Muhammad Sobieh

Bridges Construction Manager at Samco-National Construction Company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Al Qalyubiyah, Egypt, EG
Languages
  • Arabic Native or bilingual proficiency
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Egypt
    • Construction
    • 300 - 400 Employee
    • Bridges Construction Manager
      • Nov 2022 - Present

      •The intersection between the middle ring road and HSR (high speed railway) excuting a retaining wall with a 980m long.

    • Bridges Construction Manager
      • Jul 2021 - Nov 2022

      •The intersection between the middle ring road and HSR (high speed railway) was a challenging bridge because its structural system of prestressed box girders with a span of 135m long and a total cost of 450 million EGP.

    • Senior Site Engineer
      • Jun 2021 - Jul 2021

      •Jihan elsadat corridor phase two, abridge with a total length of 800m long and total cost of 300 million EGP.

    • Senior Site Engineer
      • Apr 2021 - Jun 2021

      •Gesr Elsuez bridge is the tallest bridge in Egypt with a 23m height above third metro line and 1000m long. The structural system was between precast beams, steel girders and slab on pile with a total cost of 470 million EGP.

    • Senior Site Engineer
      • Dec 2020 - Apr 2021

      •Ain Shams bridge was to connect between the eastern and western ain shams with a total length of 1100m long and a structural system of precast beams, box girders and slab on pile, with an overall cost of 280 million EGP.

    • Senior Site Engineer
      • Jul 2020 - Dec 2020

      •Jihan elsadat corridor phase one with a total length of 1200m through Nasr city. The structural system was precast beams, box girders, steel girders and slab on pile. The project was of a total cost of 700 million EGP.

    • Egypt
    • Construction
    • 700 & Above Employee
    • Senior Site Engineer
      • Mar 2019 - Jul 2020

      •Development of corridors and entrances of 6th of October city phase two consists of 6 bridges of intersections between the middle ring road and wahat road. Structure system of precast prestressed girders and box girders with a total cost of 2 billion EGP. •Development of corridors and entrances of 6th of October city phase two consists of 6 bridges of intersections between the middle ring road and wahat road. Structure system of precast prestressed girders and box girders with a total cost of 2 billion EGP.

    • Egypt
    • Construction
    • 300 - 400 Employee
    • Senior Site Engineer
      • Oct 2016 - Mar 2019

      •Development of corridors and entrances of 6th of October city phase one consists of 5 bridges and 30 Kms on Al fayum highway and middle ring road. Structure system of precast prestressed beams, box girders and slab on piles with a total cost of 1.5 billion EGP. •Development of corridors and entrances of 6th of October city phase one consists of 5 bridges and 30 Kms on Al fayum highway and middle ring road. Structure system of precast prestressed beams, box girders and slab on piles with a total cost of 1.5 billion EGP.

    • Egypt
    • Engineering Services
    • 100 - 200 Employee
    • Resident Consultant Engineer
      • Oct 2015 - Oct 2016

      •Bn Zayed northern corridor in the new administrative capital with a structural system of prestressed beams and slab on piles with a total cost of 250 million EGP.

    • Resident Consultant Engineer
      • Mar 2015 - Oct 2015

      • Defra bridge was connecting between Defra and Helana with a structural system of prestressed beams and box girders with a total cost of 200 millions EGP.

    • civil engineer owner's representative
      • Oct 2014 - Mar 2015

      •The Egyptian army conference hall.

    • Civil Engineer owner's representative
      • Mar 2014 - Oct 2014

      •Al moshir Tantawy bridge in the fifth settlement.

  • Rolan for constructions
    • Qalyub, Qalyubia
    • Summer Trainee
      • Sep 2011 - Sep 2011

      •Summer Training, sewage station at Al-Qanater Al-Khairiya. •Summer Training, sewage station at Al-Qanater Al-Khairiya.

    • Egypt
    • Construction
    • 700 & Above Employee
    • Summer Trainee
      • Aug 2010 - Sep 2010

      •Summer Training, Banha Courts Complex. •Summer Training, Banha Courts Complex.

Education

  • Shoubra Faculty of Engineering - Benha University
    Bachelor's degree, Civil Engineering
    2009 - 2013

Community

You need to have a working account to view this content. Click here to join now