Muhammad Sajid Kiani
Chief Technology Officer at Telephone Industries of Pakistan, Haripur- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Urdu -
-
Arabic -
Topline Score
Bio
Experience
-
Telephone Industries of Pakistan, Haripur
-
Pakistan
-
Telecommunications
-
1 - 100 Employee
-
Chief Technology Officer
-
Nov 2021 - Present
• Lead a team of electrical & mechanical engineers for multiple production activities. • Participating actively for revival of TIP. • Prepare and review technical feasibilities for repair, maintenance & operationalization of existing mechanical structure. • Lead a team for installation of new production lines. • Lead a team for execution of multiple projects in solar, Security surveillance and tower fabrication. • Review & provide approvals of procurement documents technical point of view. • Review and provide approvals for project plans for cost & schedule control. • Coordinate with internal & external clients for multiple activities. • Prepare the annual budgets for the department. Show less
-
-
-
National Radio & Telecom Corporation
-
Haripur, Pakistan
-
HoD SS&SC/ Project Manager
-
Nov 2017 - Nov 2021
• Supervise a team of engineers for complete projects of CCTV & Security surveillance from concept to handover. • Coordinate with multiple departments with in organization for day to day activities. • Coordinate with clients for proposal review, acceptance, approvals & timely execution of projects. • Prepare the project plan and ensure timely completion of all the related activities. • Technical review of the Project design & BOQ before implementation. • Arrange resources for multiple project for complete installation. • Prepare & review multiple reports to update the executive management for the department and multiple projects. Show less
-
-
-
SABIC
-
Saudi Arabia
-
Chemical Manufacturing
-
700 & Above Employee
-
Control System Engineer
-
Feb 2015 - Apr 2017
Working as Control System Engineer in the Inspection and Equipment Reliability Department. I am responsible for • Preventive maintenance for PIMS (Process information management system). • Modifications in the PIMS for any additional requirement. • Make sure the availability of the PIMS for all the user on continuous bases. • Trouble shooting for any fault in the PIMS to reduce the down time of the system. • Trouble shooting, Configuration and modification for the APC (advance process controller) systems for different plants. • Configuration and modification in the DCS system on requirement bases. • Replacement of CMADA system in the Sharq S/S. • Member for RCA, RIS, committee to provide the solution for different problems in the plant. Show less
-
-
-
JAL International Co. Ltd.
-
Oil and Gas
-
700 & Above Employee
-
Senior Engineer Production
-
Oct 2008 - Feb 2015
Manage the production of SCADA SOER, RTU, DFR, Control and Protection panels from start to end as per ISO 9001:2008 quality systems and company procedures. Major responsibilities are: • Planning, Supervision and expediting of manufacturing process as per customer standards and satisfaction. • Resolving technical issue with design section and presenting necessary support and solutions. • Prepare and analyze the daily progress report in order to keep the production as per customer schedules. • Effectively utilization of MS Project to prepare the project schedules, to monitor and control of the projects. • Responsible to generate the purchase order for the raw material according to client standards, relative drawings, design documents and follow up with procurement for the timely delivery of material in order to complete the project on time. • Prepare the job descriptions for all employees in the manufacturing department and update all the existing procedure and work instructions in order to stream line the manufacturing process with ISO 9001:2008 QMS. • Manage all assembly process according to ISO 9001:2008 quality management system. • Reviewing and auditing of product documentation including detailed drawings, assembly drawings, bill of materials, assembly instructions, inspections instructions, purchase specifications, master record index & numerous procedures. • Responsible for preparation and implementation of quality plans, inspection plans, Qualification plans documents with the help of concerned teams. • Working as internal Lead Auditor for ISO 9001:2000 quality management systems and preparing for certification. • Conducting root cause analysis for non-conformance and suggesting corrective and preventive actions for process improvement by using various QC tools including Pareto charts, fish bone diagrams, control charts etc. Show less
-
-
-
-
Assistant Manager
-
2004 - 2008
Take a lead role for establishing the new Screening facility first time in Pakistan.As In-charge Screening Section I was performing the following tasks. • Established Semi Automatic Screening facility in the organization for electronics components. • Prepare test procedures for passive components and relays according to MIL Standards. • Installation and commissioning of vibration machine at facility. • Installation and commissioning of automatic test equipment for discrete devices and voltage regulator • Manage the screening of passive components and relays on 100 % basis • Co ordinate between different departments for the testing of electronics components. Managing the calibration lab. • Effectively use of high and low temperature, humidity, low pressure chambers, vibration machine, automatic test equipment for discrete devices and voltage regulator, impedance analyzer, curve tracer, LCR meter and other normal used hand held equipment • Worked as internal lead auditor for six months for AS9100 Quality Management System Show less
-
-
-
-
Assistant Engineer
-
2003 - 2004
• In-charge manual insertion line in TV assembling plant • Assist the production manager to control the assembling process • Achieve the target to Increase the production from 150 to 200 TVs per day • Manage all production and quality documents. • Effectively use of signal distributed system, CRT color analyzer and automatic soldering machine • In-charge manual insertion line in TV assembling plant • Assist the production manager to control the assembling process • Achieve the target to Increase the production from 150 to 200 TVs per day • Manage all production and quality documents. • Effectively use of signal distributed system, CRT color analyzer and automatic soldering machine
-
-
Education
-
UCET mirpur
Bachlor, Engineering -
F.G. Model High school # 11