Muhammad Tahir

Senior Project Engineer at ZAMIL COOLCARE CO
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
SA
Languages
  • English -
  • Arabic -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Saudi Engineering Certification
    Saudi Engineering Council
    Jul, 2014
    - Oct, 2024
  • BMS& SCADA Certification from BECHTEL Qatar
    -
  • First Aid Certificate
    Hammad International Hospital Qatar

Experience

    • Saudi Arabia
    • Mechanical Or Industrial Engineering
    • 200 - 300 Employee
    • Senior Project Engineer
      • Jul 2016 - Present

      Responsible for preparation of project documents Phase A to Phase Z, Construction Plan, Project MOS, JSA and Submittals etc.Responsible for the installation of HVAC System, Chillers, Air Handling Unit ( AHU), PACU, CHWP DDC,Ducting & E&I System.Responsible for all Construction activities for the project closing.Responsible for comm. & pre comm. of HAVC system based on DDC Panel.Co-ordination with Client and Zamil Engineering, Procurement teams to clear issues hindering progress & ensure correctness of Engineering and Procurement logs.Daily/Weekly, report generation/validation for correctness and submission .Responsible for BOQ Validation.Preparation and submission of ITP (Inspection & Testing Plan) for approval as per Client instructions.Preparation and submission of Method statements for approval as per project Specification, codes andstandards.Monitor contractor’s installation work to maintain the quality of work with health and Safety measures.Daily updating of Master log sheet according to inspection documents.Allocate work to Engineer & supervisor on a weekly/Monthly basis to start and finish activities on time.Monitoring Subcontractor work in terms of quality and timely completion.Responsible for raising invoices/Variations on time & Follow Up and Collect Payments.Timely verification of Subcontractor/Supplier Invoices & Ensure timely ordering and delivery ofMaterials.Manage quality of work executed & Manage HSE (Health, Safety & Environment).Review plans and drawings in accordance with specifications, and standards.Inspect and ensure to comply the quality and as per design prior for Installation, Cable pulling,Termination and CommissioningReview and Inspection of all Electrical Material, prior to Installation.Daily monitoring the Construction Activities and verifies compliance to project procedures, specificationsMonitoring the Inspection of Electrical Equipment function test and Illumination level testing of lightingsystem.

    • Maintenance Engineer HVAC/ E &I / BMS/ FADS
      • Jul 2014 - Jul 2016

      Responsible for O &M, Commissioning experience of HVAC, YOURK CHILLER 2500 TON ,PACU, CARC,FCU ,Fire alarm and Detecting System, FM200 system, BMS (Desigo S/W, Siemens), Access Control System (ACS), PLC, & DCS (Siemens, Rock well. Allen Bradley), SCADA, Instrumentation, LOW and High Pressure Fire Electric/Diesel Pump, Their Controller, and a member for the implementation of GSTD, DMAIC and TPM.Responsible for smooth operation and Maintenance chiller plant & Power Plant through BMS.2500 ton*4 York centrifugal Chillers through Building Management System (BMS).Responsible for the O&M of Johnson Controls Centrifugal chillers, Dunham Bush Air Handling Units(AHU), Package Air Conditioning Units (PACU) and Emerson Computer Room Air Conditioner Units(CRAC).District Cooling System (DCS), chilled water circulation system and network. Potable water pumpingsystem and network.Sewage Lifting Stations and waste water collection system. Field instruments from Enders + Hauser,ABB, Siemens, Onion & Be limo.Loop testing, ESD loop testing, Trouble shooting, faultfinding, and route cause failure analysis.Responsible for maintaining fire alarm and detecting system(General fire Alarm system and FM-200 fire suppression system (Honey Well, ETS3 & Notifier)Responsible for maintain record for spares & responsible for implementation of safety rules andregulations.

  • QDSBG
    • Hammad International Airport Doha QATAR
    • Low Current Engineer(Instrumentation,SCADA,BMS,FADS)
      • Jul 2010 - May 2014

      Responsible for Installation, Testing and Commissioning ,smooth operation and Maintenance chiller Plant (HVAC) & Power Plant through BMS. 2500 ton*4 York centrifugal Chillers through Building Management System (BMS). Responsible for maintain record for spares & responsible for implementation of safety rules and regulations. Dealing with work orders related to Preventive and Corrective maintenance of the equipment installed in the field. Preparation of the Daily Maintenance reports and Alarm reporting and submitting it to the client Responsible for the O&M of Johnson Controls Centrifugal chillers, Dunham Bush Air Handling Units (AHU), Package Air Conditioning Units (PACU) and Emerson Computer Room Air Conditioner Unit(CRAC). Responsible for maintaining fire alarm and detecting system (General fire Alarm system and FM-200 fire suppression system (Honey Well, ETS3 & Notifier) Familiar troubleshooting of all fire Alarm System and equipment Like Use electrical , Heat Detector, Smoke Detector, Flame Detector, Beam Detector (Fire ray) FM 200 Notifier Panel. General Fire alarm Panels, Control Relay module, Monitor module, UM, CC for signal for fire alarm telephone Edward System Technology Responsible for operation and maintenance of Remote Terminal Unit (RTU) and Direct Digital Controller (DDC) and I am working in PLC (Siemens), and BMS (Johnson and control) and SCADA. I have experience of, Building Management System (BMS) • Siemens Desigo Insight 4.01. • Johnson Controls Metastases 2.1. Supervisory Control and Data Acquisition (SCADA) Direct Digital Control (DDC) Fire Alarm System (FAS) GE Security EST Fire Alarm System. Fire Protection System (FPS) Honeywell FM200 Fire Suppression System. Fire-lock NXT S/769 Pre-action System. Fire water pumping system and network.

    • Assistant Engineer
      • Jun 2007 - Mar 2010

      Online Mechatronics trouble shooting of Tetra Fillers and performed all states of TPMS (Tetra Pak Maintenance Service), weekly and monthly checks of A3-SPEED /30V, TBA-22/50V, TBA8/50v and TBA19/30V. Attending Plant Breakdowns for Process Control Instruments, Control Devices and Recovery system. Sound understanding of Preventive/Predictive maintenance techniques. Performed Startup & Shut down activities according to the maintenance point of view. Coordination with Plant Manager and ensure all equipment meets the required safety specification and Standard. Ability to create analyzing report related to Asset failures & Experience in Service planning Activities (Material Resources and scheduling. Installation and programming ability of DSE Module 720 (Deep See Electronics PLC 720) Safe plant operation as per Nestle SOPs. Worked as a team member for implementation of GSTD, DMAIC and TPM activities. Instrument Troubleshooting ability such as TMCC, TPIH, VFD and DMCC, Safety Relay, Sensor, Level Relay, Flow meter, Level Sensor, and Flow Transmitter. Performed risk assessments of all operational activities and Responsible of reducing Maintenance Budget of Plant. Involved in Implementation of Green Belt and Black Belt. Performed shutdown maintenance activities to reduced Breakdown time. Proficiency in using all features of MS Office & Operating SAP generating, Notifications.

Education

  • UNIVERISITY OF ENGINEERING AND TECHNOLOGY LAHORE
    Bachelor's degree, Electrical and Electronics Engineering
    2005 - 2009

Community

You need to have a working account to view this content. Click here to join now