Muneeb Ansari
Sr. QA/QC Electrical Engineer at HABTOOR LEIGHTON SPECON- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Arabic Elementary proficiency
-
Urdu Native or bilingual proficiency
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
HABTOOR LEIGHTON SPECON
-
1 - 100 Employee
-
Sr. QA/QC Electrical Engineer
-
Sep 2013 - Present
•Review of Electrical Material Approvals, Mock-up requests, Work Notifications, Method Statements for Electrical Installations before submitting for approval to the consultant. •Carrying out all inspections on site related to Electrical installations including MV, LV, ELV. •Snagging for all Electrical Installations. •Assistance in Close-Out documentation. •Reviewing Operation and Maintenance Manuals, Training Manuals, Spare Parts Lists and Warranty Certificates. •Reviewing of As-Built Drawings as per actual site installations before submitting to consultant for approval. Show less
-
-
-
ETA ASCON
-
India
-
Transportation, Logistics, Supply Chain and Storage
-
1 - 100 Employee
-
QAQC Electrical Engineer
-
Jun 2011 - Jul 2013
•Review of Electrical Material Approvals, Mock-up requests, Work Notifications, Method Statements for Electrical Installations before submitting for approval to the consultant. •Carrying out all inspections on site related to Electrical installations including MV, LV, ELV. •Snagging for all Electrical Installations. •Assistance in Close-Out documentation. •Reviewing Operation and Maintenance Manuals, Training Manuals, Spare Parts Lists and Warranty Certificates of CCAD. •Reviewing of As-Built Drawings as per actual site installations before submitting to consultant for approval. Show less
-
-
-
-
QAQC Electrical Engineer
-
Apr 2008 - Jan 2011
•Review of Electrical Material Approvals, Mock-up requests, Work Notifications, Method Statements for Electrical Installations before submitting for approval to the consultant. •Carrying out all inspections on site related to Electrical installations and in PTB, JXB1/431 Project. •Inspection of all site installation for ELV systems which includes Fire Alarm System (FAS), Structured cabling network (SCN), Building Management System (BMS), Public Address System PAS), Security & Access Control System (SACS), CCTV, Master Clock System, Baggage Handling System (BHS). •Witnessing all the Insulation Resistance tests (Megger Tests) and Hypo Test of cables, RMU and Transformer prior to Energization of Sub-Stations for Passenger Terminal Building. •Witness the megger tests for all Switchgear system Testing and commissioning related to major Electrical Installations such as Transformer, UPS, Generator, RMU etc. •Attend Factory Acceptance Tests (FAT) for major Electrical Items including RMU, MDBs, SMDBs, EPP, ELP, Feeder Panels, and MV Cables. •Snagging for all Electrical Installations in Passenger Terminal Building (PTB). •Assistance in Close-Out documentation. •Reviewing Operation and Maintenance Manuals, Training Manuals, Spare Parts Lists and Warranty Certificates of passenger terminal building. •Reviewing of As-Built Drawings as per actual site installations before submitting to consultant for approval. Show less
-
-
-
-
QC Engineer E&I
-
Apr 2007 - Apr 2008
•Preparation of all QC Documents for Inspection, testing and commissioning. •Preparation & monitoring of Inspection and Testing Schedules. • Inspection and testing of all electrical equipment. •Punch list items killing and follow-up. •Additional responsibility to work as coordinator of E&M for Pre-Commissioning. (SMT- Single Machine Run Test) •Inspection and handing over of all Non-Production Buildings which includes Fire-Fighting, Air Conditioning and all related Electro-Mechanical works. •Additional responsibility to Work as Technical office Engineer E & I. •Preparation and handing over of all Final QC documents to client Show less
-
-
-
Descon Engineering
-
United Kingdom
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Sr. QHSE Engineer
-
Feb 2003 - 2007
•Developed company’s Quality Manual in accordance with ISO-9001: 2000 model and conducted internal Quality Audits. During audits of various departments in Head Office and at project sites, I highlighted various Corrective and Preventive Actions for System Non-Conformities and drove these reports to closure. Also, I coordinated with accreditation bodies for external audits and recertification. •Fully involved in the planning, preparation and Implementation of Company’s Integrated Management System (IMS) i.e. ISO 9001:2000, EMS 14001 and OH&S 18000. I prepared / modified company’s Standard Operating Procedures (SOPs) and Method Statements (MS) while appreciating the system integration requirements. Show less
-
-
Education
-
NED University of Engineering and Technology
Bachelor of Engineering (B.E.), Electrical -
Adamjee Science College
HSC, Pre-Engineering