Mujibur Rahman
BMS Manager - Riyadh Metro Rail Project-Line_3 at Webuild- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Steven C.
Mujibur expertly filled the role of TVS lead for Doha Metro across 37 stations over 75km of underground network. I had the pleasure of working with Mujibur along with his reliability and dedication to his work. He would be a valuable asset to any company.
Eren Musluoglu
Mitsubishi Heavy Industries Ltd (MHI) has been appointed as the Systems Contractor within the MMHKT Consortium to deliver Energy, Platform Screen Doors, and Tunnel Ventilation System for Doha Metro Phase 1, composed of 36 underground station and 4 mid-tunnel ventilation buildings. Acting as the Tunnel Ventilation System (TVS) Testing and Commissioning Lead for Mitsubishi Heavy Industries Ltd, Mujibur Rahman has demonstrated exceptional communication, coordination, and management skills throughout the TVS commissioning activities. He has diligently monitored the status of equipment installation and readiness at all sites, and developed his testing schedule accordingly. Mujibur directly managed the Tunnel Ventilation System Subcontractor, Zitron, in completing the TVS standalone equipment testing, in preparation of necessary reporting of test results, and in demonstrating the compliance of requirements to Qatar Rail, the Client. He played a significant role for MHI in achieving the Pre-Commissioning Certificate for TVS equipment; Axial Fans, Jet Fans, Dampers, Tunnel Cooling AHU, and TVS Control System. Granting Acceptance Certificate for Tunnel Ventilation System requires fully coordinated tunnel velocity verification tests, involving TVS equipment running concurrently in multiple locations. Tunnel Velocity tests also require rolling stock to be parked at the chosen incident location in tunnels. Mujibur has gone above and beyond in his duties to complete the tunnel velocity verification testing for the Client within the assigned deadlines. He has led a large team of engineers and technicians, assigned each with specific tasks, and taken initiative in coordination within his Consortium for borrowing the rolling stock for the tests. Overall, he has met the Client’s expectations in achieving successful outcome.
Steven C.
Mujibur expertly filled the role of TVS lead for Doha Metro across 37 stations over 75km of underground network. I had the pleasure of working with Mujibur along with his reliability and dedication to his work. He would be a valuable asset to any company.
Eren Musluoglu
Mitsubishi Heavy Industries Ltd (MHI) has been appointed as the Systems Contractor within the MMHKT Consortium to deliver Energy, Platform Screen Doors, and Tunnel Ventilation System for Doha Metro Phase 1, composed of 36 underground station and 4 mid-tunnel ventilation buildings. Acting as the Tunnel Ventilation System (TVS) Testing and Commissioning Lead for Mitsubishi Heavy Industries Ltd, Mujibur Rahman has demonstrated exceptional communication, coordination, and management skills throughout the TVS commissioning activities. He has diligently monitored the status of equipment installation and readiness at all sites, and developed his testing schedule accordingly. Mujibur directly managed the Tunnel Ventilation System Subcontractor, Zitron, in completing the TVS standalone equipment testing, in preparation of necessary reporting of test results, and in demonstrating the compliance of requirements to Qatar Rail, the Client. He played a significant role for MHI in achieving the Pre-Commissioning Certificate for TVS equipment; Axial Fans, Jet Fans, Dampers, Tunnel Cooling AHU, and TVS Control System. Granting Acceptance Certificate for Tunnel Ventilation System requires fully coordinated tunnel velocity verification tests, involving TVS equipment running concurrently in multiple locations. Tunnel Velocity tests also require rolling stock to be parked at the chosen incident location in tunnels. Mujibur has gone above and beyond in his duties to complete the tunnel velocity verification testing for the Client within the assigned deadlines. He has led a large team of engineers and technicians, assigned each with specific tasks, and taken initiative in coordination within his Consortium for borrowing the rolling stock for the tests. Overall, he has met the Client’s expectations in achieving successful outcome.
Steven C.
Mujibur expertly filled the role of TVS lead for Doha Metro across 37 stations over 75km of underground network. I had the pleasure of working with Mujibur along with his reliability and dedication to his work. He would be a valuable asset to any company.
Eren Musluoglu
Mitsubishi Heavy Industries Ltd (MHI) has been appointed as the Systems Contractor within the MMHKT Consortium to deliver Energy, Platform Screen Doors, and Tunnel Ventilation System for Doha Metro Phase 1, composed of 36 underground station and 4 mid-tunnel ventilation buildings. Acting as the Tunnel Ventilation System (TVS) Testing and Commissioning Lead for Mitsubishi Heavy Industries Ltd, Mujibur Rahman has demonstrated exceptional communication, coordination, and management skills throughout the TVS commissioning activities. He has diligently monitored the status of equipment installation and readiness at all sites, and developed his testing schedule accordingly. Mujibur directly managed the Tunnel Ventilation System Subcontractor, Zitron, in completing the TVS standalone equipment testing, in preparation of necessary reporting of test results, and in demonstrating the compliance of requirements to Qatar Rail, the Client. He played a significant role for MHI in achieving the Pre-Commissioning Certificate for TVS equipment; Axial Fans, Jet Fans, Dampers, Tunnel Cooling AHU, and TVS Control System. Granting Acceptance Certificate for Tunnel Ventilation System requires fully coordinated tunnel velocity verification tests, involving TVS equipment running concurrently in multiple locations. Tunnel Velocity tests also require rolling stock to be parked at the chosen incident location in tunnels. Mujibur has gone above and beyond in his duties to complete the tunnel velocity verification testing for the Client within the assigned deadlines. He has led a large team of engineers and technicians, assigned each with specific tasks, and taken initiative in coordination within his Consortium for borrowing the rolling stock for the tests. Overall, he has met the Client’s expectations in achieving successful outcome.
Steven C.
Mujibur expertly filled the role of TVS lead for Doha Metro across 37 stations over 75km of underground network. I had the pleasure of working with Mujibur along with his reliability and dedication to his work. He would be a valuable asset to any company.
Eren Musluoglu
Mitsubishi Heavy Industries Ltd (MHI) has been appointed as the Systems Contractor within the MMHKT Consortium to deliver Energy, Platform Screen Doors, and Tunnel Ventilation System for Doha Metro Phase 1, composed of 36 underground station and 4 mid-tunnel ventilation buildings. Acting as the Tunnel Ventilation System (TVS) Testing and Commissioning Lead for Mitsubishi Heavy Industries Ltd, Mujibur Rahman has demonstrated exceptional communication, coordination, and management skills throughout the TVS commissioning activities. He has diligently monitored the status of equipment installation and readiness at all sites, and developed his testing schedule accordingly. Mujibur directly managed the Tunnel Ventilation System Subcontractor, Zitron, in completing the TVS standalone equipment testing, in preparation of necessary reporting of test results, and in demonstrating the compliance of requirements to Qatar Rail, the Client. He played a significant role for MHI in achieving the Pre-Commissioning Certificate for TVS equipment; Axial Fans, Jet Fans, Dampers, Tunnel Cooling AHU, and TVS Control System. Granting Acceptance Certificate for Tunnel Ventilation System requires fully coordinated tunnel velocity verification tests, involving TVS equipment running concurrently in multiple locations. Tunnel Velocity tests also require rolling stock to be parked at the chosen incident location in tunnels. Mujibur has gone above and beyond in his duties to complete the tunnel velocity verification testing for the Client within the assigned deadlines. He has led a large team of engineers and technicians, assigned each with specific tasks, and taken initiative in coordination within his Consortium for borrowing the rolling stock for the tests. Overall, he has met the Client’s expectations in achieving successful outcome.
Experience
-
Webuild
-
Italy
-
Construction
-
700 & Above Employee
-
BMS Manager - Riyadh Metro Rail Project-Line_3
-
Apr 2023 - Present
-
-
BMS and T&C Lead Engineer - Riyadh Metro Rail Project-Line-3
-
Feb 2022 - Apr 2023
-
-
Building Management Systems Engineer - Riyadh Metro Rail Project-Line-3
-
Nov 2020 - Apr 2023
Consultancy services - Design review and T&C for MEP & TVS - BMS system for RMTC,Line-3 Riyadh Metro Rail Project.
-
-
-
Mitsubishi Heavy Industries
-
Japan
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
TVS Lead - Doha Metro Rail Project - Red,Green,Gold and Blue Lines
-
May 2019 - Oct 2020
-
-
TVS- T&C LEAD - Doha Metro Rail Project - Red,Green,Gold and Blue Lines.
-
May 2018 - Apr 2019
-
-
Control Engineer - TVS - Doha Metro Rail Project
-
Apr 2017 - Apr 2018
-
-
-
ETA Engineering Private Limited
-
India
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
Assistant Manager - TVS / ECS & Electrical - Chennai Metro Rail Project
-
Sep 2011 - Apr 2017
-
-
-
ETA Group of Companies
-
United Arab Emirates
-
Construction
-
700 & Above Employee
-
Serinor Enginner - TVS / ECS -Dubai Metro Rail Project
-
Jul 2008 - Sep 2011
-
-
-
Semi Builder
-
Chennai Area, India
-
ELV Engineer
-
Apr 2004 - May 2006
-
-
Education
-
Anna University Chennai
Bachelor's of Engineering - EEE, Electrical and Electronics Engineering