Muneeb Imran
at Engro Energy Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Engro Energy Limited
-
Pakistan
-
Oil and Gas
-
1 - 100 Employee
-
-
May 2020 - Present
-
-
-
Nov 2019 - May 2020
Responsible for developing multiple proposals for expansion/modifications in plant. (technical & business/economics aspect)1) Ensuring compliance of all operating procedures under different contracts (PPA, WUA, CSA etc.)2) Developed multiple tracking sheets for tracking of key parameters from lab 3) Developed multiple sheets for tracking key performance parameters for utilities portion of the plant & implementing the same for main power island4) Developed detailed system to track plant availability and PFO/FO on daily basis and consolidating the same for management in weekly/monthly reports. Show less
-
-
-
Engro Powergen Thar Limited
-
Pakistan
-
Oil and Gas
-
100 - 200 Employee
-
Assistant Manager Commissioning/Operations
-
Mar 2018 - Nov 2019
Working in the Commissioning & O&M teams completed following task: - Developed/Reviewed various procedures & checklists/logsheets which enabled seamless commissioning and operation of BOP/Utilities area of plant -Shift lead/In charge for 2x660MW complex for operations of plant post COD (from July 2019 to date) - Refractory Dryout (low temperature dryout for both boilers at 400C) - Chemical Cleaning of Pre-Boiler (Condensate & Feed water Circuit) And Boiler (Acid cleaning & Alkali Cleaning) - Commissioning of Raw Water Treatment System (3x1200m3/h clarifier, 9x330m3/h green sand filters, 9x290m3/h ultrafiltration devices & 7x300m3/h RO devices) - Commissioning of Boiler Makeup Water Treatment System (2x75m3/h RO Devices, 2x75m3/h Cation Exchangers, 2x75m3/h Anion Exchangers & 2x75m3/h Mixed Bed Exchangers) - Commissioning of Cooling Water System (93000m3/h circulation, 20x5750m3/h cooling towers & dosing systems) - Commissioning of Air Compressor Systems (9x 70.5Nm3/min, P=0.75MPa) - Commissioning of Auxiliary Boiler (30t/h P=1.3MPa, 350C) - Steam Blowing Activities for Auxiliary Header (Pressure 1.1 MPa, Temperature 300C) - Commissioning of Industrial Waste Water Treatment System (50t/h capacity able to treat all industrial waste from plant) - Commissioning of fire water pumps & fire water system Show less
-
-
-
Engro Corp
-
Pakistan
-
Chemical Manufacturing
-
700 & Above Employee
-
-
Jul 2015 - Mar 2018
Project Management(Engineering, Construction, Commissioning & Start up), in Project team of Pakistan first mine-mouth Coal Fired Power Plant (2x330MW) in Thar Block II. Working in Technical and Commercial Teams on:-Basic design review for 2x330MW (2x1105t/h 175barg sub-critical CFB boilers, 2x330MW STG island single reheat HP,IP & LP turbines) mine mouth (Thar Lignite Coal) power plant-Coordinator for detail design of project -Lead for Design review for Utilities section of power plant (water treatment (2800m3/h RO plant), water supply (20x5750m3/h cooling tower cells), reinjection, evaporation pond (4x25000m3) etc.)-Engineering & Commissioning of Water Supply for power plant (~36KM pipeline and pumping facility designed for 2100m3/h flow)-Engineering Coordinator responsible for timely issuance of all design volumes as per schedule along with coordination with all interfaces (Contractor, Owners Engineer & Owner Engineering team)-Developing of Water Tariff -Preparation of PSI package (Implementation of DuPont Safety Systems)-Lead for design of plant offsites-Development of Water Quality for design-Development of Plant Utilities Operational Strategies (Running various simulations)-Development of plant degradation calculation in coordination with EPC & OEM-Lead on reinjection design (natural reinjection into subsurface aquifers)-Lead for Commissioning of Power Plant BOP (utilities(water supply/water treatment), fuel handling systems, offsites etc.)-Lead for the Review & sourcing of consumables (Imported coal, Limestone, Sand, Chemicals Etc.)-Site supervision at project siteCertified by DuPont for PHA studies (Training from DuPont Professional on PHA) Show less
-
-
-
Jul 2014 - Jul 2015
Project Management, in Project team of Pakistan first mine-mouth Coal Fired Power Plant (2x330MW) in Thar Block II. Working in Technical and Commercial Teams on:-DBM for 2x330MW(Design Basis Memorandum)-Water usage agreement -Power Plant Availability-Design Projections (cooling towers, Reverse Osmosis Plant) -Coal supply agreement-Power Purchase Agreement-Water Usage AgreementLead/Supervised Preliminary Geo technical and Topographic survey activity carried out by Chinese at power plant site. Show less
-
-
-
National University of Sciences and Technology (NUST)
-
Pakistan
-
Higher Education
-
700 & Above Employee
-
Bachelors Chemical Engineering
-
Sep 2010 - Jun 2014
-
-
-
Baker Hughes
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Drilling fluids intern
-
Jul 2013 - Aug 2013
As an intern in the drilling fluids department i had the job of conducting different tests on drilling fluids using a variety of equipment found at the Baker Hughes Yard. I made 2 different types of drilling fluids using different ingredients and analyzed the difference in properties of the fluids due to the change in ingredients. As an intern in the drilling fluids department i had the job of conducting different tests on drilling fluids using a variety of equipment found at the Baker Hughes Yard. I made 2 different types of drilling fluids using different ingredients and analyzed the difference in properties of the fluids due to the change in ingredients.
-
-
-
NUST Olympiad 2013
-
NUST H-12
-
Convener/President
-
Sep 2012 - Jun 2013
Lead a team of approximately 250 people to organize the biggest event of it's kind in terms of participation in Pakistan. we had more than 1500 people participating in over 25 events. we managed a budget of over 2.5 million PKr. Lead a team of approximately 250 people to organize the biggest event of it's kind in terms of participation in Pakistan. we had more than 1500 people participating in over 25 events. we managed a budget of over 2.5 million PKr.
-
-
-
NUST Science Society
-
Islamabad
-
Joint Secretary Admin and Finance
-
Aug 2012 - Jun 2013
Had a portfolio of three teams that reported to me that is admin events, finance and logistics. A diverse experience in these three fields managed over twenty events through my one year tenure. Had a portfolio of three teams that reported to me that is admin events, finance and logistics. A diverse experience in these three fields managed over twenty events through my one year tenure.
-
-
-
NUST Adventure Club
-
NUST
-
Secretary
-
Sep 2012 - Nov 2012
-
-
-
NUST Adventure club
-
NUST
-
Director Public Relations
-
Feb 2011 - Jun 2012
-
-
-
NUST Literary Circle
-
NUST
-
Director Coordination
-
Feb 2011 - 2012
-
-
-
Descon Oxychem Limited
-
Oil and Gas
-
1 - 100 Employee
-
Internee
-
Jul 2011 - Aug 2011
-
-
Education
-
National University of Science and Technology
Bachelor of Engineering (BE), Chemical Engineering -
Beaconhouse School System
A Levels, Olevels, Schooling, highschool