Muneeb Uddin Khan

Project Manager R&D at Qlayers
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Rotterdam, South Holland, Netherlands, NL
Languages
  • English Professional working proficiency
  • Urdu/Hindi Native or bilingual proficiency
  • Italian Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • VCA
    VCANederland
    Jun, 2022
    - Nov, 2024

Experience

    • Netherlands
    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • Project Manager R&D
      • May 2022 - Present

      1. Project Kick-off & Resource Management: • Defining scope, schedule, and budget of Automated Spray Paint Solution projects for (Design, Electrical, and Automation teams) through Project Charters. • Maintaining detailed project planning aligned with Sales, through-life-support, and Production via stage-gate process. • Conducting resource planning, resolve conflicts within Engineering teams. 2. Monitoring & Control: • Conducting weekly follow-up meetings to monitor deviations, managing inter-departmental alignment based on RACI model. • Responsible for Project Charter revision in case of recycling or re-scoping. • Acting as focal point for external communication with vendors, suppliers, and 3rd parties. 3. Project & Product Sign-off: • Handling inter-departmental scheduling for proto testing, iterations, and draft test plans according to company standards. • Responsible for test documentation from drafting to sign-off. • Planning, allocating resources, and serving as focal person for product compliance and testing, including FAI and FAT. • Executing short-term containment actions, long-term upgrades through RL and ECI. • Successfully led CE compliance project in accordance to Machinery Directive 2006/42/EC for 10Q robot. • Familiarity with RoHS, EMC, RE, and ATEX Requirements. 4. Spray Booth Facility: • Managing spray booth facility, paint inventory, staff, equipment, and schedule for optimal in-house lab testing. • Formalizing and prioritizing test requests, document and disseminate lab test results for on-field operations of 10Q Robots. 5. General Responsibilities: • Working with Automation, Electrical, and Design team leads for comprehensive resource planning and inter-departmental support in cross-functional projects. • Travelling abroad to conduct practical training for customers in executing protective coating operations on Storage Tanks, Sea Vessels, and Refinery Tanks. • Supporting drafting and implementing process flow within the engineering team. Show less

    • Project Engineering Intern
      • Oct 2021 - May 2022

      • Thermal and Structural Modelling of commercial and residential projects using Building Information Modelling (BIM), aimed at the redevelopment of existing buildings for energy efficient systems • Work includes Modelling, Stratigraphy of Structures, Material Selection, Thermal Calculations, Finite Element Modelling (FEM), Requalification and Certification of buildings with Termolog Superbonus 110 module • Presenting & Discussing the Simulated Model to stakeholders and incorporate their demands in the plan • Handling paper work for Documentation and Liasons Show less

    • Pakistan
    • Wholesale Building Materials
    • 500 - 600 Employee
    • Assistant Engineer (Maintenance & Projects)
      • Aug 2017 - Aug 2018

      • Planned and Forecasted mid-level expansion and maintenance projects including installation and commissioning of 3rd Induction Furnace • Acquisitioned staffing, materials and equipment for the projects • Liaising and point of contact between suppliers , contractors and internal stakeholders • Scheduling and cost allocation of mid-level projects • Man management and training initiation of the relevant team personnel • Ongoing progress reporting to higher management using graphical presentations • Ensured that all aspects of the project proceeds while adhering to internal SOP and external regulations • Maintained project documentation • Contributed as active player in troubleshooting team of the project • Exhibit responsibility of commissioning and qualification of the projects • Planning, workforce resourcing and scheduling of periodic Maintenance of Induction Furnaces using history cards and risk matrix • Procurement of spare parts, tools, and consumables for routine maintenance • Led 'Gemba walk' organized to identify wasteful activities • Implemented 'Kaizen’ and “5S” approach on inventory store for continuous improvement and optimized stock levels • Studied movement of scrap to identify bottlenecks and other areas needing improvement Show less

    • Pakistan
    • Design Services
    • 1 - 100 Employee
    • Mechanical Project Engineer
      • Sep 2016 - Jul 2017

      • Led feasibility study of plant expansion projects in Textile (Artistic Milliners) and Pharmaceutical Companies ( OBS Pharma) while maintaining GMP • Generated RFQs to suppliers based on client’s needed specifications • Conducted comparative studies of multiple supplier’s HVAC products and arranged specification briefing with the clients • Energy audits for Textile & Pharmaceutical sector regarding steam & condensate, proper functioning of air compressors, turbines, pumps, generators, chillers, and cooling towers • Bi-Monthly reporting on equipment performance issues to relevant stakeholders Show less

    • Pakistan
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Management Trainee (Supply Chain Division)
      • Mar 2016 - Aug 2016

      • Industrial Process Audits with time and motion studies to promote lean product manufacturing approach • Handled monthly KAIZEN to initiate maximum time and resource utilization • Led project for cost cutting in wire harness of 3 running car models saving up to 2 Million PKR / annum • Developed SOP to effectively implement Value Analysis/ Value Engineering (VA/VE) on production line • Leveraged statistical data on production failures to pinpoint and eliminate flaws in assembling processes Show less

    • Pakistan
    • Oil and Gas
    • 700 & Above Employee
    • Field Intern
      • Jun 2014 - Jul 2014

      Cooperated with contractors and field engineers while reporting them rig activities, time to time. * Performed detailed mapping of water & mud supply distribution network which helped in further modification of piping network. * Attended night shifts, analyzing different rig parameters. * Managed & updated the records of field inventory. Cooperated with contractors and field engineers while reporting them rig activities, time to time. * Performed detailed mapping of water & mud supply distribution network which helped in further modification of piping network. * Attended night shifts, analyzing different rig parameters. * Managed & updated the records of field inventory.

Education

  • Politecnico di Milano
    Master's degree, Energy Engineering
    2018 - 2021
  • NED University of Engg. & Technology
    Bachelors, Mechanical Engineering
    2012 - 2015
  • Adamjee Government Science College
    FSc, Pre-Engineering
    2009 - 2011
  • Usman Public School
    Matriculation, Computer Science
    2007 - 2008

Community

You need to have a working account to view this content. Click here to join now