Muhammad Umer Hussain

IBS RF Optimization Senior Engineer at Tamdeed Projects (Etisalat Services)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Information Technology & Services
    • 100 - 200 Employee
    • IBS RF Optimization Senior Engineer
      • Jan 2017 - Present

      Etisalat IBS RF Optimization Project • Mobilize, lead and manage teams for tapping modifications, update and modify designs. • Discuss any proposed tapping, RRU cascading and sectorization modifications or issues for all bands and technologies with Etisalat RF Planning. • Prepare new hardware sheets, additional or replacement components proposals in order to enhance LTE or WDMA powers. • Removal or additional Proposals for new RRUs or sectors. • Solving MIMO Utilization issues to meet throughputs standards of L900, L2100, L1800 & L800. • Rectification of floors and Lifts Low Radiating Antennas which causes weak coverages. • Spillage rectification proposals and neighbors’ additions or deletion for all bands. • KPI threshold achievements of 2G900 1800 3G 900 2100 and L2100 L900 L800 and L1800. • Floors & Lifts Coverage walk tests for all bands in different formats. Lifts coverage improvement proposals. • Handled and involved in all mega projects: Motion Gate Dubai, Warner’s Brother, Mega Mall, Sharjah City Center, Manar Mall RAK, Al Rayyan Complex Sharjah, Intercontinental Hotel Fujairah, Asas Towers Sharjah and Fujairah Sports City etc. • Additional antennas/components proposals, relocation or dismantling unnecessary antennas. • MIMO/SISO Tapping updating and DAS troubleshooting. • Preparation and acceptance of RF Full Coverage report from Etisalat. • Handling walk tests teams and final RF report submission and approval from Etisalat. • Troubleshooting of low radiating antennas. • Handling modernization projects to Update DAS with SISO to MIMO, LTE bands additions, antennas addition, replacement of old DAS into new PIM certified material DAS. • 108 IBS sites acceptances after rectifications of spillage, low EiRP antennas and KPIs for all Bands and Technologies. • Tools: TEMS Pocket, MAP Info and TEMS Discovery.

    • Facilities Services
    • 700 & Above Employee
    • IBS Implementation Senior Engineer
      • Apr 2015 - Dec 2016

      Etisalat IBS Implementation Project • Mobilize, lead and manage the dynamic, skillful teams for surveys, solution, designs, installation, integration, troubleshooting and pre-post tests for GSM, WCDMA and MIMO/ SISO-LTE IBS. • Discuss any proposed solution with vendors, other technical staff and end users to ensure its technical viability and to identify any problem. • Monitor the BoQ and Purchase Orders of IBS after the completion of the sites. • Monitor and check technical designs of IBS highlights showing estimated equipment location details before submitting the vendor/operator. • Fiber link connectivity plans to interconnect RRUs of different telephone rooms. • During Implementation follow up with RF Planning, Transmission (Optical or MW), MNO, Huawei BSS for eNode B and SRNC features updates. • Upgradation of WBBPd2 to WBBPf4 or for LTE UBBPE4, UBBPE6 as per RF planning advice. • Initiate and enforce proper project as build documentation and processes. • Coordinate with implementation teams, customers, sub-contractors and building management to ensure that the installation is made according to the design proposal. • Optimize Coverage including component reshuffle if necessary after installation. • Check overall quality issues regarding design and installation before acceptance. • Troubleshooting and complaint management as per service level agreements. • Lead the team to perform day to day operational activities and fault rectifications in network. • Coordinating with other departments in aligning departmental objectives to achieve organization goals. • Weekly Implementation meeting with vendor and operator. • Weekly meeting with the BM and scheduled site visits. • Preparing & implementation of project implementation plan. • Supervise subcontractors to ensure sites implementation quality as per standard. • Handled Huawei MIMO/ SISO mix mode integrations. • DAS Implementation and Integration of 105 sites

    • WCDMA-FDD Radio Network Optimization Engineer
      • May 2014 - Mar 2015

      Huawei-Zong Project • Worst Cell Analysis and 3G KPI monitoring by using M2000 & Huawei PRS. • Major KPIs degradation analysis: Accessibility (RRC, RAB, CSSR), Mobility (CS-IRAT HO, PS-IRAT cell change order, Intra-Inter Frequency HO, Hard Handovers, Soft-softer HO), Retain abilities (CS-PS call drops, PDP context drops). • Solving Issues like coverage, throughput, pilot pollution, missing neighbors, full-carrier swap and PS-CS Drops. • Hard Optimization & soft Parameter change suggestions for clusters. • Congestion Analysis for Power, Code, CE & Iub. • Responsible for the newly Release-8 WCDMA-FDD Dual carrier sites SSV testing and coordination with implementation and integration teams for completion of tasks. • Responsible for maintaining a tracker for the SSV testing progress and sharing the updated tracker with technical experts (like Implementation, Integration, Initial tuning and optimization) and senior management. • Pre-Post cluster optimization using TEMS 15 and Probe. Physically changes proposals and implementation. Site audit implementation. Neighbors audit. Soft parameters audit. • Events, layer 3 messaging, Concept of CS-PS call flow. CPICH power tuning. • Preparing SSV on air sites and cluster reports. PSC dimensioning. Iub Utilization, CE Utilization, Cell availability, Power Utilization monitoring. Paging Success rate improvement and Call setup timing improvement. • Post processing of the drive test data to troubleshoot & recommend parameter changes. • Release-8 Dual carrier WCDMA-FDD sites functionality tests like Voice-Video calls, HSDPA and HSUPA max throughput and handovers for IRAT, Inter-Intra frequency CS voice and PS data. Tools • M2000, TEMS 15, Genex Probe 3.6 & Assistant, ACTIX.

    • IBS Implementation Engineer
      • Jun 2013 - Mar 2014

      Huawei Rostelecom Project • Coordinate with for the commissioning & Integration of the new IBS sites. • Preparation of the weekly rollout, commissioning & Integration as per plan. • Arrange outside resources to meet project resource requirements. • Coordination of IBS activities with crosses functional teams. • Implementation of assign projects as per plan. • Site Folder preparation and submission for completed projects. • Installation of Splitters, Triplexers, Hybrid coupler & Quality assurance. • Tapping modification implementation if necessary. • Preparations of project implementation plan, manage smooth implementation and Coordinate with Operator for the Handover of completed sites.

    • United Arab Emirates
    • Telecommunications
    • 1 - 100 Employee
    • Drive Test and Post Processing Engineer
      • Apr 2011 - Mar 2013

      Nokia-Du Project • Coordinate & Conduct routine & issue-based drive tests of WCDMA-FDD of remote urban clusters optimization using Nemo 5 and Nemo 7. • Perform Cluster Drives as per SLA and Post Processing of log files on NEMO Analyzer. • Attend Optimization Customer Complaints on Nemo Handy. • Benchmarking, Boarder drive, Indoor IBS Walk Tests, Customer Complains, SSV and PrePost Cluster reporting. • Drive Test Reports, Involving KPI reports, CPICH-RSCP & CPICH-Ec/No, Pilot Pollution, Call drop and Call block rates. • Sort out problems and proposing solutions for rectification involving improvement of RF environment by physical changes like orientation and electrical-mechanical tilts of the site or its neighbors, etc. • Using NEMO to verify inter- intra IRAT and all kinds of handovers. • Reporting of walk test for malls, offices and other locations. • Reporting of freeway drive, VIP routes and major roads according to customer demand. • Analysis of DC-HSDPA & HSUPA, Video Call and R99 tests. • Reports preparation by using Nemo Analayzer and Actix. Tools • TEMS 14-15, Nemo 5-7, Nemo Handy & Nemo Analyzer, Map Info.

    • IBS Project Manager
      • Aug 2007 - Dec 2010

      Huawei-Ufone Project • Mobilize, lead and manage the skillful teams for surveys, solution designs, installation, troubleshooting and pre-post drive Tests for Huawei Ecells. • Worked closely with development teams and sharing knowledge in the area of development. • Discuss any proposed solution with vendors, other technical staff and end users to ensure its technical viability and to identify any problem. • Prepare the BOQ and PO of Ecells after the completion of the sites. • Successfully deployed 163 Ecells & IBS all over Pakistan. • RF Survey of a building properly in terms of network coverage enhancement and determine Antenna placement for maximum coverage considering all physical constrains, cable routing and Huawei BTS location considering all technical requirements. • Preparation of RF Schematic Diagram with Equipment Planning, EiRP Calculation, Link budget calculation and coverage note. • Design antenna placement and cable routing according to schematic diagram using MS VISO. • Prepare technical design of Ecell highlights showing estimated equipment location details. • Initiate and enforce proper project as build documentation and processes. • Coordinate with implementation team, customers, sub-contractors and building management to ensure that the installation is made according to the design proposal. • Optimize Coverage including component reshuffle if necessary after installation. • Check overall quality issues regarding design and installation before acceptance. • Troubleshooting and complaint management as per service level agreements. • Lead the team to perform day to day operational activities. • Prepare the schematic Antennas Layout designs of Airports, Hotels, Bus terminals, Railway stations, Motels, Public Places, Residential & Business towers, Offices, Food streets, Outdoor shopping streets, factories, VIPs Villas, Government and Private offices, Public Places, Picnic Spots, Restaurants, Landlord farmhouses, Hospitals and Stadiums.

    • Pakistan
    • Telecommunications
    • 100 - 200 Employee
    • Microwave Transmission Engineer
      • Oct 2005 - Jul 2007

      NEC Mobilink Project • Responsible for the deployment, commissioning and Provisional acceptance of NEC Digital Microwave systems. • Responsible for all customer dealing which include different type of reporting and weekly meetings • Providing Technical help/guidance for LOS surveys, System designing & planning. • Combine nominal LOS and planning surveys with, RF, Civil and acquisition teams of Mobilink. • Hands on experience for the Deployment & Commissioning of 250 Microwave links of NEC. • Familiar with PDH (4E1, 16E1), MX (40E1, SDH (63E1), XPIC (126E1)48E1 Neo Network Protocols. • Quality control inspection, PAT and Troubleshooting for the microwave link of the Mobilink on the behalf of NEC

Education

  • IET
    Bachelor of Engineering in Telecommunication, Pakistan Engineering Council Registered Engineer

Community

You need to have a working account to view this content. Click here to join now