Muhammad Tahir Ashraf Hashmi

Electrical Engineer at Ferplant srl-gruppo Mondopower
  • Claim this Profile
Contact Information
Location
IT

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Italy
    • Design Services
    • 1 - 100 Employee
    • Electrical Engineer
      • Jan 2023 - Present

      • Create and implement design and manufacturing processes and testing methods that maximize production streams and deliver quality materials • Analyze project requirements and perform technical calculations to inform design, including electrical requirements, safety standards, and motor controls; develop and implement software databases for tracking production processes. • Maintain state of the art awareness and knowledge of latest technology in Electrical Drafting processes and procedures. • Based on provided sketches, markups and directions; develop wiring diagrams. • Assume responsibility, plan and execute assigned tasks to meet expectations (cost, quality and on time performance) • Manage multiple tasks from start to finish. • Work cooperatively with all team members and communicate effectively. • Knowledge of software PVGIS, Progetto Integra 5.11, Solaredge designer DIALux 4.13 and AutoCAD expert to do work using these software. Show less

    • Oil and Gas
    • 500 - 600 Employee
    • Jr. Electrical & Instrumentation Engineer
      • Jun 2018 - Sep 2020

      • At APL(Oil and Gas Company), I worked in refinery processes with Electrical Transmission and distribution network of APL. Gained useful Knowledge about 28MW Power plant and 132KV Grid Station. Worked closely with engineers and assisted with testing of electrical installations. Make engineering designs and drawings of electrical installations at APL. Participated in failure analysis and debugging report activities. • Create point to point-wiring drawings for Electrical Equipment Centers (EEC or PDC or PCR), Medium Voltage and Low Voltage switchgear, Motor control centers, Utility panels. Utilizing electrical design software(AutoCAD Electrical) for electrical control systems, such as switchgear and motor controls. • Have the technical understanding of circuit design and electrical component functionality to create electrical drawings accurately. • Communicate with electrical assembly department and wiring department with drawings, written instructions, and verbal instructions. • Design, implement, maintain, and improve electrical instruments, equipment, facilities, components, products, systems, and testing for product quality and capability while always adhering to organizational standards and expectations. • Direct or coordinate manufacturing, construction, installation, maintenance, support, and documentation to ensure compliance with specifications, codes, customer requirements, project scope, schedules, and budget. • Maintain systems and component capabilities through rigorous testing, track cutting-edge trends, search for ways to improve functionality and efficiency, and implement appropriate segments to keep production methods current. • Prepare comprehensive documentation for all electrical designs, including wiring diagrams and schematics, bills of materials, assembly drawings, design changes, test reports, design-validation plans, and reports ensuring that installations and operations conform to standards and customer requirements Show less

    • Graduate Engineering Trainee
      • Apr 2017 - Oct 2017

      • 10 Floor Mall with Supermarket, Apartments, Food Court, Kids Play Area, Retail Brands, Grocery Store. • 5000KVA Transformers, HT Panels, LT Panels, Busways (BTD), Generators, Earthing system, General Wiring, Public Address, CCTV, Car Parking, Fire Alarm system and Cable tray design, manufacturing, supply, installationand commissioning work. • Ensuring that Installation is completed in accordance with the Erection Plan. • Ensuring the disposition of NCR’s at site • Inspecting Material Inspection Request (MIR) of electrical material received at site. • Inspecting Request for Inspection (RFI’s) of electrical installations at site. • Issuing snag list to comply & rectify the observations. • Maintain files and reports regarding inspection and plan check activities and findings. • Inspecting temporary electrical systems at special events. • Project management, planning and Execution timely as per approved Electromechanical work Schedule. • Supervision of all MEP site activities (HVAC, Electrical, Plumbing, GAS, LPG, firefighting(750GPM,9Bar), Escalators (12 Nos), Travellators (4 Nos) and Lifts (5) Passengers, 2 cargo, 2 Capsules). • Reviewing AUTOCAD detailed drawing in accordance to relative design standards and calculation • Selection and installation of HVAC equipment such as Chillers (4x515 Tons) AHU & FCU & Fans & Pumps (Primary/secondary, Condenser) & and cooling tower (8 cells). • Selection and installation of Electrical Equipment like HT/LT(4MW) Panels, Transformers(2x2500KVA), Bus Way System along with Bus Riser (250 amps to 4000 amps), Generator(3x1500KVA), Earthing, Lightening Protection, Fire Alarm System, Power and control cable laying and termination etc. • Shop drawings and coordination Show less

Education

  • Sapienza Università di Roma
    Master of Engineering - MEng, Electrical Engineering
    2020 - 2023
  • University of Engineering and Technology, Lahore
    Bachelor of Engineering - BE, Electrical Engineering
    2014 - 2018
  • BISE Multan
    FS.c, Pre-Engineering
    2013 - 2014
  • BISE Multan
    SSC, Science
    2010 - 2012

Community

You need to have a working account to view this content. Click here to join now