Lahore Pakistan 2014 ~ 2015 (I/C Rotary Equipment) • Fatima Fertilizer Ltd; annual turn around ATA-2014 (worked as a Rotary Engineer)  Maintenance (major overhauling) of reciprocating compressors (Double stage double acting make Ingersoll Rand), centrifugal compressor (Multistage BCH 256 make Hitachi), process steam turbines (Make Elloitt & Hayward Tyler) and pumps (Nuovo Pignone, Worthington) at PRL.  Maintenance (major overhauling) of multistage SHIN Nippon barrel type pumps, sulzer multistage pumps & liner replacement of reciprocating compressor (Howden Thomassen) at PARCO Refinery.  Assembling/installation of HTC 9MW steam turbine WT8765 (Rotor center, Steam path clearance, gap & contact of front and rear bearings, alignment of main oil pump, seals clearances etc) at Nishat Power Plant Show less

    • Trainee Mechanical Engineer
      • Jul 2010 - Sep 2012

      • Prepared the PM plans / Job plans of rotary equipments for Maximo. • Collect the complete data of all plant equipments from Maximo to entry in new SAP implemented in Sawan Gas Field. • Maintenance of Rotating Machineries & Stationary Equipments including piping erection • Performed RCFA, RCM, FMEA to determine root causes of Bad Actors • Developed solutions/recommendations for Bad Actors and other equipment based on root causes • Developed equipment maintenance strategies (PM & PdM), based on failure modes, that Optimize Equipment Run-Time and Reliability. • Prepared maintenance job plans of equipments. • Participation in conducting Root Cause Failure Analysis (RCFA) and implementation of recommendations. • Troubleshooting and Condition monitoring of plant equipments. • Vibration Monitoring, data collection, download / upload and operation of Vibration Analyzer CSI-2130. Analyzed the suspected problems through spectrum, waveform and phase angle measurements and issue the reports for remedial actions. Command on the features of Vibration Analyzer. • Inspection techniques NDT (DPT, MPT and UT) and knows about working principles of NDT equipments • Independent internal inspection of stationary equipment (vessels, tanks, cooling towers, filters and heat exchangers) and issued the relevant reports along with recommendation for remedial actions. • Worked on online corrosion monitoring techniques (corrosion coupons, ER probes & cathodic protection CP monitoring) • Prepared work instructions of Inspection section. • International Standards (ASME & API). • Have completed successful Turnaround TA-12 as an Mechanical Engineer (Vessels, Incinerator, Tanks, Regeneration gas Heater & Heat exchangers). Show less

Education

  • QUEST Nawabshah
    Bachelor of Engineering (B.E.), Mechanical Engineering
    2006 - 2009

Community

You need to have a working account to view this content. Click here to join now